HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE ONE - FINAL - 49-95B - CORRESPONDENCE - PRIVATE ENTITIESi
F
Jim & Sandy Robbins
S801 So. SMolds St
Fort Collins, CO. $0526 970-226.3312
Craig Foreman, P.E.
2 81 N. College Avenue
Fort Collins, CO 805 244
Dear Craig:
It%.
Jim and Sandy Robbins
5801 So. Shields St.
Fort Collins, CO 80526
June 5, 1998
Hi! Just a note to thank you for all you have done to try and get our Trilby
Lateral back in operation You have gone the extra mile to help us, and I for
one appreciate your efforts and expertise very much.
I had a meeting with Joe VanSant yesterday about their development. He
stated that you had met with him on many occasions. He mentioned our
access into the ditch where we have come in for over 100 years. There is a
culvert that has been there every since my parents purchased our farm in
1959. He says you want to make a handicap accessible trail coming down to
the crossing? My input would be that the path come straight down the
grade, and be wide enough for our backhoes and equipment to get to the
ditch, to work on it. I would like to see a bridge instead of the culvert. The
bridge would have to be wide enough and strong enough to hold a back hoe,
tractor, pickup, etc... I was thinking it would need to be 12 feet wide. The
over the ditch bridges are better for you and for us, as they allow access, and
no kid could get trapped if they were fooling around in time of high water.
Any cutting of the ditch, will require that the soil be compacted and
bentonite used to seal the ditch.
Thanks again for all your help Craig. Give me a call if you have any
questions
Sincerely,
9�-
Jim Robbins