HomeMy WebLinkAboutESKIN PUD - PRELIMINARY - 48-95 - CORRESPONDENCE - RESPONSE TO APPLICANT'FE 5r 1l u PUD
A1.TeeJJA-n Vc- A
BUSINESS
SERVICE USES
POINT CHART E
For All Criteria
Applicable Criteria Only
Criterion
Is
the
Criterion
Applicable
Yea No
I II III IV
Circle
the
Correct Score
Muiripller
Points
Earned
IXII
Maximum
Applicable
Polio
a. Transit Route
X
2
0
2
—
b. Sot'in College Corridor
X.
X
2
0
4
—
8
c. Part of Center
X
X
2
0
3
—
6
d. Two Acres or More
X
I
X
2 1.0
3
--
6
e. Mixed -Use
X
X
2
0
3
—
6
f. Joint Park `ng
1
2
0
3
&0-
"
g. Energy C -)nservation
X
112131410
2
8
h. Contiguity
X
X
2
0
5
10
I. Historic Preservation
1
2
0
2
J.
1
2
0
k.
0
I.
:E2
0
.._.
Totals �4 ,50
v vl
Percentc:�e Earned of Maximum Applicable Points V/VI = VII L�B
vu
Land Development Guidance System for Planned Unit Developments
r
The City of Fort Collins, Colorado, Revised March 1994
- 73 .
n
4P
MM,1�4
2-7/5
attorneys, insurance agents, etc.); we do not want a noise factor, upstairs from
our business, to deal with.
2. POINT CHART E (See attached) We feel we have sufficient points to qualify
for an all office space PUD. Criterion (c) should be answered yes. We are
contiguous with the commercial area directly to our west. We also feel that we
are an excellent transition from the high impact commercial that starts at the
corner of College and E. Drake and abuts our property on the west. These
additional points would put us over the 50% needed.
3. EXPENSE We would like to use our preliminary plan, that is in your file, as
our proposed plan for this amended preliminary and final. We know we have to
add some landscaping details and obtain drainage reports etc. but we would like
to avoid spending more money on plans that we have done and redone over and
over again.
4. CO-OPERATION Now more than ever we need this PUD. Drake is already a
major east -west street and the expansion is going to bring it even closer to our
front door. This building will never be acquired for a single family dwelling
again. We feel that this is very obvious. We would like the city's co-operation in
helping us keep the additional expense of this PUD to a minimum. We have
noticed how the city can push projects through with very little public attention,
such as the Drake expansion. We were not notified by mail as to any
neighborhood meetings or any Council meetings. If we had known in a more
timely manor about the expansion we feel that our expenses to date would have
been considerably less. We would have continued our original request with our
original plans. We think it probably would have been approved because there
are similar situations in town that have already set precedents for this same
type of PUD: The Camera Shop at Prospect and Shields is a perfect example. It is
in a much more residential area, then we are, with no commercial abutting it.
Please respond to
our proposal, in writing, prior
to March 15.
Time is becoming
an issue and we
do not want to go any further
with pursuing
this or negotiating
with the city on
the Eminent Domain until we
hear from you.
Yours truly,
Avram and Belinda Eskin
123 E. Drake Rd.
Ft. Collins, CO. 80525
2-28-96
Dear Mr. Blanchard:
We are writing to you' to make some requests that we feel are appropriate and
logical.
You are probably somewhat familiar with our PUD and the process that we have
already been through.
We originally requested a PUD to turn our building at 123 E. Drake Rd. into all
professional office space and personal service shops. After our neighborhood
meeting and submitting our preliminary plans it was suggested by Mike Ludwig
that we go for a mixed use of professional office space on the first floor and a
residential apartment on the second floor. We were basically told that the City
staff would not support all professional office and the P&Z Board would follow
suit. So we amended our request because any PUD approval would be better
than no change. In January we got an preliminary approval from the P&Z Board
for professional office/residential rental.
Not more than one week later we got a call from the city engineers and was first
told of the plans to expand Drake on our block. This planned expansion would
bring Drake about seven feet from our front door. This will- drastically impact
the usefulness of this property as any type of residential dwelling. Even the
appraiser, that the city sent, voiced his opinion that; "If this were vacant land no
one would ever buy it for residential 'use."
So that is why we are writing to you. We want to amend our plans back to all
professional office and personal service shops. We would like the city's co-
operation in doing this as much as they want our co-operation in acquiring our
land. We do have some hurdles to get over, they are:
1. PARKING The neighbors would like to see all additional parking to abut the
commercial to the west instead of on the Harvard side. We have room to put
seven spaces on that side. If all of our existing spaces could be "grandfathered"
in as "legal" spaces we would have a total of at least thirteen spaces plus the
availability to share existing parking with the State Farm office next door. We
feel this is plenty for our planned usage. Our office takes up the first floor (1755
sq.ft.). We now operate with only six spaces and 90% of the time we have only
two vehicles in addition to our own in the lot. We could leave the seven back
spaces vacant for the offices occupying the second floor (1835 sq.ft.). We plan to
rent this space to low density professional offices (i.e., accountants, engineers,
Must be for the
Ill neighborhc<xL
use and enjoyment of the residents of the project and/or surmunding
[2) Must be ar -,ved by the City.
(d) No final plan shall be approved for any portion of a planned unit development- approved
with a residential density bonus for providing neighborhood public facilities until the
necessary legal documents have been submitted and approved.
(7) Existing Neighborhood or Community Path or Community Facility
(a) To qualify for points on the Density Chart, an existing neighborhood or community part
or community facility muse
Ill be intended for use by the public, and
(2l be developed, under development. or funded and programmed for developmenL
K. Variance Procedures
The Planning and Zoning Board is empowered to grant variances to the provisions of this section.
The decision of the Planning and Zoning Board on any application for a variance shall be set forth in
writing in the minutes of the meeting of the Board. Variance,requests may be granted if the Board
determines that the granting of the variance would neither be detrimental to the public good nor
impair the intent and purposes of this section, and if the applicant demonstrates:
(1) That by reason of exceptional topographical, soil, or other subsurface; conditions or other
conditions peculiar to the site, undue hardship would be caused to a subdivider by the strict
application of any provisions of this section. or
(2) That by reason of exceptional conditions or difficulties with regard to solar orientation or
access, undue hardship would be caused to a subdivider by the strict application of any
provisions of this section. or
(3) That the plan as submitted is equal to or better than such plan incorporating the provision for
which a variance is requested, or
�) That the granting of a variance from the strict application of any provision would result in a
substantial benefit to the City by reason of the fact that the proposed project would help
satisfy a defined community need (such as affordable housing or historic pre=vation) or
would alleviate an existing problem (such as traffic congestion or urban blight), and the strict
application of such a provision would render the project practically unfeasible.
L. Enforcement of the Requirements and Conditions of PUD Approval.
The occturence of either of the following events may subject the applicant to the enforcement
remedies contained in Sections 29-4 through 29-9 of the Code:
(1) Failure to comply with any terms, conditions. or limitations contained on the site plan,
landscape plan, building elevations or other approved documents pertaining to a planned unit
development which has received final approval from the City.
(2) Failure to comply with any conditions of record imposed by the Planning and Zoning Board
upon its review of the overall development plan or preliminary or final plans for the planned r,
unit development under the provisions of this section.
Land Development Guidance System for Planned Unit Developments
The City of Fort Collins, Colorado, Revised September 1994
. 108 -
than one hundred (100) full-time employees during a single eight hour shift"? While
your property is contiguous to commercial development on the west, that is not a
shopping center or office park. Nor is your property functionally a part of that
development.
EXPENSE: If you propose to change the proposed uses approved in your preliminary
application, you will need to resubmit a new preliminary application. We will continue to
only charge the small project development review fee of $200.00. However, you will
obviously have the necessary expense to prepare the appropriate documents for a
complete application including final utility plans.
COOPERATION: We will cooperate with you in the processing of whichever application
you choose to submit to the extent possible. However, our review of any proposed
PUD is governed by City Code as it is outlined in the Land Development Guidance
System. The acquisition of right of way and the expansion of Drake Road is not one of
the review criteria that staff or the Planning and Zoning Board consider. You should be
aware that if you choose to pursue an all commercial application and continue to fail the
point chart, there is a variance procedure available. Even if staff does not support the
variance, you would have the opportunity to make your case in front of the Planning
and Zoning Board. I am including a copy of the variance criteria that would have to be
justified to gain approval of a variance.
By the way, there are both similarities and differences in comparing your property with
the Camera Shop. While the Camera Shop does not currently have commercial
development in the area as you indicated, the City is currently reviewing a large
commercial project proposed for the property directly across Prospect Road; the
Camera Shop is located directly at the intersection of two major arterials; and, while it
did receive a variance from the Business Service Uses point chart, approval was
conditioned on the requirement that it provide both commercial and residential uses in
the structure and that it provide adequate parking as required by the Code.
I trust this information will be helpful as you decide how to proceed with your
development proposal. Should you have any questions, please feel free to contact me.
Sincerely,
Robert E. Blanchard, AICP
Current Planning Director
cc: Mike Ludwig, City Planner
Community Planning and Environmental Services `MkkA- �.
Current Planning
March 13, 1996
Avram and Belinda Eskin
123 E. Drake Road
Fort Collins, CO 80525
Dear Mr. and Mrs. Eskin:
Thank you for your letter expressing your desire to amend your preliminary PUD
approval to allow your entire building to be used for office space and personal service
uses.
Should you decide to pursue a change to the approved preliminary, you will need to
submit either a new, amended preliminary application or submit a combined
preliminary/final application reflecting your new proposal. While I recognize your
concern over the pending widening of Drake Street, the street project itself does not
enter into staffs analysis or the awarding of points on the Business Services Point
Chart used to evaluate your proposal.
In your letter, four "hurdles" were referenced:
PARKING: Any request for an entirely commercial use of your property would require a
minimum of 16 parking spaces. This calculation is based on the standards
recommended in the City's Parking Program. My understanding is that you only have
the ability to provide 11 off-street spaces at this time since two of the spaces adjacent
to Harvard Street do not conform to City Code. As you noted, there is the opportunity
to share parking with the State Farm office. Before that is accepted by the City as a
potential solution, a joint parking agreement would have to be negotiated (your
preliminary application only received partial points on this line item since you had
negotiated only a joint access agreement).
POINT CHART E: Your proposal does not meet criterion "c" of the Business Service
Uses Point Chart (Point Chart E) as you contend. Specifically, this criterion asks: "Is
the project contiguous to and functionally a part of a neighborhood or
community/regional shopping center, an office or industrial park, located in the Central
Business District, or in the case of a single user, employ or will employ a total of more
281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (970) 221-6750
FAX (970) 221-6378 TDD (970) 224-6002