HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE ONE - FINAL - 49-95B - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject:
Planner: e
Engineer: _
- ��
44-e—
M- k-e.
r. u��;�� i —I ���s� Date:
.. (t;11+ Traffic Operations:
ce I �
8A4-/,'1
Engineering
Site
Items Requested
I land Plat I Utility I Drainage Rpt Other Items Required
X
Redlined Items Being Returned
Site land Plat Utility Drainage Rpt
Other Items Being Returned
Stormwater
Water/Wastewate
Traffic Operations
X
Trans. Planning
Tramfort
Natural Resources
X
Park Planning
X
Totals
Other:
2
2
Note: All redlined items should be returned with the resubmittal/ revisions.
1.
.....
..............