Loading...
HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE 2 (2ND FILING) - PRELIMINARY / FINAL - 49-95D - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETPlanner:T— fngineer: Traffic Operations: Date: Items Requested Site I Land I Plat Utility Drainage R t Other Items Required Engineering 7 k �; Redlined Items Being Returned Site land I Plat Utility Draina e fl t Other Items Be( Returned Stormwater Water/Wastewate Traffic Operations Trans. Planning Transfort Natural Resources Park Planning„; Totals � Other: Note: All redlined items should be returned with Me resubmittal/ revisions. CI �1 i Revisions Routing Sheet Item: [#' - ] ` Date: 7-00-0 m o4 �a afro qo 1 4 L �rli.A++�i �tL ``�T"��C•'(�.y1 y i�r q'O .L� � ck o� 1`Q 46C l%rYT`e FILE: PROJECT PLANNER - ENGINEERING: PAVEMENT ZONING BUILDING INSPECTION LIGHT & POWER MAPPING / DRAFTING FIRE POLICE I/ , � ADVANCE PLANNING STREETS R.O.W. PLANNING WATER CONSERVATION ' POST OFFICE US WEST PUBLIC SERVICE SCHOOLS: POUDRE / THOMPSON CABLE TV STATE HIGHWAY DEPARTMENT DITCH COMPANY t hl6� LAZX-4{ RAILROAD: UP or BN/CS REA/DOE/PAPA Aec 5.07--97 Gav^iAtA M} +6