Loading...
HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE ONE - FINAL - 49-95B - CORRESPONDENCE - TRAFFIC STUDYFrom: Eric Bracke To: FCI.CPES.SOLT Date: 2/17/98 11:31am Subject: Harmony Ridge Traffic Study - dated 7/8/1997 Steve, I have had an opportunity to review the Harmony Ridge supplemental traffic study prepared by Matt Delich and offer the following comments: 1. The supplemental traffic study did not address the 5-10 year horizon with the assumption that no improvements were made to the intersection of Shields and Harmony. I am of the opinion that the information is not necessary since we know that with the increased growth of approximately 3.5% per year, the intersection will fail. This analysis only shows what we already know. 2. The analysis of the intersection only included short term (1998) and that improvements could be made by the City or developer that would bring the intersection to acceptable levels of service. However, the problem that exists at the intersection is a short term (20 minute) peak hour problem. 3. The study did not address the expansion of the FRCC and Registry Ridge since only 1998 was analyzed. 4. I have concerns about the condition placed on the developer by the P&Z Board since this is not an analysis that we would have normally required for such a small trip generator. 5. I suggest that the developer contact Mat Delich and provide a memo -form report that looks at a 5-10 year horizon with no improvements, and the FRCC expansion. The Registry Ridge traffic will be included in the background projections. Eric CC: FCI.ENG NET.DSTRINGER