HomeMy WebLinkAbout1ST STOP PLAZA - MINOR SUBDIVISION - 53-95 - CORRESPONDENCE - REVISIONSADVANCED PLANNING
1. Show location of Pinion Street on the west side of college.
Now shown.
2. Who will Pinion extend east.
The existing access way to the east is 16 feet wide. To obtain
a 50 foot R.O.W. we are assuming that you will in the future
obtain 17 feet from the south property owner and at that time
obtain 17 feet from our property. This is a real remote
possibility as the 15 acres to the east of our development is
almost entirely within the floodway, therefore no development.
There appears to be less than an acre of ground that is not in
the floodway. That is why we are showing the connection
through our parking lot as a future access. If sometime in the
long range future there is a need to extent Pinion and the
immediate difficult of the existing building directly south of
our property is resolved, then our parking would be
approximately eight feet from this future R.O.w. It would also
be possible to construct a 28 foot wide street. We have no
need for street parking off site. As you have seen the wider
street such as Bristlecone only attracts semi truck long term
parking which we would not appreciate. A 28 foot wide paving
section in a 36 foot wide R.O.W. would require 10 foot of
R.O.W. on each side in addition to what is currently
available. In the future this would be much more palatable to
us and provide us a better landscape setback.
3. What is to happen on the property to the east.
I don't have any idea.
4. Crosswalks.
Now shown on the plan.
This concludes our response and inclusion of your comments into our
resubmitted plan. If you have any additional concerns please let me
know so we can work these out as expediently as we can.
Sincerely:
Fredric J. Hattman
3. Floodway location.
The location of the floodway was originally coordinated and
located in conjunction with Mike Grimm. We have reverified
this work and believe it to still be correct.
4. Easements for drainage way to Dry Creek and improvements to
drainage way.
It was previously verified that the easement for the drainage
way is a public easement. This is in the Auto Zone file. Glenn
was noted this before as well as our owners have verified this
with the property owners to the east. We will provide the
drainage way improvements noted on the redlined plan for this
area.
5. Erosion control.
Erosion control improvements have been detailed at Dry Creek.
6. Calculations for 100 year capacity of drainage way to Dry
Creek.
These calculations have been added to the report.
7. Redesign detention reflecting overland flow.
Calculations and redesign has been provided.
8. Identify outflow pipe of plan.
Plan addition has been made.
9. Do not exceed 1 foot depth for parking lot detention.
Grading plan has been revised.
10. Additional redline comments.
Plan and report have been revised.
PARRS
1. Change location of trees and tree type as shown.
Changes have been made.
2. Add note as to permit for work in R.O.W.
Note has been added.
5. Need 5 foot landscaping strip behind Skibo Subdivision
property.
We have provided 6 feet to this property line.
6. Need 6% interior landscaping.
We have provided a plan showing over 8W interior landscaping.
BUILDING
1. Accessibility for site.
We are providing a plan showing the accessible route for the
project for your review. We will provide the signs noting the
accessible route. We have provided painted crosswalks for
these routes. We have added one more handicapped parking space
for lot one. We have elevated the parking stalls as well as
the access way at each handicapped space.
2. Fire sprinklers.
Buildings A & B are over 5,000 s.f. each and will be provided
with automatic fire sprinkler systems.
3. Second floor accessibility.
The second floor is an archery range. This area will have an
occupancy load of less fifty people.
4. Health Department submittals.
The food service areas in Building B and Building C will be
submitted for Health department review.
5. Building A setback.
We understand the Fire rated construction required by the
building setback.
STORM DRAINAGE
1. Floodway grading.
We have revised the plan eliminating contour changes to the
floodway.
2. Floodplain permit.
We have sent Mike Grimm plans and drainage report for his
review.
WATER CONSERVATION
1. Provide note on plan.
Note added.
2. Phone call concerning sod seed mix.
Sod will be fescue and not bluegrass/fescue mix.
LIGHT AND POWER
1. Move electric service from overhead to underground. The
underground service needs to be adjacent to College Ave. and
an easement for this service line needs to be provided.
We are working on acquiring a ten foot easement along College
Ave.
2. Trees need to conform to Tree/Streetlight Standard.
We have coordinated the landscaping to the Tree/Streetlight
Standards.
3. Coordinate Transformer location.
We have started talks concerning transformer location and will
have this item resolved by time of Building Permit.
ZONING
1. What is this?
This is a Minor Subdivision/Site Plan Review. This is HB use
by right zoning application.
2. Ground Sign.
3. Additional planting along the south property line.
We have revised the plan adding trees along the south property
line.
4. Minimum 15 foot setback on College.
We have provided a 16 foot setback.
Plat
1. Same comment as #2 above.
Same answer.
Utility Plan
1. Comments #1 & #2 above.
Same answer.
2. College Ave. sidewalk to be 7 foot wide.
So revised.
3. Show barricade or wheel stop at future access.
Wheel stops shown on plan.
4. Grading concern.
Grading plan has been revised.
5. State Highway Access Permit.
We previously submitted this information, please advise us of
the status on this item.
POUDRE FIRE AUTHORITY
1. Fire sprinklers for buildings A & B.
Shown and will be provided.
2. Fire hydrant.
Currently shown on the plans.
3. Maintain access to buildings as shown currently.
So maintained.
MAPPING
1. Plat - Spelling.
Spelling corrected.
2. Plat - show easements.
Easements added.
December 28, 1995
Steve Olt
Project Planner
City of Ft. Collins
Ft. Collins, CO
LETTER HAND DELIVERED
RE: 1ST STOP PLAZA
Dear Steve;
GEFROH HATTMAN
ARCHITECTS/PLANNERS
CONSTRUCTION MANAGEMENT
303-223-7335 0 FAX 303-223-9000
145 West Swallow Road
Fort Collins, CO 80525
The following is a response to the comments made by the various
departments concerning the project. I will go through each of the
department review list and briefly state the concern and follow
this by our response to the issue.
WATER & WASTE WATER
1. Provide easements for water mains and fire hydrants.
These utility items will be provided with easements.
2. Coordinate landscaping and utilities.
Said coordination is made on the revised plans.
3. Maintain 5 foot separation between utility lines and curb and
gutter.
Plans have been so revised.
4. Plan comments.
Plan notes landscaping and utility conflict.
ENGINEERING
Site Plan
1. Drive width.
City parking lot guidelines allow drives to be 20 feet wide.
2. College Ave. dedication and easements.
An additional 20 foot R.O.W. and a 15 foot easements is now
provided adjacent to College Ave.