HomeMy WebLinkAboutHARMONY RIDGE PUD, FIRST REPLAT, LOTS 16 - 22 & TRACT 7 - PDP - 49-95E - SUBMITTAL DOCUMENTS - ROUND 6 - ROUTING SHEET (4)Project:
Planner: Ck�r_ Traffic Operations:
Date: 2�
Engineer: '
Items Requested
Redlined Items Being Returned
o
y
a
�
D
CA
- 0
0
Other Items Required
.°I
"'
c
_o
a
�
� ..
0
Other Items being
Returned
Engineeringr
Stormwater
I
Water/Wastewater
Traffic Operations
Transportation Planning
Tra nsfo rt
Natural Resources
1
Park Plannin
TOTALS-" `
Other:
I Note: All redlined items should be returned with the resubmittal/revisions.
REVISION ROUTING SHEET —'?cLrcA 4
II
•
■
FILE: PROJECT PLANNER
ENGINEERING PAVEMENT
W91011011BUILDING
�---_----_-
INSPECTION
LIGHT • POWERTECHNICAL
�----------
SERVICES
1 -
------�----
�C���
WATER • ` ` P!f 1.LJMMMMMM--M----
POLICE LORI DIGLIANI
------�---_
ADVANCE PLANNING
------------
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICEPUBLIC
-----_------
SERVICE
SCHOOLS: ' 1' 1 ' 1
-----------
AT & T -DIGITAL CABLE
1
-----_--_-�
DITCH COMPANY
RAILROAD: UP or BNSF