Loading...
HomeMy WebLinkAboutHARMONY RIDGE - OVERALL DEVELOPMENT PLAN - 49-95 - CORRESPONDENCE - CITY STAFF (4)Mr. Joe Vansant October 12, 1995 Page 2 of 2 In addition to these major points, other comments are included on the preliminary utility plan. If you have questions regarding any of these, please contact me at 221-6854. Sincerely, 10 Roger Buffington, P.E. Systems Engineer cc: Steve Olt Mike Smith Mike DiTullio Utility , vices Water & Wastewater October 12, 1995 Mr. Joe Vansant Positive Environments Inc. P.O. Box 98 Fort Collins, CO 80522 RE: Harmony Ridge PUD Dear Mr. Vansant: We have completed our review of the initial submittals for the Harmony Ridge PUD. There are two important points of which we feel need clarification early in the development process. First, the proposed development site is located within the service area of the Fort Collins -Loveland Water District. The District would normally provide water service to this site. As we have previously discussed, the City will consider providing service if there are logical reasons for doing so. If cost is an issue, estimates prepared by an engineer or utility contractor must be submitted for review. These estimates should take into account the specific site conditions and the proposed water main layout for this development. Secondly, the preliminary utility plan which was submitted indicates that service will be provided by the City; however, the plan does not meet City standards. In order to meet City requirements, the following major changes must be made: 1. A second point of connection to the City distribution system must be added. This point of connection will be at the intersection of Harmony Road and Regency Drive. Phase 1 of the development must include installation of a 12-inch main in Harmony Road from Regency Drive to the main entrance into Harmony Ridge. An 8-inch branch main connecting this 12-inch to the northeastern cul-de-sac will also be required. 2. In Phase 2, the extension of the 12-inch main in Harmony Road to the western entrance into the development will be required. 3. All water main in the development must be ductile iron pipe installed with polyethylene encasement. P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6681