HomeMy WebLinkAboutHARMONY RIDGE, 2ND FILING - FDP - 49-95G - CORRESPONDENCE - PROJECT SUBMITTAL AND RESUBMITTALSteve Olt - Re FW: Harmony Ridge II u e Page 1 i
From: Marc Virata
To: jnewc@frii.com,jons@jimselldesign.com
Date: 04/03/2005 11:14:00 AM
Subject: Re: FW: Harmony Ridge II update
Jim,
We will need paper copy sets for review before agreeing to go to mylar, I've communicated this to folks at
Jim Sell last week. Assuming no issues with the paper copies, yes, we'll go to mylar and I'll keep my
paper copy set of the plans to use to formulate the DA.
Thanks,
Marc
Marc P. Virata, P.E.
Civil Engineer II
City of Fort Collins - Engineering Department
Phone: (970) 221-6605
Fax: (970) 221-6378
mvirata@fcgov.com.
>>> <jnewc@frii.com> 04/01/05 10:36 PM >>>
Jon and Eric:
Good work. Sounds like the plans are approved and ready for mylars. I have
read the satisfation for Triby Lateral as well. Certainly I will be back
in town Monday morning. I will look for your appointment time to deliver
the final pages to Marc I am ready for a Development Agreement.
TKS JIM
> Now that we have most of the comments, we can get a final polished set
> together. Doug Moore called Eric back and said that the comments
> regarding
> the trail connection have been adequately addressed. Doug is also ok with
> the 8-inch sewer pipe for the sub -drain to the pond since Stormwater has
> accepted it. I talked to Terry Farrill this morning -please read the
> message
> to Gary that I cc'd to you about he crossing. Terry Farrill said that he
> won't accept a vault because it will be too close to his waterline, but he
> is OK with the current proposal of moving the existing box to 1 foot south
> off the sidewalk.
> I think we should be ready Monday afternoon to start the process. Are you
> going to be back in town by Monday? We should sit down with you first and
> go over the changes.
> Jon Sweet
CC: SOLT@fcgov.com,erics@jimselldesign.com,dkarst@ncfspecialists.com