' The results of the analysis with supporting calculations demonstrating the pond's total capacity,
inflow/outflow can be found in Appendix F.
3.3 Erosion Control
Because the Cathy Fromme open space is downstream from the majority of the site, sediment
control will be critical. Most of the area from this site contributing runoff to the open space will
either be undisturbed or will pass through a water feature/quality ponds that will act as sediment
' trap, inlet filters or pond outlet pipe filters, in perimeter silt fence, or by straw bale check dams
located in the channels and drainageways. A sediment trap is being installed at DP-17 and Basin
D 1 for additional silt control. Long term erosion protection will include re -seeding of all
disturbed areas, channel bed stabilization, and pipe outlet rip -rap. The onsite measures and the
natural processes present in the existing drainageways should ensure no detrimental effects to
water quality in the Burns Tributary. Erosion control calculations and the erosion control cost
estimate can be found in Appendix G.
'] LWA #99104.62
proposed inlets so that inlet capacity is not affected.
The results of the Storm Sewer Analysis and Design with supporting calculations and model
outputs are presented in Appendix C.
3.2.3 Inlet Analysis
All of the proposed inlets will be CDOT Type R curb inlets. All of the inlets will be in sump
conditions and will intercept the 100-year runoff. The results of the inlet analysis and design
with supporting calculations are presented in Appendix D.
3.2.4 Rip -Rag and Swale Design
Proposed swales were designed to prevent erosion caused by storm runoff. In cases where this
could not be accomplished by grade control, appropriate rip -rap was used. Proposed swales were
evaluated with a program which utilizes Manning's Equation to determine flow depth and
velocity based on input design flows, bed slopes, channel cross section, and roughness
coefficients.
The effects of developed flows from this site on the two proposed storm drain system's rip -rap
pads were analyzed to determine the size of the pipe outlet.
A summary of the rip -rap requirements for this site and our analysis of the swale is presented in
Appendix E.
3.2.5 Detention Pond Analysis
The existing detention pond located southeast of this site was used to reduce developed flows
that continue southerly within the existing channel. With an inflow of approximately 55 cfs, the
pond will peak in about 30 minutes in a 100-year event. Our analysis of the detention pond
indicates that 0.42 acre feet of active capacity is required. The 100-year ponding elevation was
determined by the flowline elevation of the existing outlet pipe.
Gl
LWA #99104.62
this portion of the Burns Tributary, which is tributary to Fossil Creek. Although detention is not
required in the site, storm water quality is an important consideration because of the Cathy
Fromme open space the site discharges to. Storm runoff from Basin A will be collected at low
points in the streets and routed through a storm drain system and outlet into a sediment basin.
Runoff from this basin will be routed via swale to an existing drainageway that flows in a
southerly direction under the existing irrigation canal.
Basin B discharges to the existing pond located southeast of this site. Runoff from this basin is
collected entirely from low points in the streets and conveyed directly to the existing pond via
storm sewers.
Basins C, D, E, F, G and H are small basins that sheetflow in a southerly direction. Sub -basin
C1 in Harmony Ridge Filing No. 1 features a water feature/quality pond that will serve as
sediment control and modified detention.
The results of the Rational Method Hydrologic Analysis with the methodology of calculations
is shown in Appendix A.
3.2.1 Street Capacity
Street encroachment criteria for the streets was taken from Table 4-1 (minor storm) and Table
4-2 (major storm) of the SDDC. Capacity calculations for all of the streets to assure that the
runoff did not exceed criteria and will function below the allowable capacities. The results of
the Street Capacity Analysis can be found in Table 3 with supporting calculations presented
Appendix B.
3.2.2 Storm Sewer Desien
Storm Lines 1 and 2 will allow for most of the runoff from Basin A and B to be intercepted and
directed to an existing drainageway or detention facility. The lines were analyzed with
StormCad and pipes sized such that hydraulic grades remain at or below the flow line of
5 LWA #99104.62
utilized to determine the time of concentration.
tC=t;+tt
where tc is the time of concentration in minutes, t; is the initial or overland flow time in minutes,
and t1 is the travel time in the gutter in minutes. The initial or overland flow time was calculated
with the SDDC manual equation.
t1 = [1.87(1.1 - CC &0.5hs)0.33
where L is the length of overland flow in feet (limited to a maximum of 500 feet), S is the
average basin slope in percent, C is the composite runoff coefficient, and Cf is the storm
frequency coefficient. The formula limits the product of CCf to 1.0 and when the product
exceeds this value, 1.0 is used in its place. Gutter (or channel) travel times were determined by
calculating the flow velocity within the conveyance element assuming a flow depth equivalent
to a minor storm. The travel time was then determined by dividing the gutter flow length by the
velocity. This procedure for computing time of concentration allows for overland flow as well
as travel time for runoff collected in streets, gutters, channels, or ditches. After the peak runoff
was calculated, design point runoff was calculated. This was done by combining all contributing
areas upstream of a given design point. The time of concentration for the design point was taken
as the greatest time of all the contributing sub -basins.
3.2 Drainage Plan Development
The proposed drainage plan consists of a combination of overland flow and gutter flow. The
runoff will sheetflow across landscaped yards and common areas, then concentrate at proposed
street low points, drainage swales, or in a detention pond. Gutter flow in streets will be collected
at low points via curb inlets and then conveyed to the channels or ponds via a storm sewer
system. Sub -basins were delineated based on proposed grading. Final grading and basin
delineation are shown on the Final Drainage and Erosion Control Plan sheets which can be found
in the back of this report.
This site lies within the study area of the Fossil Creek Basin Master Plan (Simons & Li). Per this
master plan, no detention is required and we have confirmed that no detention is required within
4 LWA #99104.62
3.0 DEVELOPED CONDITIONS PLAN
3.1 Design Criteria
The drainage system presented in this report has been developed in accordance with the criteria
established by the City of Fort Collins Storm Drainage Design Criteria and Construction
Standards Manual (SDDC) dated May 1984 and revised in January 1997. Where applicable,
design guidelines and information were also obtained from the Denver Regional Council of
Government Urban Storm Drainage Criteria Manual (USDCM).
Developed condition hydrology was evaluated based on the 2-year and 100-year storm
frequencies as dictated by Table 3-1 of the SDDC manual. Detention of developed flows from
the north end of this site is not specifically required by the McClellands Basin Master Plan but
is provided by this design. The southern portions of the development are within the Fossil Creek
Basin in which there is no requirement for detention so historic runoff computations were not
necessary for this site.
Because of the limited size of the sub -basins on the site, the Rational Method was selected to
calculate runoff. The Rational Method utilizes the SDDC manual equation.
Q = CCfIA
where Q is the flow in cfs, C is the runoff coefficient, Cf is the storm frequency coefficient, I is
the rainfall intensity in inches per hour, and A is the total area of the basin in acres. The runoff
coefficient, C was calculated from Table 3-3 of the SDDC manual based on the proposed
developed condition land use. A composite runoff coefficient was calculated for each sub -basin
based on the percentage of impervious surface (C = 0.95) and pervious surface (C = 0.20). Cf
was taken from Table 3-4 of the SDDC manual and was determined to be 1.0 for the 2-year
storm and 1.25 for the 100-year storm. The appropriate rainfall intensity was taken from the
updated rainfall intensity duration curve in Figure 3-1 of the SDDC manual. To obtain the
rainfall intensity, the time of concentration had to be determined. The following equation was
3 LWA #99104.62
2.0 HISTORIC CONDITIONS
The site currently lies within the Fossil Creek Drainage Basin. The site has a variety of native
grasses and shrubs with some cactus in the higher areas and some small volunteer Russian Olive
trees in the wetter drainageways.
Vegetation is moderately dense consisting mostly of dryland grasses and some cactus. Rocks
of moderate and small sizes are present and the topsoil appears to be underlain by gravel and
bedrock.
The site drains in a southerly direction and discharges runoff to the Burns Tributary in the Cathy
Fromme Prairie open space.
An existing irrigation lateral flows east to west along the southern property limits of the site.
This ditch is still in use by others and will remain in use after this development is completed.
It is suspected that the ditch may leak and could contribute moisture to the downstream
drainageway.
2
LW A #99104.62
Rva i:.
�mr�a,tt
1.0 INTRODUCTION
1.1 Scope and Purpose:
This report presents the results of a final drainage evaluation for the Harmony Ridge P.U.D.
Filing No. 2. A hydrologic analysis of the proposed development plan was completed to
determine the location and magnitude of the storm runoff. The hydrologic data was then used
to evaluate conveyance and detention facilities based on City criteria.
1.2 Project Location and Description:
The Harmony Ridge P.U.D. Filing No. 2 is a proposed townhome residential site. The property
is located in the Northwest Quarter of Section 3, T6N, R69W of the 61h Principal Meridian,
Larimer County, Colorado. The site is bounded on the north by Harmony Road, on the east by
Harmony Ridge P.U.D. Filing No. 1, on the south by the Cathy Fromme Prairie, and on the west
by unplatted vacant land. A vicinity map illustrating the project location is provided in Figure
1.
The Harmony Ridge P.U.D. Filing No. 2 consists of approximately 14.12 acres. The townhome
site has a net density of approximately 8.11 du/ac. The development will consist of 123
townhome units with garages. The townhomes will be two story buildings with walkout
basements.
1.3 Previous Studies:
The Final Drainage Report and the Final Report Addendum for the Harmony Ridge P.U.D. (TST,
Inc., January 20, 1999 and June 20, 1999 respectively) were reviewed prior to the preparation
of this report. Portions of the Preliminary Drainage Study for the Overlook at Arapaho Farms
P.U.D. (RBD, Inc., 1996) and the Fossil Creek Drainage Basin M.D.P.S. were reviewed for
information pertinent to this development.
LWA #99104.62
J
TABLE OF CONTENTS
1.0 Introduction
Page
1.1 Scope and Purpose ........................................... 1
1.2 Project Location and Description ................................ 1
1.3 Previous Studies.............................................1
2.0 Historic Conditions ................................................ 2
3.0 Developed Conditions Plan .......................................... 3
3.1 Design Criteria..............................................3
3.2 Drainage Plan Development ................................... 4
3.2.1 Street Capacity ......................................... 5
3.2.2 Storm Sewer Design ................................... 5
3.2.3 Inlet Analysis ......................................... 6
3.2.4 Rip -Rap and Swale Design .............................. 6
3.2.5 Detention Pond Analysis ................................ 6
3.3 Erosion Control.............................................7
Fizur_es
Figure 1 - Location Map
Technical Appendices
Appendix A - Rational Method Analysis
Appendix B - Street Capacity Analysis
Appendix C - Storm Sewer Design
Appendix D - Inlet Analysis and Design
Appendix E - Rip -Rap and Swale Design
Appendix F - Detention Pond Analysis
Appendix G - Erosion Control Calculations
Sheets
Drainage & Erosion Control Plans
Leigh
&� II Whitehead?Associates, Inc.
ENGINEERS, SURVEYORS & PLANNERS
January, 2000
Basil Hamden
City of Fort Collins Stormwater Department
P.O. Box 580
Fort Collins, CO 80522
RE: Harmony Ridge P.U.D.
Dear Mr. Hamden:
2720 EAST YAMPA STREET, SUITE I
COLORADO SPRINGS, CO 80909-5061
TELEPHONE 719-63&5179 / FAX 719-63G5199
In accordance with the requirements of the City of Fort Collins Subdivision Ordinance, a
drainage report and plan has been prepared for the proposed Harmony Ridge development.
This report has been prepared under the current City of Fort Collins Drainage Criteria.
Five (5) complete copies of the drainage report and plan are hereby transmitted for your review
and approval. If there are any questions or comments concerning this report, please contact the
undersigned.
Sincerely,
Leonard A. Beasley Date
Project Engineer
DAMD I WIiMEAD
FINAL
DRAINAGE REPORT AND PLAN
FOR
HARMONY RIDGE P.U.D. FILING NO.2
January, 2000
Leigh
p,Whitehead
(-•Associates Inc.
CONSULTING CIVIL ENGINEERS & SURVEYORS
2720 EAST YAMPA STREET, SUITE 1
COLORADO SPRINGS, CO 80909-5061
LWA Project No. 99104.62