HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE 2 (2ND FILING) - PRELIMINARY / FINAL - 49-95D - SUBMITTAL DOCUMENTS - ROUND 5 - ROUTING SHEETProject:�9�i�1Di1/Y
Planner:Wnem
STD
Traffic Operationt:
Date: z � o
Items Requested
Site Land Plat I Utili Drainage R t Other Items Required
Redlined Items Being Returned
Site land Plat Utility Drainage R t Other items Being Returned
Engineering
\<
k
X
Stormwater
Water/Wattewate
Traffic Operations
A
Trans. Planning
X
Tran*rt
Natural Resources
Park Planning
jotals
Gj
::22
Z.
Other:
Note: All redlined items should be returned with the resubmittal revisions.
i
Revisions Routing Sheets
Item: 1A #
Date•
F-ejh 4
.GC `�q
FILE: PROJECT PLANNER / VI
ENGINEERING: PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER _
MAPPING / DRAFTING
FORESTRY i
FIRE
POLICE
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE / THOMPSON
CABLE TV
STATE HIGIIWAY DEPARTMENT
DITCH COMPANY Tri��7 C2te
RAILROAD: UP or BN/CS
REAIDOE/PRPA
N