HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE 2 (2ND FILING) - PRELIMINARY / FINAL - 49-95D - CORRESPONDENCE - VARIANCE REQUEST3
March 20, 2001
Mr. Glen Schlueter
City Of Fort Collins
Stormwater Department
281 N. College Avenue
Fort Collins, CO 80524
Re: Harmony Ridge P. U.D. SECOND FILING
Project NO. 0927-010
Dear Glen:
This letter Is in response to staff comments of January 19, 2001 regarding the above
reference project.
Also, this letter is for the purposes of requesting a variance to City Standard per the
SDDC section 1.2.7.
After discussions with Mr. Gary Studele, President of the Trilby Lateral Ditch Company,
It was determined that the Impact of our amount of storm drainage that would enter the
Ditch Company's facility would not be more than historic and would enter the facilities in
.a sheet flow manor and not concentrated. We feel that with the proposed design of the.
retaining walls, the amount of drainage cascading over the walls and that which will be
directed to the drainage weep holes In the proposed walls will not exceed the ditch
company's criteria and would be best conveyed in a sheet flow manor. The only concern
that Mr. Gary Studele had concerning this issue was the avoidance of construction
drainage from entering their facilities. We have assured Mr. Studele that appropriate
measures would be taken and have addressed that issue by modifying the Silt Fence
Detail, as shown on sheet 4 of 18 of the Utility Plans. Please refer to that sheet for
clarification. We are proposing that detail for the entire length of the Trilby Lateral Ditch.
Should you have further questions or comments, please do not hesitate to contact me.
Sincerely,
TST, INC. CONSULTING ENGINEERS
isWarA. Dvoral D
RAD/amb
TST, INC. 748 Whalers Way - Building D
CFort Collins, CO80525
Consulting Engineers
(970) 226-0557
Metro (303) 595.9103
Fax (970) 226-0204
Email info@tsdnc.com