HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 5TH FILING, HEALTHY LIVING CENTER - PDP - 32-98I - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVES• There are no wetlands or natural areas on the site.
(viii) Neighborhood meeting
• A neighborhood meeting is not required for this project
(ix) Project name and previous project names.
The project name is PVHS Healthy Living Center. There have been previous projects and there
will continue to be PVHS harmony campus projects in the future with slightly different names.
Statement of Planning Objectives Page 2 of 2
Statement of Planning Objectives
PVHS Healthy Living Center
(i) Statement of appropriate City Plan Principals and Policies
The proposed Healthy Living Center is consistent with the City's Comprehensive Plan as per the
following
• The Healthy Living Center is being developed as part of the master planned PVHS
Harmony Medical Campus. The project will comply with the harmony corridor plan and
by the guidelines created for the medical campus. Bicycle and pedestrian access as well
as connectivity to the existing campus to the west will be very important in the design of the
medical office. There are no natural areas or hazardous materials on site.
(ii) Open Space, Buffering, Landscaping, Circulation, Transition Areas, Wetlands and Natural Areas
Open Space:
• Two central pedestrian islands will be created in front of the entries. Open space will also be
provided to the south of the building.
Buffering:
• The site is a substantial distance to adjacent residential, however some landscaping will be
installed to screen the parking area from the north.
Landscaping_
• Appropriate landscaping will be installed in the parking area, around the building, and at the
entrances.
Circulation:
• Site will be accessed by the extension of existing parking and access will be provided off of the
private drive to the north.
Wetlands and Natural Areas:
• There are no wetlands or natural areas on site.
(iii) Proposed ownership and maintenance of public and private open space areas.
• A master association for the entire campus will maintain the site.
(iv) Estimate of Number of Employees for Commercial and Industrial Uses
FX0
(v) Description of rationale behind assumptions and choices made by the applicant
• This project will comply with all applicable city standards and the PVHS Harmony Campus
Guidelines in an effort to create a satisfactory addition to the campus
(vi) Variances
• There are no variances being requested at this time.
(vii) How Conflicts Between Land Uses are Being Avoided
Statement of Planning Objectives Page 1 of 2