Loading...
HomeMy WebLinkAboutHARMONY RIDGE, 2ND FILING - FDP - 49-95G - CORRESPONDENCE - CITY STAFF (7)Sediment/Erosion Control Plan Comments Harmony Ridge Filing 2 August 16, 2004 1. - Plan is incomplete, needing correct notes, schedule, calculations, plan legend, etc. Review will be done when complete submission is made. Second Review January 12, 2005 The notes on plan sheet #2/19 under the heading "Grading and Erosion Control' are incorrect. Please remove and replace with the current City of Fort Collins notes. 2. What is the plan to protect against sediment transport and to restore the offsite sanitary sewer line installation? This should be shown on the erosion control plan sheet. The stormwater pipeline installations should also be indicated and the plan must show required protection for those as well. 3. The plan needs a legend for the BMPs being utilized. There should also be a project schedule on the plan sheet (latest version available from Stormwater Engineering). 4. What is the plan to restore the swale on the east side of the projet (revegetation)? 5. Where are the required PS and EFF calculations and the surety calculation?