HomeMy WebLinkAboutHARMONY RIDGE PUD, FIRST REPLAT, LOTS 16 - 22 & TRACT 7 - PDP - 49-95E - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: 4ei-c15F_ a vac t eLLY=C_ Put)
Planner:
Traffic Operations:
Date: lot
Engineer: ct
Items Requested
Redlined Items Being Returned
v
°�' c ' Other Items being
"' - a � Returned
0
Engineering
Stormwater
v
in
J
a
i
t
v
fu
fu
•� cl�Other
0
quired
Items Refu
Water/Wastewater'^""'£
_Traffic Operations
Transportation Planning
1
Tra n sfo rt
Natural Resources
Park Planning
C o wi wlF
TOTALS 4Go�ry
2,
Other:
Note: All redlined items should be returned with the resubmittal/revisions.
+ etegx�- *�-- wk�ee 4 s d -(;(-- - -6
REVl,)-ION ROUTING SHCET mac,,,%,} Z
ITEM: _MM-Ze)4,,d o,� �-
tA
_ 11
DATE RECEIVED:
�
�"
"'
'l.
U
W
�
QZ�
F
z o
Q�
V•
'� t/
w o
z�
z�
z o
.•�
LL Z
O Z
� W
FILE: PROJECT PLANNER
ENGINEERING PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
TECHNICAL SERVICES
FORESTRY
CLD
PFA
POLICE — LORI DIGLIANI
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE / THOMPSON
AT & T DIGITAL CABLE
CDOT
DITCH COMPANY Teri
RAILROAD: UP or BNSF
REA/DOE/PRPA
I riIt
v v,,f
5c �