Loading...
HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE ONE - FINAL - 49-95B - CORRESPONDENCE - CITY STAFF (9)downstream discharge from these ponds into the potential natural area shall be designed to minimize potential channel instability and shall take into account the bicycle trail crossings of the drainage channels. The stabilizing measures could include both structural and non structural (vegetative and bio technical) measures. All of these measures shall be reviewed and approved by the Natural Resources Division, from a technical and aesthetic standpoint, and by the Stormwater Utility, for conformance with drainage design criteria, prior to Planning and Zoning Board approval of the final PUD. CC: MFATER From: Glen Schlueter To: BHAMDAN, FCI.CPES.SOLT Date: 2/17/98 4:21pm Subject: Harmony Ridge PUD - Final -Reply Steve, The first condition was met with the sale agreement to Natural Resources by reserving the easements. You might ask the Engineering Department if we have "legal" copies of the easements. The second condition has sort of been met. If it was intended that they have a final approved drainage study and construction plans, then no that is not done. On the r hand go by what we used to do with LDGS projects and put the condition on the final for approved utility plans then yes they are ready for board approval. They do show BMPs and stability measures but we have not checked the calcs. We foresee at least one more round of review if not more before we are ready to sign. Just for your info, one piece we have been asking for is detailed lot grading with lot corner elevations, break points, etc which they have not yet provided. We will hold final signature for this and a few other items. we have not completed the last submittal which is due to engineering on February 24 according to our board. Glen >>> Steve Olt 02/17/98 08:54am >>> Glen and Basil, Harmony Ridge PUD - Final is scheduled to go to the P & Z Board on March 5th. The following two conditions (in bold) were placed on the preliminary approval. Have they been met and how do I address this in my staff report that is scheduled to go to the printer tomorrow? 1. Letters of intent for necessary off site drainage easements, to allow the stormwater from Harmony Ridge PUD to pass across the natural area (including the Cathy Fromme Prairie) into the Burns Tributary, must be provided at time I of submittal of the final PUD documents. The actual easement agreements must l be provided to the City by the plan revision due date for the final PUD / review. The easement agreements must be accepted by the Stormwater Utility prior to Planning and Zoning Board approval of the final PUD. f/ 2. At time of submittal of final PUD documents the developer must provide design for the stormwater conveyance channels and structures from the Harmony Ridge PUD to the Burns Tributary to the south. Upon review it will be determined if the design adequately addresses the Stormwater Utility's requirements and meets the requirements as set forth in All Development Criterion A 1.9 in the LDGS. The runoff generated by the development shall be routed through water quality (treatment) sedimentation ponds prior to being released into the potential natural area acquisition property. Such ponds shall be designed in accordance with Volume 3 of the UDFC District's Drainage Criteria Manual or other industry Best Management Practices standard and shall comply with the City of Fort Collins design criteria and standards. Any