Loading...
HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE ONE - FINAL - 49-95B - SUBMITTAL DOCUMENTS - ROUND 1 - STORMWATER-RELATED DOCUMENTSEARTH ENGINEERING CONSULTANTS, INC. June 25, 1997 Positive Environments, Inc. P.O. Box 98 Fort Collins, Colorado 80522 Attn: Mr. Joe Vansant Re: Subsurface Hydrogeologic Study Harmony Ridge P.U.D. Fort Collins, Colorado EEC Project No. 1972027 Mr. Vansant: It is our opinion that a groundwater hydrologic study will not be required for the Harmony Ridge development. The groundwater study is required when designing an underdrain system to mitigate high groundwater levels. We do not anticipate the need to install an underdrain system for the Harmony Ridge project. We appreciate the opportunity to be of service to you on this project. If you have any additional questions concerning this project, please do not hesitate to contact us. Very truly yours, Earth Engineering Consultants, Inc. Lester L. Litton, P.E. Principal Engineer LLL/dmf cc: Rich Dvorak - TST, Inc. CENTRE FOR ADVANCED TECHNOLOGY 2301 RESEARCH BOULEVARD, SUITE 1 04 FORT COLLINS, COLORADO 80526 (970) 224-1522 (FAX) 224-4564