Loading...
HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE ONE - FINAL - 49-95B - CORRESPONDENCE - CITY STAFF (13)Transpc tion Services Engineering Department City of Fort Collins July 8, 1998 Dear Mr. Vansant: The City of Fort Collins Engineering Development Review Department recently met with you to discuss the access problems associated with the Harmony Ridge P.U.D.. The City realizes the hardships placed on your development to provide the Seneca St. connection to the New Harmony Rd. alignment. Staff has decided to allow this development to utilize Chokecherry Trail as a primary access temporarily and construct a temporary secondary access which uses the Old Harmony Rd. alignment to tie in to Seneca St.. The following requirements shall be met in order for the temporary access to be constructed and utilized. 1.) Provide an escrow for the purchase of R.O.W., design, and construction of the Seneca St. connection to New Harmony Rd. plus 25% prior to the issuance of any building permits. 2.) No more than 25% of total buildout of this site can occur with the temporary access conditions. Additional buildout will require dedication and construction of Seneca Street connecting to New Harmony to function as the primary access. If at such time, the Seneca Street R.O.W. has not been dedicated to the City, the Developer has the right to ask the City Council to consider condemnation procedures to obtain the necessary R.O.W.. 3.) No building permits will be issued for in Tract 3 or the three buildings in Tract 2 adjacent to Chokecherry Trail until Seneca Street improvements and connection to New Harmony are complete. 4.) Design of temporary conditions must be complete and submitted for review to the City by 11:30 AM on Friday July 10, 1998 for this project to be heard at the July 16' Planning and Zoning Board Hearing. Attached are redlines showing our thoughts on the alignment of this temporary secondary access. If you have any questions concerning these conditions or if I can be of further assistance please contact me at (970)221-6605. Sincerely, Michael K. Dean, P.E. Civil Engineer I xc: Dave Stringer Matt Baker Eric Bracke Steve Olt Lucia Liley file 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605