Loading...
HomeMy WebLinkAboutHARMONY RIDGE PUD, FIRST REPLAT, LOTS 16 - 22 & TRACT 7 - PDP - 49-95E - CORRESPONDENCE - REVISIONS (4)Item 118 -1 have provided more detail for these walls. We find it interesting that the City wanted us to match closely the walls that were provided by Second Filing. We contacted the City and got copies of the details of the walls that were used on Second Filing. Per your request, we used the same materials, configurations, etc. that they used, theirs were approved, and ours were deemed to contain insufficient information - to general. Item 95 - We have used the detail that you provided with this round of comments. Please note that the District does not want any bollards, and will not approve any. Item 98 - I don't understand this comment. The depth of the aggregate was noted on the last submittal. We will attempt to clarify. Natural Resources Item 117-OK Stormwater Utility Item 73 - A signature block has been on the plans for the last several iterations. Item 88- 1 met with Basil to discuss this issue. We have bound the comments into a report. Item 87 - by RJL and Les Jones. This vacation is being done by the plat Item 91 and 104 - We have been using the Erosion Control notes specified by the LCUASS. We have used notes sent to us by Bob Zachely. We have also made reference to the seed mix shown on the plans. Items 71 and 130 - by RJL Item 105 - We have provided more detail for these walls. We would like to reiterate the fact that these are 3' high landscape walls, per request of Natural Resources, and not retaining walls. I hope that this finally addresses all of the concerns and comments from City Staff. Let me know if you have any questions regarding any of the information contained in this letter, or in the revised utility plans. Sincerely, Roger A Curtiss, P.E. Project Engineer cc: Les Jones - Overland Homes Rick Lewis - RJL Surveys 420 SOUTH HOWES, SUITE 202, FORT COLLINS, COLORADO 80521, (970) 221-4158, FAX (970 )221-4159 N NORTHERN ENGINEERING SERVICES, INC. TO: Steve Olt City of Fort Collins Planning FROM: Bud Curtiss, P.E. DATE: January26, 2003 RE: Response to City comments dated January 7, 2003 Steve, This letter is intended to respond to Staff comments dated January 7, 2003 regarding the Harmony Ridge PUD, First Replat, Lots 16-22 and Tract 7, PDP #49-95E I will address items that are pertinent to Northern Engineering's construction plans and drainage study. Other items I have listed to be resolved either by Les Jones or by RJL Surveys Current Planning Item 76 - To be addressed by Les Jones Item 120 - To be address by RJL Surveys Item 121 - OK Item 122 - In the letter from the Ditch Company, he mentioned 4 items, labeled as A,B,C, and D A - To be addressed by others. Per request of Susan Joy, the culvert is still shown on the plans, with a note that it is shown for reference only B - The 1' depression has been noted on the plans C - This silt fence has been added to the plans D - We have added the Erosion Control fabric as indicated on their sketch Engineering Item 119 - I think we feel that we have been working closely with staff to resolve these issues. Item 115 - by RJL Item 116 - OK 420 SOUTH HOWES, SUITE 202, FORT COLLINS, COLORADO 80521, (970) 221-4158, FAX (970 )221-4159