Loading...
HomeMy WebLinkAboutHARMONY RIDGE PUD, PHASE ONE - PRELIMINARY - 49-95A - CORRESPONDENCE - STREET RELATED DOCUMENTTHE PUBLIC SIDEWALKS. THE REPAIR AND MAINTENANCE OF THE DRIVEWAYS AND PARKING BAYS WILL BE THE RESPONSIBILITY OF THE HOMEOWNERS ASSOCIATION. THE CITY WILL NOT MAINTAIN THEM JUST AS WE DO NOT MAINTAIN ANY PRIVATE PARKING OR DRIVEWAYS. •5 oK PLEASE ADD 3 OR 4 OFF-STREET PARKING STALLS AT THE END OF THE CUL-DE-SAC IN THE TOWNHOME AREA TO PROVIDE PUBLIC PARKING NEAR THE NATURAL AREA AND TO KEEP PARKED VEHICLES FROM OBSTRUCTING THE CUL-DE-SAC. •i� AT FINAL, FURTHER DISCUSSION WILL BE NEEDED REGARDING THE DESIGN OF ANY -LANDSCAPED ISLANDS PROPOSED IN THE STREETS. TYPICALLY, FULL -DEPTH ASPHALT IS REQUIRED IN THE STREET AROUND THE ISLAND AND A DRIP IRRIGATION IS REQUIRED FOR ANY LANDSCAPING IN THE ISLAND. IT SHOULD ALSO BE NOTED THAT ADDITIONAL MANHOLES ARE TYPICALLY REQUIRED SINCE THE WASTEWATER UTILITIES DO NOT WANT THEIR FACILITIES UNDER THE ISLANDS. THIS CAN CAUSE DIFFICULTY IN ACHIEVING PROPER COMPACTION FOR STREET CONSTRUCTION SINCE IT IS DIFFICULT TO GET EQUIPMENT IN BETWEEN THE MANHOLES AND THE CURB AND GUTTER FOR THE ISLAND AND CUL-DE-SAC. 07 THE RIGHTS -OF -WAY AND/STREET WIDTHS AS SHOWN ARE O.K. AS LONG AS THE CURB, GUTTER, AND SIDEWALK, AND PRIVATE OFF-STREET PARKING BAYS ARE PROVIDED AND CONSTRUCTED AS DESCRIBED IN THE COMMENTS ABOVE.] THIS CONCLUDES THE COMMENTS BASED ON THE PLANS AND LEVEL OF DESIGN DETAIL SUBMITTED TO DATE FOR THE PRELIMINARY P.U.D. PLEASE CALL ME AT 221 -6750 WITH ANY QUESTIONS. SINCERELY, KERRkHB ECK CIVIL ENGINEER CC: FILE DICK RUTHERFORD, STEWART AND ASSOCIATES" STEVE OLT, CITY PLANNER City of Fort Collins DECEMBER 22, Transpc .lion Services J5C_ 22, ` qS Engineering Department 1995 POSITIVE ENVIRONMENTS, INC. JOE VANSANT P.O. Box 98 FORT COLLINS, CO 80522 DEAR JOE: THE FOLLOWING ARE THE COMMENTS FROM THE ENGINEERING AND TRANSPORTATION DEPARTMENTS ON THE HARMONY RIDGE P.U.D. PRELIMINARY PLANS SUBMITTED ON DECEMBER 5., 1 995. PLAN REVISIONS AND A WRITTEN RESPONSE TO THESE COMMENTS ARE DUE ON OR BEFORE JANUARY 3, 1 996 IN ORDER FOR CITY STAFF TO CONTINUE EVALUATING THE PROJECT FOR THE JANUARY PLANNING AND ZONING BOARD HEARING. BASED ON YOUR RESPONSE TO THESE COMMENTS, STAFF WILL MAKE A DETERMINATION AT THE FINAL REVIEW MEETING ON JANUARY 5 AS TO WHETHER THE PROJECT IS READY TO PROCEED TO THE BOARD WITH A STAFF RECOMMENDATION AND ANY CONDITIONS IF THE PROJECT IS RECOMMENDED FOR APPROVAL. HARMONY RIDGE P.U.D. - PRELIMINARY • 1 THE PROPOSED REALIGNMENT OF �HARMONY.ROAD .LOOKS O.K. . FOR PRELIMINARY: PLEASE ADD PROPOSED STRIPING INFORMATION TO THE PLAN TO INDICATE THE TURN LANE CONFIGURATION AND ANY MEDIANS IN HARMONY ROAD. THE SITE PLAN, LANDSCAPE PLAN, AND UTILITY PLANS SHOULD BE REVISED TO MATCH THE PROPOSED ALIGNMENT. •2 THERE IS STILL A QUESTION ABOUT WHAT IS GOING TO HAPPEN TO THE►TRIANGULAR cPARCEL•ADJACENT TO THE SITE ON THE NORTH AND BOUNDED BY HARMONY ROAD. WILL IT BE ACQUIRED BY THE DEVELOPER AND INCORPORATED INTO THE PROJECT ? WILL IT BE LANDSCAPED AND MAINTAINED BY THIS DEVELOPMENT ? THAT PROPERTY HAS AN OBLIGATION FOR THE LOCAL STREET PORTION OF THE HARMONY ROAD IMPROVEMENTS ADJACENT TO IT. PLEASE INCLUDE A WRITTEN RESPONSE ALONG WITH YOUR PLAN REVISIONS BY 1 /3/96. *SIDEWALKS MUST BE PROVIDED ON�BOTH SIDES OF ALL PUBLIC STREETSR PLEASE ADD A SIDEWALK TO THE SOUTH SIDE OF THE EAST/WEST STREET. •4 ALLOPUBLIC STREETSIMUST HAVE ROLLOVER CURB, GUTTER, AND SIDEWALK CONSTRUCTED ON BOTH SIDES OF THE STREET, OR STANDARD VERTICAL CURB AND GUTTER WITH A 4 FOOT WIDE ATTACHED SIDEWALK. THE PROPOSED DRIVEWAYS AND OFF-STREET PARKING BAYS CAN THEN BE CONSTRUCTED AS DRIVEWAYS WOULD BE IN A STANDARD DEVELOPMENT. THE OFF-STREET PARKING BAYS MUST BE CONSTRUCTED A MINIMUM OF 20 FEET IN DEPTH FROM THE BACK OF THE SIDEWALK SO THAT VEHICLES WILL NOT OBSTRUCT OR OVERHANG 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605