Loading...
HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE 2 (2ND FILING) - PRELIMINARY / FINAL - 49-95D - CORRESPONDENCE - CITY STAFFi TST, INC. 10. Acknowledged 11. Acknowledged 12. Acknowledged 13. Planner will address this comment. Erosion Control 1. Acknowledged 2. Second page to the end of Appendix F. Sincerely, TST, INC. CON T NG ENGINEERS Mike R.Ja son March 20, 2001 Mr. Basil Harridan City of Fort Collins Stormwater Utility Department P.O. Box 580 Fort Collins, CO 80522-0580 Re: Harmony Ridge P.U.D. Second Filing Project No. 0927-010 Dear Mr. Hamdan: The following are the responses to the Stormwater comment sheet dated 12/04/2000: 1. All top of foundation elevations were set at 0.5 feet above the highest elevation of the lot. The drainage slopes away from the building envelope in the front and back.. Typically the sides of the building envelopes have swales. There are a few Instances where drainage needed to flow from back to front and spot elevations were placed to reflect this. 2. Section G-G and H-H were added with spot elevations to clarify this. 3. A variance is being requested for the runoff in Sub basin E1 that crosses the Trilby Lateral Ditch. The historic drainage pattern hasn't been altered, the flow rate has decreased from historic, the historic concentration points haven't changed and we believe the quality of runoff hasn't changed. I spoke with Gary Stadele, the president of the Trilby Lateral Ditch whose concern was sediment runoff Into the ditch. We have added a 1 foot ditch inside of the silt fence to capture sediment during construction. 4. Water Quality Pond A was added upstream of the retention pond. 5. Entire swale has been rip rapped. 6. Drainage Is directed into existing drainage and utility easements. 7. Acknowledged 8. Trilby Lateral Ditch signature block added. 9. The north flowline of Fromme Prairie Way will enter the existing roadside ditch and the south flowline will enter a sidewalk culvert where It will flow south to the natural drainage way. TST, INC, 748 Whalers Way -Building D Consulting Engineers Fort Collins, CO 80525 (970) 226-0557 Metro (303) 595-9103 Fax (970)226-0204 Email lufo@tsdnc.com www.tstlnc.corn