HomeMy WebLinkAboutHARMONY RIDGE, 2ND FILING - FDP - 49-95G - SUBMITTAL DOCUMENTS - ROUND 2 -February 4, 2005
Mr. Steve Olt
Current Planning Department
281 N. College Avenue
P.O. Box 580
Fort Collins, CO 80522
RE: Harmony Ridge Filing 2
Resubmittal of Final Compliance Plans
Dear Steve:
LANDSCAPE ARCHITECTURE
PLANNING
ENGINEERING
GRAPHIC DESIGN
On behalf of our Client, Global Holdings of Colorado LLC, we are resubmitting a package of plans and
reports to document final compliance of the Harmony Ridge Filing 2 project. The attached transmittal
form lists the plans and documents submitted. A response to comments letter is also attached that
describes, one -by -one, how each comment was addressed.
In addition to the various required project design plans, reports and documents are attached to address
other means by which Land Use Code criteria are met:
❑ Signed easements to allow off -site work in Tract 7 of Harmony Ridge Phase I
❑ A brief report addressing potential conflicts between residents and wildlife
❑ A wetland mitigation report
❑ Architectural guidelines for the homes that will back up to the Cathy Fromme Prairie (Lots 1-22)
❑ A report on mineral rights ownership
Comments received from the Trilby Ditch Company were received and were addressed with these
resubmitted plans. The comments were included in our response to comments letter.
We thank you for the City's continued expeditious review of these plans and reports. Please call me with
any questions or comments.
Sincerely,
JIM SELL DESIGN, INC.
0- &4��
Kent Bruxvoort, P.E.
Project Manager
cc: Jim Newcomb, Global Holdings of Colorado, LLC
153 WEST MOUNTAIN AVENUE FORT COLLINS, COLORADO 80524 P970.484.1921 F970.484.2443 INF-0i.nJIMSELLDESIGN.COM JIMSELLDESIGN.COM