Loading...
HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE ONE - FINAL - 49-95B - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYHCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 07-06-1997 Center For Microcomputers In Transportation Streets: (E-W) harmony (N-S) shields" Analyst: Matt File Name: Area Type: Other 7-6-97 am pm-'.�c.., LT Comment: 1998 plus developments Eastbound Westbound ; Northbound Southbound L T R; L T R L T R; L T R ---- ----1---- ---- ----;---- --------;---- ---- ---- No. Lanes ; 1 1 1 1 1 1 ; 1 1 1 ; 1 1 1 Volumes ; 135 515 90; 70 180 145; 40 415 135; 315 400 45 PHF or PK1510.90 0.90 0.90;0.90 0.90 0.900.90 0.90 0.90:0.90 0.90 0.90 Lane W (ft);12.0 12.0 12.0;12.0 12.0 12.0112.0 12.0 12.0112.0 12.0 12.0 Grade 0 i 0 0 O % Heavy Veh; 1 1 1; 1 1 11 1 1 11 1 1 1 Parking ;(Y/N) N ;(Y/N) N $(Y/N) N ;(Y/N) N Bus Stops 0; 0; 0; 0 Con. Peds 0; 0; 0; 0 Ped Button ;(Y/N) Y 14.5 s;(Y/N) Y 14.5 s;(Y/N) Y 14.5 s;(Y/N) Y 14.5 Arr Type ; 3 3 3; 3 3 3; 3 3 3; 3 3 3 RTOR Vols ; 0; 0; 0; 0 Lost Time ;1.00 3.00 3.00:1.00 3.00 33.0011.00 3.00 3.0011.00 3.00 3.00 Prop. Share; ; . ; Prop. Prot.; 33; 33; 29; 29 _______________________________________________________________________ Signal Operations Phase Combination 1 2 3 4; 5 6 7 8 E6 Left * * ;N6 Left Thru * ; Thru Right * ; Right Peds * Peds WB Left * * iS6 Left Thru * ; Thru Right * Right Peds * ; Peds NB Right * ;EB Right S8 Right * ;W8 Right Green 7.OA 26.OA ;Green 12.OA 25.OP Yellow/AR 4.0 5.0 ;'fellow/AR 4.0 5.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay L05 ----- - -- ------- ----- ----- ----- --- ----- --- E6 L 495 1787 0.303 0.476 9.0 6 24.3 C T 627 1881 0.912 0.333 31.3 D R 617 1599 0.122 0.511 7.4 8 WB L 282 1787 0.277 0.478 11.4 B 11.5 8 T 627 1881 0.319 0.333 14.6 6 k 817 1599 0.197 0.511 7.7 6 NB L 382 1767 0.115 0.500 9.1 B 20.8 C T 564 1881 0.817 0.300 25.2 0 k 675 1599 0.222 0.422 10.7 6 SB L 382 1787 0.916 0.500 33.9 D 27.1 0 T 564 1881 0.787 0.300 23.7 C k _ 675 1599 0.074 0.422 10.0 B Intersection Delay = 22.3 sec/veh Intersection LOS = C Lost Time/Cycle, L = 8.0 sec Critical v/c(x) = 0.878 _______________________________________________________________________ HCM: SIONALIZED N EpQt ECTtt((11N Sg1MMARR// r n )) dd 07-06-1997 E en%a F25r, M58roLbmpuY ers Y� �rl a9nspb�tation Streets (E-W) harmony (N-S) shields - Fd P-T )19-,e Analyst: Matt File Name: Area Type: Other 7-6-97 am pm 27 L T Comment: 1998 plus developments Eastbound ; Westbound ; Northbound ; Southbound L T R L T R; L T R; L T R --------;---- --------;---- --------1---- ---- ---- No. Lanes ; 1 1 1 ; 1 1 1 ; 1 1 1 ; 1 1 1 Volumes ; 80 350 60; 150 455 420; 65 425 105; 260 435 105 PHF or PK15;0.90 0.90 0.90:0.90 0.90 0.9010.90 0.90 0.90:0.90 0.90 0.90 Lane W (ft);12.0 12.0 12.0;122.0 12.0 12.0;12.0 12.0 12.0112.0 12.0 12.0 Grade ; 0 0 0 0 % Heavy Veh; 1 1 1; 1 1 1; 1 1 1; 1 1 1 Parking ;(Y/N) N ;(Y/N) N ;(Y/N) N ;(Y/N) N Bus Stops 0; 0; 0; 0 Con. Peds 0; 0; 0; 0 Ped Button ;(Y/N) Y 14.5 s;(Y/N) 'Y 14.5 s;(Y/N) Y 14.5 s;(Y/N) Y 14.5 Arr Type 3 3 3; 3 3 3; 3 3 3; 3 3 3 RTOR Vols ; 0; 0; 0; 0 Lost Time ;1.00 3.00 3.00:1.00 3.00 3.00;1.00 3.00 3.0011.00 3.00 3.00 Prop. Share; i Prop. Prot.; 33; 33; 29; 29 ------ ----------- --- -------- ---- -------- ------- ----------- ---- ---- Signal Operations Phase Combination 1 2 3 4; 5 6 7 8 EB Left * * ;NB Left Thru * Thru Right * ; Right Peds ' ; Peds WB Left ' ;SB Left *" Thru * ; Thru Right ' ; Right Peds * Peds NB Right * ;EB Right x SB Right * ;WB Right iireen 7.OA 26.OA ;Green 12.0A 27.OP Yellow/AR 4.0 5.0 :Yellow/AR 4.0 5.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 _______________________________________________________________________ Intersection 'Performance Summary Lane Group: Adj Sat Vic g/C Approach: Mvmts Cap Flow katio Ratio belay LOS Delay LOS ----- ---- ------- ----- ----- ----- --- ----- --- EB L 282 1787 0.316 0.456 11.6 6 16.7 C T 585 1881 0.6E5 0.311 19.4 C k 782 1599 0.066 0.489 7.9 B WB L 289 1787 0.578 0.456 13.1 B 19.1 C T 585 1661 0.665 0.311 27.9 D k 782 1599 0.597 0.489 11.6 6 N6 L 381 1767 0.169 0.522 6.9 6 18.6 C T 606 1881 0.779 0.322 22.3 C R 711 1599 0.165 0.444 9.7 B 56 L 381 1787 0.759 0.522 16.7 C 19.9 C T 606 1661 0.797 0.322 23.1 C k 711 1599 0.165 0.444 9.7 B Intersection Delay = 18.8 sec/veh Intersection LOS C Lost Time/Cycle, L = 8.0 sec Critical v/c(x) - 0.857 ---------------------------------------------------------------------- 4 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 07-05-1997 Center For Microcomputers In Transportation ------- -------'--- ---------......................... --------- ----------- Streets: (E-W) harmony (N-S) shields Analyst: Matt File Name: L 2T- / Area Type: Other 7-5-97 am pm �C Comment: 1997 1996 plus developments Eastbound I Westbound Northbound ; Southbound L T R : L T R L T R I L T' R �____ ____ ____---- ____ ____I____ _-__ _______- -___ ---- No. Lanes 11 1 1 ; 1 1 1 1 1 1 i 1 1 1 Volumes 135 515 90I 70 180 145: 40 415 135: 315 400 45 PHF or PK15;0.90 0.90 0.9010.90 0.90 0.90:0.90 0.90 0.9010.90 0.90 0.90 Lane W (ft);12.0 12.0 12.0;12.0 12.0 12.0;12.0 12.0 12.0112.0 12.0 12.0 Grade 0 0 0 I 0 % Heavy Veh; 1 1 1; 1 1 11 1 1 1; 1 1 1 Parking I(Y/N) N ;(Y/N) N ;(Y/N) N ;(Y/N) N bus Stops 0; 0; 0; 0 Con. Peds 0; 0: 0; 0 Ped Button ;(Y/N) Y 14.5 s;('r/N) Y 14.5 sI(Y/N) Y 14.5 s;(Y/N) Y 14.5 Arr Type 3 3 3; 3 3 33: 3 3 31 3 3 3 RTOR Vols I OI 0; 0: 0 Lost Time :1.00 5.00 3.0011.00 3.00 3.00:1.00 3.00 3.00:1.00 3.00 3.00 Prop. Share; ' Prop. Prot.; ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 Eb Left * INb Left Thru * Thru Right * Right Peds * ; Peds WB Left * * ISB Left Thru * Thru Right * Right Peds * Peds N6 Right ;E6 Right 5B Right :WB Right Green 8.OA 25.0A ;Green 15.OA 24.OP Fellow/AR 4.0 5.0 ;'rellow/AR 4.0 5.0 Cycle Length: 90 secs Phase combination oraer: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Aej Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ---- ------- ----- ----- ---- --- ----- --- Eb L 475 1787 0.316 0.456 9.6 6 40.5 E T 564 1881 1.014 0.300 53.0 E R 480 1599 0.206 0.300 15.2 C WB L 302 1787 0.258 0.456 11.6 B 15.3 C T 564 1881 0.354 0.300 16.1 C R 480 1599 0.336 0.300 16.0 C N6 L 441 1787 0.100 0.522 8.5 B 23.9 C T 543 1681 0.848 0.289 27.9 0 R 462 1599 0.525 0.289 16.4 C SB L 441 1787 0.794 0.522 20.3 C 22.9 C T 543 1881 0.817 0.269 25.6 0 R 462 1599 0.108 0.289 15.2 C Intersection Delay = 27.2 sec/veh Intersection LOS = D Lost Time/Cycle. L = 8.0 sec Critical v/c(x) = 0.910 ----------------------------------------------------------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 07-05-1997 ' Center For Microcomputers In Transportation Streets: (E-W) harmony IN-S) shields /� Analyst: Matt File Name: C- R �T-Q , Area Type: Other 7-5-97 am pm Comment: 1997 1998 plus developments _ --_-- Eastbound ; Westbound Northbound I Southbound L T R L T R L T R ; L T R ---- ---- ----I---- ---- ----I---- ---- ----I---- No. Lanes ; 1 1 1 1 1 1 1 1 1; 1 -1-- -1-- Volumes 80 350 601 150 455 4201 65 425 105! 260 435 105 PHF or PK1510.90 6.90 0.9010.90 0.90 0.90:0.90 0.90 0.9010.90 0.90 0.90 Lane W (ft)112.0 12.0 12.0:1?.0 12.6 12.0;12.0 12.0 12.0;12.0 12.0 12.0 Grade ; 0 0 . 0 ; 0 % Heavy Vehl 1 1 1; 1 1 11 1 1 1I 1 1 1 Parking ;(Y/N) N ;(Y/N) N ;(Y/N) N ;(Y/N) N bus Stops I 01 0: 0: 0 Con. Peds 0; 0; 0; 0 Ped Button :(Y/N) Y 14.5 sI(Y/N) Y 14.5 sI(Y/N) Y 14.5 s:(Y/N) Y 14.5 Arr Type 3 3 3I 3 3 3I 3 3 31 3 3 3 RTOR Vols 1 01 0; 0; 0 Lost Time :1.00 5.00 3.00;1.00 3.00 3.00:1.00 3.00 3.00:1.00 5.00 3.00 Prop. Share; i ii Prop. Prot.; 41! 41I 32I 32 _______________________________________________________________________ Signal Operations Phase Combination 1 2 3 4 I 5 6 7 a EB Left * ' INB Left` Thru - * I Thru Right * Right Peds * I Peds WB Left * * ISB Left Thru * Thru Right * - ; Right Peds * I Peds *- NB Right IE6 Right 55 Right ;WB Right Green 8.OA 24.OA ;Green 15.OA 25.OP Yellow/AR 4.0 5.0 ;Yellow/AR 4.0 5.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ---- ------- ----- ----- ----- --- ----- --- E6 L 302 1767 0.295 0.444 12.0 5 19.3 C T 543 1881 0.716 0.289 21.6 C R 462 1599 0.145 0.269 15.4 C WB L 302 1787 0.553 0.444 13.1 B 41.0 E T 543 1881 0.931 0.269 36.7 D R 462 1599 1.011 0.289 55.8 E NB L 441 1767 0.165 6.533 6.7 B 22.5 C T 564 1881 0.836 0.300 26.4 D R 480 1599 0.244 0.300 15.4 C 58 L 441 1787 0.655 0.533 13.9 6 21.7 C T 564 1881 0.656 0.300 27.8 D R 480 1599 0.244 0.300 15.4 C Intersection Delay = 28.3 sec/veh Intersection LOS = D Lost Time/Cycle. L = 8.0 sec Critical v/c(x) = 0.882 _______________________________________________________________________ HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 07-05-1997 Center For Microcomputers In Transportation Streets: (E-W) harmony (N-S) shields Analyst: Matt I File Name: Area Type: Other 7-5-97® pm Comment: 1997 1998 plus developments ---------------------------------------= Eastbound ; Westbound Northbound I Southbound L T R ; L T .R ; L T R ! L T R '---- ---- ---- - ---- ---- ---- No. Lanes , 1 1 < 1 1 1 i ; 1 1 1 ; 1 1 1 Volumes 135 515 901 70 180 145: 40 415 1351 315 400 45 PHF or PK1510.90 0.90 0.9010.90 0.90 0.9010.90 0.90 0.90: 0.90 0.90 0.90 Lane W (ft)112.0 12.0 :12.0 12.0 12.0;12.0 12.0 12.0;12.0 12.0 12.0 Grade 0 J i 0 0 Heavy Veh; 1 1 1; 1 1 11 1 1 11 1 1 1 Parking ;(Y/N) N ;(Y/N) N ;(Y/N) N ;(Y/N) N Bus Stops ; 0; 0; 0; 0 Con. Peds 0; 01 0; 0 Ped Button ;(Y/N) Y 14.5 s;(Y/N) Y 14.5 s1(Y/N) Y 14.5 s1(Y/N) Y 11.5 Arr Type 3 3 3 3 3; 3 3 3; 3 3 3 RTOR Vols 1 01 0; 01 0 Lost Time 11.00 3.00 3.00:1.00 3.00 3.00:1.00 3.00 3.0011.00 3.00 3.00 Prop. Share; Prop. Prot.; ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 1 5 6 7 6 EB Left * * ;N6 Left Thru * 1 Tnru Right * Right Peds * 1 Paps WB Left * * ;56 Left Thru * { Thru Right * night Peds * Peds NO Right 1E6 Right 55 Right ;W6 Right Green 8.0A 25.OA ;Green 15.OA 24.OP Yellow/AR 4.0 5.0 dlellow/Ak 4.0 5.0 Cycle Length: 90 secs Phase combination order: 01 N2 k5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ---- ------- ----- ----- --- ----- --- EB L 475 1767 0.316 0.456 9.8 6 Tk 552 1839 1.218 0.300 WB L 302 1787 0.258 0.456 11.6 B 15.3 C T 564 1681 0.354 0.300 16.1 C k 480 1599 0.336 0.300 16.0 C NB L 441 1787 0.100 0.522 8.5 6 23.9 C T 543 1881 0.848 0.289 27.9 0 R 462 1599 0.325 0.289 16.4 C SB L 441 1787 0.794 0.522 20.3 C 22.9 C T 543 1661 0.817 0.289 25.6 0 k 462 1599 0.108 0.289 15.2 C Intersection Delay = * (sec/veh) Intersection LOS = (g/C)*(V/c) is greater than one. Calculation of 01 is infeasabie. _______________________________________________________________________ HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 07-05-1997 Center For Microcomputers In Transportation Streets: (E-W) harmony (N-S) shields Analyst: Matt File Name: Area Type: Othe� 7-5-97 am pm Comment: 1997 1996 plus developments _________________________________'______________ Eastbound Westbound ; Northbound Southbound L T R L T R 1 L T k; L T k ----' ---- ---- ---- No. Lanes 1 1 < 1 1 1 1 1 1 1 1 1 i Volumes 80 350 601 150 455 420; 65 425 105: 260 435 105 PHF or PK15:0.90 0.90 0.90; 0.90 0.90 0.90; 0.90 0.90 0.90:0.90 0.90 0.90 Lane W (ft);12.0 12.0 �12.0 12.0 12.0;12.0 12.0 12.0112.0 12.0 12.0 Grade 1 0 1 0 ; 0 0 % Heavy Vehl 1 1 11 1 1 1: 1 1 11 1 1 1 Parking ;(Y/N) N :(Y/N) N I(Y/N) N ;('f/N) N Bus Stops i 0; 01 OI 0 Con. Peds ; 0; 0; 01 0 Fed Button I(Y/N) Y 14.5 s:(Y/N) Y 14.5 s;(Y/N) Y 14.5 s;(Y/N) Y 11.5 Arr Type 3 3 1 3 3 3; 3 3 3; 3 3 3 RTOk Vols i 01 01 01 0 Lost Time 11.00 3.00 3.00:1.00 3.00 3.00:1.00 3.00 3.0011.00 3.00 3.00 Prop. Share) i , Pro-. Prot -I__-________ 41___41_____________3232 _-_______--_ Signal Operations Phase Combination 1 2 5 4; 5 6 7 8 E6 Left * * :NB Left Thru * Thru Right * Right Peds * Peds WB Left * * 158 Left Thru * Thru Right * 1 Right Peds * Peds NO Right iEb Right 56 Right :WB Right Green 6.OA 24.OA ;Green 15.OA 25.OP lallow/AR 4.0 5.0 ;fellow/AR 4.0 5.0 Cycle Length: 90 secs Phase combination order: 01 #2 p5 p6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay ----- LOS --- EB ----- L ---- 302 ------- 1787 ----- 0.295 ----- 0.444 ----- 12.0 --- B 26.0 D Tk 532 1640 0.656 6.289 26.6 0 WB L 302 1787 0.553 0.444 13.6 B 41.1 E T 543 1881 0.931 0.269 36.7 D R 462 1599 1.011 0.289 55.8 E N6 L 441 1767 0.165 0.533 6.7 6 22.5 C T 564 1881 0.836 0.300 26.4 D k 460 1599 0.244 0.500 15.4 C SB L 441 1787 0.655 0.533 13.9 8 21.7 C T 564 1681 0.856 0.300 27.8 D R 460 1599 0.244 0.300 15.4 C Intersection Delay = 29.4 sec/veh Intersection LOS = 0 Lost _______________________________________________________________________ Time/Cycle. L = 8.0 sec Critical v/c(x) = 0.882 APPENDIX B HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 07-05-1997 Center For Microcomputers In Transportation Streets: (E-W) harmony (N-5) shields Analyst: Matt File Name - Area Type: ther 7-5-97 am pm Comment: 1997 1998 plus developments ----------'---- Eastbound Westbound ' Northbound Southbound L T R 1 L T R 1 L T R 1 L T k :---- ---- ----:---- --------:---- - ----f---- ---- ---- No. Lanes ; 1 1 < 1 1 1 1 1 1 1 1 : 1 1 1 Volumes 1 85 455 73: 66 154 137: 30 399 128: 305 385 10 PHF or PK1510.90 0.90 0.90:0.90 0.90 0.90:0.90 0.90 0.90:0.90 0.90 0.90 Lane W (ft)112.0 12.0 112.0 12.0 12.0112.0 12.0 12.0112.0 12.0 12.0 Grade 0 ; 0 0 0 % Heavy Veh; 1 1 i; 1 1 1: 1 1 11 1 1 1 Parking :(Y/N) N :(Y/N) N :(Y/N) N i(Y/N) N Bus Stops 0: 0: 01 0 Con. Peds ; 0: 0: O: 0 Pod Button 1(Y/N) Y 14.5 s:(Y/N) Y 14.5 s:(Y/N) Y 14.5 s:(Y/N) Y 11.5 Arr Type 1 3 3 : 3 3 3: 3 3 3: 3 3 3 RTOR Vols 0; 0; 01 0 Lost Time i1.00 3.00 3.0011.00 3.00 3.0011.00 3.00 3.00:1.00 3.00 3.00 Prop. Share; Prop. Prot.; : --------------------------- Signal Operations Phase Combination 1 2 3 4: 5 6 7 8 EB Left * * :N6 Left Thru * ; Thru Right * Right Pads ; Peds WB Left * * :SB Left Thru * : Thru Right * ; Riaht Peds * : Peds NB Right :E6 Right 58 Right :WB Right Green 6.0A 25.OA :Green 15.OA 24.OP Yellow/AR 4.0 5.0 :Yellow/AR 4.0 5.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c 9/C Approach: Mvmts Cap Flow Ratio Ratio Delay L05 Delay LOS ----- ---- ------ ----- ----- ----- --- ----- --- E6 L 507 1787 0.165 0.456 9.3 B 60.6 F TR 553 1842 1.062 0.300 66.8 F WB L 302 1787 0.242 0.456 11.6 5 15.0 B T 564 1881 0.303 0.300 15.6 C R 480 1599 0.317 0.300 15.9 C NB L 441 1787 0.075 0.522 8.3 B 22.6 C T 543 1881 0.815 0.289 25.7 D R 462 1599 0.307 0.289 16.3 C SB L 441 1767 0.769 0.522 16.7 C 21.7 C T 543 1881 0.788 0.289 24.3 C R 462 1599 0.024 0.289 14.8 5 Intersection Delay = 31.6 sec/veh Intersection LOS = D Lost Time/Cycle, L = 8.0 sec Critical v/c(x) = 0.674 _______________________________________________________________________ HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 07-05-1997 Center For Microcomputers In Transportation Streets: (E-W) harmony (N-S) shields Analyst: Matt File Name: Area Type: her 7-5-97 am pm Comment: 1997 1998 plus developments Eastbound ; Westbound ; Northbound SOLIthbound L T R : L T R ; L T R : L T R --------:---- -=-- ----:---- --------1---- ---- ---- No. Lanes 1 1 1 < ; 1 1 1 1 1 1 1 ; 1 1 1 Volumes : 48 309, 48: 142 393 403: 46 409 991 249 421 53 PHF or PK15:0.90 0.90 0.90:0.90 0.90 0.9010.90 0.90 0.90:0.90 0.90 0.90 Lane W (ft):12.0 12.0 :12.0 12.0 12.0:12.0 12.0 12.0:12.0 12.0 12.0 Grade 1 0 0 0 i 0 % Heavy Veh; 1 1 11 1 1 1: 1 1 1: 1 1 1 Parking 1(Y/N) N :(Y/N) N :(Y/N) N :(Y/N) N Bus Stops I 0: 0: 01 0 Con. Peds O: O: O: 0 Ped Button 1(Y/N) Y 14.5 s:(Y/N) Y 14.5 s:(Y/N) Y 14.5 s:(Y/N) Y 11.5 Arr Type 1 3 3 3 3 3: 3 3 3: 3 3 3 RTOR Vols ; O: 01 01 0 Lost Time 11.00 3.00 3.00:1.00 3.00 3.00:1.00 3.00 3.0011.00 3.00 3.00 Prop. Share: : I Prop. Prot.: 411 41: 321 32 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4: 5 6 7 8 EB Left * * :NB Left Thru : Thru Right * 1 Right Peds * ; Peds * :55 Left W6 Left Thru * Thru Right * Right Peds * ; Peds NB Right ;EB Right SB Right :W6 Right Green 6.OA 24.OA Green 15.OA 25.OP Yellow/AR 4.0 5.0 1Yellow/AR 4.0 5.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 Intersection Performance Summary Lane Group: Adj Sat vic 9/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS _____ ____ _______ _____ _____ _____ ___ _____ ___ E5 L 302 1767 0.175 0.444 10.9 6 21.2 C TR 532 1645 0.744 0.289 22.6 C W5 L 302 1787 0.523 0.444 12.7 6 32.1 0 T 543 1881 0.804 0.269 25.i D R 462 1599 0.970 0.289 45.7 E NB L 441 1787 0.116 0.533 8.4 6 21.6 C T 564 1681 0.605 0.300 24.5 C R 480 1599 0.229 0.300 15.3 C SB L 441 1787 0.626 0.533 12.9 B 20.6 C T 564 1881 0.829 0.300 26.0 0 k 480 1599 0.125 0.300 14.6 6 Intersection Delay = 25.0 sec/veh Intersection LOS = C Lost Time/Cycle, L = 8.0 sec Critical v/c(x) = 0.848 ------------------------------------- APPENDIX A Table 1 1997 Peak Hour Operation Intersection Harmony/Shields (signal) EB WB NB SB Overall Table 2 Level of Service AM PM F C B D C C C C D C Short Range Peak Hour Operation Intersection 1. Harmony/Shields (signal) (Existing geometry and signal phasing) EB WB NB SB Overall 2. Harmony/Shields (signal) (Add EB RT lane/existing signal phasing) EB WB NB SB Overall 3. Harmony/Shields (signal) (Add EB RT lane/change signal phasing) EB WB NB SB Overall Level of Service AM PM * D C E C C C C * D E C C E C C C C D D C C B C C C D C C C * Calculation of level of service not feasible. ,cr) r,) -0- C V � O Jrn also 137/403 154/393 66/142 HARMONY 85/48 ) } r 455/309 — to o m 73/48 --� o 00 M ^ AM / PM C J W_ 1997 PEAK HOUR TRAFFIC Figure 1 N /`— HARMONY 7, Legend: - Lane W_ 2 N EXISTING GEOMETRY Figure 2 �t �� N � o� --1451/420 180/455 'or— 70/150 HARMONY 135/80 —)' ) } I 515/350 � Ln Lo o 90/60 o �LO N AM / PM [� Rounded to the Nearest -� 5 Vehicles. W_ N SHORT RANGE PEAK HOUR TOTAL TRAFFIC Figure 3 right -turn movement operates at level of service E. This operation is shown on line 1 of Table 2. Provision of an eastbound right -turn lane will achieve acceptable intersection operation overall, but some movements will continue to operate at level of service E. This is shown on line 2 of Table 2. Provision of the eastbound right -turn lane and adjustments in the signal phasing will achieve acceptable operation on all movements during the peak hours. This is shown on line 3 of Table 2. It is concluded that the current operation at the Harmony/Shields intersection is a short duration concern that can be remedied by providing an eastbound right -turn lane on Harmony Road. This geometric improvement and adjustments in the signal phasing will achieve acceptable operation during the peak hours in the short range future. These improvements will achieve acceptable operation with the increased traffic from both Harmony Ridge and the Overlook at Arapahoe Farms. co co LO o co cr) 0 o rn cn Q � 0 0 o C) 0 LL z a J w 0 J T w O > N cc 0) 0 W z C9 > 0 a � w W J 0 C7 a N Q_ N N W o: Z rX w W _z Vo z J w W o O o a y a F- W as CJ LL LL a Q F- TO: Joe Vansant Eric Bracke, Fort Collins FROM: Matt Delich DATE: July 8, 1997 MEMORANDUM Fort Collins Traffic Engineer Planning Department SUBJECT: Harmony Ridge traffic study update (File: 9585MEM1) This memorandum provides an update to the "Harmony Ridge Site Access Study," September 1995. When Harmony Ridge was approved by the Fort Collins Planning and Zoning Board, an issue was raised regarding the operation of the Harmony/ Shields intersection. Analysis of this intersection was not requested as part of the scope of the site access study. However, it was agreed that when Harmony Ridge came back for further approvals, this intersection would be analyzed. L.Per City staff direction, this memorandum only covers the operation of this interse�n. Tn a-dTition o ony edge development, the Over oo at Arapahoe Farms generated n this analysis. Figure 1 shows recent peak hour counts at the Harmony/ Shields intersection. Figure 2 shows a schematic of the approach geometry at this signalized intersection. Table 1 shows the peak hour operation at this intersection using the peak hour volumes shown in Figure 1.. Calculation forms are provided in Appendix A. For analysis purposes, a 90 second cycle was assumed with left -turn phases on all legs. Acceptable operation can be achieved overall, however, as noted on the calculation forms, selected movements operate at levels of service E and F. This is caused primarily by deficient geometry on the west leg. Observation indicates that it is a 1120 minute" problem that occurs during the morning peak hour. This can be remedied by adding an eastbound right -turn lane and adjusting the signal phasing to account for this peaking condition within the peak hour. Figure 3 shows the short range (1998+) peak hour traffic at the Harmony/Shields intersection. As stated earlier, this traffic includes traffic from Harmony Ridge and the Overlook at Arapahoe Farms, as well as, a factored increase in background traffic (3.5%/year). Table 2 shows the peak hour operation at this intersection using the volumes shown in Figure 3. Calculation forms are provided in Appendix B. Using the existing geometry and phasing in the Table 1 analysis, the morning peak hour operation is unacceptable and the afternoon peak hour analysis indicates that the westbound