HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE 2 (2ND FILING) - PRELIMINARY / FINAL - 49-95D - CORRESPONDENCE - VARIANCE REQUEST3 March 20, 2001 Mr. Glen Schlueter City Of Fort Collins Stormwater Department 281 N. College Avenue Fort Collins, CO 80524 Re: Harmony Ridge P. U.D. SECOND FILING Project NO. 0927-010 Dear Glen: This letter Is in response to staff comments of January 19, 2001 regarding the above reference project. Also, this letter is for the purposes of requesting a variance to City Standard per the SDDC section 1.2.7. After discussions with Mr. Gary Studele, President of the Trilby Lateral Ditch Company, It was determined that the Impact of our amount of storm drainage that would enter the Ditch Company's facility would not be more than historic and would enter the facilities in .a sheet flow manor and not concentrated. We feel that with the proposed design of the. retaining walls, the amount of drainage cascading over the walls and that which will be directed to the drainage weep holes In the proposed walls will not exceed the ditch company's criteria and would be best conveyed in a sheet flow manor. The only concern that Mr. Gary Studele had concerning this issue was the avoidance of construction drainage from entering their facilities. We have assured Mr. Studele that appropriate measures would be taken and have addressed that issue by modifying the Silt Fence Detail, as shown on sheet 4 of 18 of the Utility Plans. Please refer to that sheet for clarification. We are proposing that detail for the entire length of the Trilby Lateral Ditch. Should you have further questions or comments, please do not hesitate to contact me. Sincerely, TST, INC. CONSULTING ENGINEERS isWarA. Dvoral D RAD/amb TST, INC. 748 Whalers Way - Building D CFort Collins, CO80525 Consulting Engineers (970) 226-0557 Metro (303) 595.9103 Fax (970) 226-0204 Email info@tsdnc.com