Stormwater (Basil Harridan)
19. Stormwater needs a revised grading plan and did not get one.
Natural Resources (Kim Kreimeyer)
20. Natural Resources wants to see plans for the building product and size. Building
elevations and envelopes should be provided.
21. How will the larger lots affect the approved Landscape Plan?
22. Natural Resources wants to see a grading plan.
Transportation Planning (Kathleen Reavis)
23. Is the current bicycle path location going to change? Information about this
should be provided.
This completes the staff comments at this time. Additional comments will be
forthcoming as they are received from City departments and outside reviewing
agencies.
Under the development review process and schedule there is a 90 day plan revision
submittal time -frame mandated by the City. The 90 day turnaround period begins
on the date of this comment letter (October 19, 2000) prepared by the project
planner in the Current Planning Department. Upon receipt, the revisions will be
routed to the appropriate City departments and outside reviewing agencies, with their
comments due to the project planner no later than the third weekly staff review meeting
(Wednesday mornings) following receipt of the revisions. At this staff review meeting
the item will be discussed and it will be determined if the project is ready to go to a
public hearing before an administrative hearing officer for a decision. If so, it will be
scheduled for a date in the near future.
Please return all drawings red -lined by City staff with submission of your revisions. The
number of copies of revisions for each document to be resubmitted is on the attached
Revisions Routing Sheet. You may contact me at 221-6341 if you have questions about
these comments or would like to schedule a meeting to discuss them.
Sincerely,
S eve Olt
Project Planner
m
9. A copy of the comments received from Mark McCallum of the Engineering
Department is attached to this comment letter. A red -lined copy of the replat,
with additional comments, is being forwarded to the applicant. Please contact
Mark, at 221-6750, if you have questions about his comments.
10. Basil Hamdan of the Stormwater Utility is asking that the applicant please
provide a revised grading plan if new grading is being considered with these new
building envelopes.
11. Jim Slagle of Public Service Company stated that they have no comments or
concerns regarding this replat.
The following general concerns were discussed at the Staff Review Meeting on October
11, 2000:
Planning
12. The final replat will be approved by the Director of Planning, not the City
Council. The signature block on the plat should read....."Approved by the
Director of Planning of the City of Fort Collins....." and undersigned by the
Director of Planning.
13. What is the reason for the larger lots? The previously approved buildings would
fit into the previously approved lots. If the buildings are planned to get bigger,
then a minor amendment will probably be necessary. Also, the approved
minimum 50' separation between buildings in this area must be maintained.
14. The standard note regarding "Notice of Other Documents" (attached) must be
added to the plat.
Engineering (Mark McCallum)
15. Lots 21 and 22 encroach into the old right-of-way for Morning Dove Lane.
16. The Vicinity Map does not have enough information. Such things as zoning on
this and adjacent properties, the Cathy Fromme Prairie Natural Area, the Ridge
residential development to the east, residential development to the north, and
how these 3 lots fit into Phase 1 of Harmony Ridge needs to be on the map.
17. There is lots of incorrect information on the plat.
18. Technical Services has indicated that there are significant problems associated
with this replat.
6. The Technical Services (Mapping/Drafting) Department offered the following
comments:
a. Per the description, the subdivision plat should show and monument all of
Tract 7.
b. It appears that Dusty Sage Loop does not match the previous plat. This
replat needs to show dimensions on the street.
C. Where did the 30' sewer easement come from? The 30' easement cannot
be located with the information shown.
d. The plat has problems and Technical Services will need to see it again.
Please contact Jim Hoff, at 221-6588, if you have questions about these
comments.
7. The City of Fort Collins Water/Wastewater Department stated that this project is
in the Fort Collins -Loveland Water and South Fort Collins Sanitation
Districts service area.
8. Doug Moore, a City Natural Resources Planner, offered the following
comments:
a. Please contact either Kim Kreimeyer, at 221-6641, or Doug Moore, at
224-6143, with answers to the following questions:
- How are the buildings going to be placed on the lots?
- Will there be building envelopes on the lots? If so, show what they
look like.
- Have the building sizes changed?
- Is there a change in the type of the building product?
b. Lot 20 is not stepping back as previously approved.
C. Natural Resources would like to see the size of the buildings (masses)
and the open areas (voids) between the lots. Will they remain the same as
on the previously approved plat?
d. It appears that the changes made to the lots will effect the approved
Landscape Plan, which would require a minor amendment to the
approved plan. Please address how the landscaping will be changed if
this replat is approved.
Please contact Doug, at 224-6143, if you have questions about these comments.
Commu^;ty Planning and Environmental "-rvices
Current l .anning
City of Fort Collins
October 19, 2000
TST, Inc.
c/o Rich Dvorak
748 Whalers Way — Building D
Fort Collins, CO. 80525
Dear Rich,
Staff has reviewed your documentation for the Harmony Ridge PUD, Replat of Lots
20, 21, and 22 that was submitted to the City on September 27, 2000, and would like to
offer the following comments:
1. Dennis Greenwalt of AT&T Cable Services stated that they have no comments
or concerns regarding this replat.
2. Mike Spurgin of the Post Office stated that they have no comments or concerns
regarding this replat.
3. Peter Barnes of the Zoning Department stated that they have no comments or
concerns regarding this replat.
4. Rick Lee of the Building Inspection Department stated that there are no
Building Code issues at this time.
5. Michael Chavez of the Poudre Fire Authority offered the following comments:
a. The turnaround at the end of the street must have an outside turning
radius of 40' or more and an outside turning radius of 20'.
b. Fire hydrants are required, with a maximum spacing of 600' along an
approved roadway. Each hydrant must be capable of delivering 1,500
gallons of water per minute at a residual pressure of 20 psi. No
commercial building can be greater than 300' from a fire hydrant.
C. Address numerals shall be visible from the street fronting the property and
posted with a minimum of 6" numerals on a contrasting background
(example: bronze numerals on brown brick are not acceptable).