Loading...
HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE ONE - FINAL - 49-95B - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: Planner: e Engineer: _ - �� 44-e— M- k-e. r. u��;�� i —I ���s� Date: .. (t;11+ Traffic Operations: ce I � 8A4-/,'1 Engineering Site Items Requested I land Plat I Utility I Drainage Rpt Other Items Required X Redlined Items Being Returned Site land Plat Utility Drainage Rpt Other Items Being Returned Stormwater Water/Wastewate Traffic Operations X Trans. Planning Tramfort Natural Resources X Park Planning X Totals Other: 2 2 Note: All redlined items should be returned with the resubmittal/ revisions. 1. ..... ..............