Loading...
HomeMy WebLinkAboutHARMONY RIDGE, 2ND FILING - FDP - 49-95G - CORRESPONDENCE - PRIVATE ENTITIESr N 143360 Z.0[ E 3108519.03 / I / / I 1 / l al / y / . N 143J000.+' E 3108661.12 '_.1 g may) N / / , i vo;• z ' x /// GROUND WATL BARRIER (TyP) GROUND WATER BARRIER (TYP.) 5 t00 a+CD s ss - ss • ss w u y N 14 E 31 \ \ STEEL CAS;NG TO SE INSTALLED \VW OPEN TRENCH \ FIICKNESS a 0.6" LENqH 20' h OS CCNCRETE LINING �. i SEE DETAIL LENGTH a 20' f CONTRACTOR TO MATCH EXISTING DITCH CROSS SECTION GEOp1ETRY WrH 4• THICK CONCRETE LINING. CONTRACTOR Sh L.. CCNTAC' TRILBY PRIOLATERAL0 ANYEWORKn"OURS IN THE 01'CH EASEMENT. woz iv F� FoI'�115• concrel�e t p ureW L t oral�h -rrcnAli -r���. w;J Treh VISTA DRIVE w�drg lY LINE A fty �n r view Treet%J ' Page 2 of 2 side needs to be only a few feet from the edge of the Trilby Lateral. The sides of the cut off wall need to extend into undisturbed earth a distance equal to the width of the trench. NO forms should be used on these side wings. The earth should act as the only form and all loose dirt removed. The concrete should be poured directly into the earth. The purpose of this is to form the tightest possible seal between the pipe\trench and the surrounding earth to prevent any water flow. I can be reached for any clarifications at: glstadele@comcas.net comcast.net Work phone 970-679-3483 Home phone 970-226-0719 Cell phone 970-412-0143 1/31/2005 Page 1 of 2 KENTB From: Gary & Lisa Stadele [glstadele 0 comcast. net] Sent: Tuesday, January 25, 2005 8:27 PM To: kentb@jimselldesign.com Cc: Lisa Stadele Subject: Trilby Lateral Comments on Harmony Ridge Filing 2 .From: Gary Stadele Date: January 25, 2005 Trilby Lateral President 828 Scenic Drive Fort Collins, Colorado 80526 ToXent Bruxvoort Senior Engineer Jim Sell Design 153 West Mountain Ave. Fort Collins, Colorado 80524 Subject: Harmony Ridge Filing 2 Comments Kent: This is a follow up to our January 13, 2005 phone conversation. The Trilby Lateral board met on January 1, 2005 and reviewed your Harmony Ridge Filing 2 plans. It is our understanding that most of your development is staying in excess of 100 feet away from the Trilby Lateral ditch and that the hillside between development and the Trilby Lateral will not be disturbed. With this understanding NO concerns surfaced from the board members. The one exception is that an underground pipe crossing of the Trilby Lateral is planned. Our comments are all focused on this crossing. The crossing must be constructed when the water is off in the Ditch. The Water is normally off from about October 15 until May 1. I've attached a redlined section of page 10 of 19 of your plans Please see the attachment for a visual image of the following comments. A 20 foot section of the Trilby Lateral is specified to be concrete lined. The drawing says "Concrete Lining See Detail" , however, I could not find the "Detail" What we want is the floor of the lining to be three inches below the existing grade. The True bottom of the Trilby Lateral is presently covered with about three inches of silt so the lining needs to be at the true ditch bottom. The lining should be two feet wide on the bottom, with sides that slope at a 45 degree angle. The lining should be 2.5 feet deep. The concrete thickness should be four inches. A concrete cut off wall needs to surround the pipe to prevent any water from following the pipe path. The cut off wall needs to be three times the width of the trench that the pipe lays in. The bottom of the cut off wall needs to extend one foot below the pipe. The top of the cut off wall needs to extend to the top of the Trilby Lateral ditch. This requirement will also mean that the cutoff wall on the downhill . 1/31/2005