Loading...
HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE ONE - FINAL - 49-95B - CORRESPONDENCE - CITY STAFF (11)1 /3c) / 9) 6 PROJECT STATUS: HARMONY RIDGE This project is scheduled to go to P&Z on Thursday, 5/7 without the required offsite ROW for the Seneca Street connection to `new' Harmony. This item was allowed to go to the board by the City Manager. Issues that may come up at the hearing include: *The trail connection from the development to the Cathy Fromme Prarie - talk with Kathleen Reavis to get updated on that issue; `Old' Harmony Road - is to be left `as is' (with a driveway type intersection with Seneca) to serve as the access road to the trail head at Taft Hill Rd. - after such time as the Overlook at Arapahoe Farms develops (the comercial piece to the North of Harmony Ridge) the trail head access will wind through their (Overlook's) site within a public access esmt and connect with `old' Harmony Rd to the West of their site; *Seneca street through the Overlook commercial site will be within a 58' ROW with detached sidewalks within access easements. The street shall be designed with 48' of pavement (two 6' bike lanes, two 12' travel lanes, one 12' turn lane) 5' parkway strips and 4' detached sidewalks. This was agreed upon with all the players in the room. The players include: Joe Vansant, planning consultant to the developer Lee Stark, owner/developer Rich Dvorak, TST engineering consultant Dave Peitenpol, developer of Overlook at Arapahoe Farms Tricia Kroetch, Overlooks's consulting engineer Other issues: *The utility plans still need a bit of work, Rich Dvorak doesn't want to submit revisions until the project goes to public hearing. As you may recall, I presented a lengthy list of variance requests to the TransCoord. group, most of which were denied. Keep a close eye on intersection alignments and approach grades.