Loading...
HomeMy WebLinkAboutSHENANDOAH PUD - PRELIMINARY - 47-95 - CORRESPONDENCE - REVISIONS�-5070- r,�o sc .. Northern Engineering also contacted Terry Farrill at the Ft. Collins/Loveland Water District and the South Fort Collins Sanitation District in regard to these proposed site changes. The overall intensity of the site will remain essentially in tact, and they did not express any concerns about the proposed changes, and that additional preliminary documents would not be required. Northern Engineering also contacted Sheri Wamhoff with the City of Fort Collins Engineering Department regarding the revised site plan. If this site plan is approved by the City, State and P&Z Board, Northern Engineering would ensure that close coordination would occur with all reviewing agencies that might have additional comments to the revised site plan in addition to all comments received to date. Thank you for your time and consideration of this project. Please call if you have any questions regarding any issues of an engineering issue pertinent to this project. Sincerely, Roger A. Curtiss P.E. cc: Jim McCory, Colorado Land Source Cathy Mathis, Vaught -Frye Architects Sheri Wamhoff, City of Fort Collins Glen Schlueter, City of Fort Collins Stormwater Utility Terry Farrill, Ft. Collins/Loveland Water District Lucia Liley, March and Myatt U May 30, 1996 Mr. Steve Olt Community Planning and Environmental Services City of Fort Collins PO Box 580 281 North College Avenue Fort Collins, Colorado 80522-0580 RE: Shenandoah Preliminary Revised Site per P&Z Board recommendations Dear Steve, On or about May 30, 1996, Vaught -Frye Architects will be submitting to you a revised site plan for the Shenandoah P.U.D. This letter is intended to address any engineering concerns which may arise regarding the revised site plan. As you are aware, the site is being revised because of suggested changes brought out at the P&Z Board hearing. In particular, proposed Victoria Drive is being realigned so it does not align with Victoria Drive east of College Avenue. Northern Engineering contacted Glen Schlueter regarding the proposed site changes. The primary intent of the site, with regard to stormwater runoff remains intact. I have attached a sketch of the Preliminary Drainage plan, as submitted to the City in January, 1996, and a sketch of the revised site plan. As you can see, the two detention ponds, associated with the original preliminary design have remained in tact, and the four primary drainage outfall points are also in the same location. Therefore, the realignment of Victoria Drive will not have an impact on the intent of the preliminary drainage study submitted and reviewed by the City. Should this new site plan be acceptable to the P&Z Board, and the City staff, the preliminary drainage and erosion control study for this site could be updated to reflect the new site plan. It is the intention of the owner to proceed directly into final design of this preliminary once approval is obtained, and may be an unnecessary step in the review process. 420 SOUTH HOWES, SUITE 202, FORT (0LLINS, COLORADO 80521, (970) 221-4158, FAX (970) 221 -4 159