HomeMy WebLinkAboutBMC WEST PUD - PRELIMINARY ..... CONTINUED P & Z BOARD HEARING - 1-96 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSTABLE 2 TRIP GENERATION RATES OF EXISTING PRE -HUNG DOOR FACILITY AM PEAK HOUR PM PEAK HOUR In Out Total In Out Total 67% 33% .41 trips/ksf 30% 70% .45 trips/ksf TABLE 3 ESTIMATED TRIP GENERATION OF PROPOSED BMC WEST EXPANSION ADT AM PEAK HOUR TRIPS PM PEAK HOUR TRIPS In Out Total In Out Total 180 11 5 16 1 5 13 1 18 TABLE 1 TRIP GENERATION SURVEY OF EXISTING PRE -HUNG DOOR FACILITY Time Inbound Outbound Total 7:00-7:15 AM 2 0 2 7:15-7:30 AM 2 0 2 7:30-7:45 AM 1 0 1 7:45-8:00 AM 1 1 2 8:00-8:15 AM 2 2 4 8:15-8:30 AM 0 0 0 8:30-8:45 AM 1 1 1 8:15-8:30 AM 0 1 1 PEAK HOUR TOTAL AM 6 3 9 4:00-4:15 PM 1 2 3 4:15-4:30 PM 1 2 3 4:30-4:45 PM 0 2 2 4:45-5:00 PM 1 1 2 5:00-5:15 PM 0 1 1 5:15-5:30 PM 0 0 0 5:30-5:45 PM 0 1 1 5:45-6:00 PM 0 0 0 PEAK HOUR TOTAL PM 3 7 10 Eric Bracke January 23, 1996 Page 2 Trip Generation Typically, the trip generation of a project is determined by using the 5th Edition Trip Generation, manual prepared by the Institute of Transportation Engineers. However, very limited data was available from this source for a use such as the proposed project. Therefore, a trip generation survey was performed at the existing facility off of Harmony Road to determine the morning and evening peak hour trip generation. The trip generation surveys were performed on 12/13/95 from 7:00 AM to 9:00 AM and 4:00 PM to 6:00 PM. These peak hours were selected because they typically represent the peak hours of traffic on the adjacent roadways. The results of the trip generation surveys are provided in Table 1. The survey results were analyzed to determine the trip generation rate, number of trips per square foot. The analysis results are shown in Table 2. The estimated trip generation for the proposed BMC West pre -hung door facility is provided in Table 3. The trip generation was determined based upon the trip generation rates shown in Table 2. The average daily traffic was estimated assuming that the evening peak hour represents 10 percent of the daily trips. As indicated in Table 3, the proposed project is expected to generate approximately 180 daily trips, 16 morning peak hour, and 18 evening peak hour trips. It should be noted that the trip generation estimates provided in Table 3 represent a conservative estimate because currently some of the delivery trucks which service the existing pre -hung door facility first stop at the BMC West commercial building. With the proposed project these trucks would no longer be an additional trip. Conclusions A traffic analysis was performed to determine the potential traffic impacts of the proposed expansion of BMC West in Fort Collins, Colorado. A special trip generation survey was performed at the existing pre -hung door facility to determine the trips to be generated by the proposed project. Using the results of this survey, it was determined that the proposed project would generate approximately 180 daily trips,16 morning peak hour, and 18 evening peak hour trips. Due to the very low trip generation of the proposed project, it was concluded that an intersection level of service analysis was not necessary. The potential traffic impacts of the proposed expansion project will be insignificant. Please feel free to call me at (970) 416-0410 if you have any questions. TcerL0 Ruth Clear, P.E. Transportation Engineer RUTH CLEAR, PE Traffic/Transportation Engineering January 23, 1996 Mr. Eric Bracke City Traffic Engineer City of Fort Collins 625 9th Street Fort Collins, Colorado 80524 RE:. Proposed Expansion of BMC West Traffic Study REF:9561 Dear Mr. Bracke: The following letter documents the findings of a traffic analysis for the proposed expansion of BMC West on Prospect Road in Fort Collins, Colorado. The purpose of the traffic analysis was to determine the potential traffic impacts and access needs of the proposed project. The following areas will be addressed: - Existing Conditions - Project Description Trip Generation - Conclusions Existing Conditions The proposed expansion of the BMC West would be located to the north of the existing BMC West commercial building and warehouses. The existing BMC West is located at the northeast comer of Prospect Road and Timberline Road. The new facility would assemble pre -hung doors. This activity currently occurs at a building located at 1863 Harmony Road. The existing facility is approximately 22,000 square feet. The primary roadways which would serve the project site are Timberline Road and Prospect Road. Timberline Road currently terminates just to the north of Prospect Road. There have been plans on extending Timberline Road north to Mulberry Street. Currently a study is under way to determine the feasibility of this extension. The intersection of Prospect Road and Timberline Road is currently signalized. The existing BMC West commercial building has a driveway to Prospect Road. Prospect Road is a four - lane arterial street. Project Description The proposed BMC pre -hung door facility would be approximately 39,300 square feet. The proposed project would have a full -movement access drive onto Timberline Road, approximately 435 feet north of Prospect Road. 430 East Elizabeth Street Fort Collins, Colorado 80524 Telephone: 970.416.0410 Fax: 970.416.0410 .. RIPLEY ASSOCIATES Planning Objectives - BMC West P.U.D. lanwasy 22, 1996 Page 2 ■ Development of parking area for approximately 30 employees. ■ Development of attractive buildings that are architecturally compatible with each other. ■ Development of a well landscaped street frontage that presents a positive image to the community. ■ Development of a landscape buffer between the manufacturing facility and the Spring Creek bike trail. City land use policies that support the proposed development include: 22. Preferential consideration shall be given to urban development proposals which are contiguous to existing development within the city limits or consistent with the phasing plan for the City's urban growth area 60. Industrial uses should locate near transportation facilities that offer the required access to the industry without creating demands that exceed the capacity of the existing transportation network. 61. Industrial development should locate where the proper sizing of facilities such as water, sewer and transportation has occurred or is planned. Thank you for your consideration, and we look forward to working with you during the development review process. Sincerely, RIPLEY ASSOCIATES 0�l Linda Ripley Principal 4 January 22, 1996 -is Planning and Zoning Board Members RIPLEY ASSOCIATES C/O Mike Ludwig Planning Department Landscape Architecture 281 North College Avenue Urban Design Fort Collins, CO 80524 Planning 223 Jefferson Street Suite A Fort Collins, Colorado 80524 IZE: Planning Objectives for: PHONE (970) 224-5828 FAX (970)224.2956 BMC West P.U.D. Preliminary/Final P.U.D. BMC West, Inc. is a building supply company with 52 retail building material centers in 11 western states including one located east of Timberline Road and north of Prospect Road in Fort Collins. The company also operates 25 pre -hung door manufacturing facilities. The local BMC West currently leases space at another location for the door manufacturing part of the business. BMC West P.U.D. is a proposal for a 43,756 square foot building to house a manufacturing and assembly shop for pre -hung doors. The facility is intended as a manufacturing business and not a retail store. The proposed site is located just north of their existing building material center. BMC West currently employs 47 people at their existing center on Prospect Road and 17 people are employed at their existing door manufacturing operation. In addition, the applicant is seeking approval for changes to the architecture of the existing buildings on Prospect Road which were part of Prospect -Timberline P.U.D. The architectural, changes are intended to update the existing buildings, improve the visual appearance and create architectural compatibility between the existing buildings and the new manufacturing facility. The site slopes from the west to east at less than one percent. Existing vegetation on the site consists of Russian Olive trees and other small trees and shrubs. Surrounding land uses include undeveloped property to the north, Spring Creek and Seven Lakes Business Park to the east, Bath Landscape Nursery to the west and undeveloped property to the south across Prospect Road. The proposed project scores 56% on Point Chart F - Industrial Uses, gaining points for being adjacent to an arterial street and for utilizing energy conservation measures beyond those normally required. Planning objectives for the property include: ■ Development of approximately 45,000 square feet of warehouse space. ■ Development of truck loading docks accessible to semi -trailer trucks. oil t 013 v I T.'q7--T77-Ai P e.' !tT CICC T IC T �Tn !. ' u:ENER ^ITY ►Y •Cif: OF FORT. COLLIP ET This worksheet must be completed and submitted at the time of application for all non-residential Preliminary PUD'srequesting energy conservation points on the applicable Land Use Activity Point Chart. Please choose one of the two methods below. lie realistic in determining your commitment for energy conservation mea- sures. Failure to fulfill a commitment made for energy conservation measures may result in disqualification of a project under the applicable criteria of the LDOS. NAME, OF PUD: M6" VtJ Submittal.Date:`1� METWID ONE: I propose a percent reduction in the annual energy consumption for the structures) in this proposed PUD. This reduction receives point(s) for energy conservation. NOT.EFOR TNOSIr PROJECTS USING METHOD ONE. Certification by a professional engineer, licensed in Colorado, and a summation of the engineer's calculation methods and results will be requlrtd lic document energy conservation measures at the time of building permit application. METHOD TWO: I propose the following energy conservation measures for the structure(s) in this proposed PUD: Moasure 16. rat(( L- t L / ft Points 00 Z ad 0 ,x 14, 1/z` �'' ` y °ti` o ers �'` Total Points received from Method 2: �' 6 Preparer's Name: A�E ae ) INDUSTRIAL USES POINT CHART F For All Criteria FCriterion Applicable Criteria Only Is the Criterion Applicable Yes No I n ul IV Circle the Correct Score Multiplier Points Earned Ixll Maximum Applicable Points a. "North" Fort Collins X X 2 0 1 O 2 b. Industrial Center X X 20 0 3 6 c. On Arterial Street �( X 0 0 1 ',Z 2 d. Energy Conservation X 1121300 2 g e. Historic Preservation X 1 2 0 2 f 1 2 0 9 1 1 2 0 h. 1 2 0 i. 1 2 0 j. 1 2 0 k. 1 2 0 0 Totals v vi Percentage Earned of Maximum Applicable Points V/VI = VII gGj vu Land Development Guidance System for Planned Unit Developments The City of Fort Collins, Colorado, Revised March 1994 -76- ... ndustrial Uses (continued) 1. Prevent creation of influences adverse to its preservation; 2. Assure that new structures and uses will be in keeping with the character of the building or place. Imitation of period styles should be avoided; and 3. Propose adaptive use of the building or place that will lead to its continuance, conservation, and improvement in an appropriate manner while respecting the integrity of the neighborhood. Land Development Guidance System for Planned Unit Developments The City of Fort Collins, Colorado, Revised March 1994 -75- BMC WEST Pt V XX P% , I* 1--olio ACTIVITY: Industrial Uses F1 DEFINITION: All industrial and manufacturing uses, and other uses which are of the same general character. CRITERIA: Each of the following applicable criteria must be answered "yes" and implemented within the development plan. Ye/ No N/A 1. Does the project gain its primary vehicular access from a street other than ] South College Avenue? 2. Have all necessary precautions been taken to prevent lubricants and fuel ] ] oil substances, which are stored on the Site, from leaking or draining into the groundwater system, streams, creeks, or other water bodies? 3. Are all repair, painting, and body work activities, including the storage of ] refuse and vehicular parts, planned to take place within an enclosed structure? 3. DOES THE PROJECT EARN AT LEAST FIFTY (50%) PERCENT OF U/❑ ] THE MAXIMUM POINTS AS CALCULATED ON POINT CHART "F" FOR THE FOLLOWING CRITERIA? a. Is the project located within "north" Fort Collins? b. Is the project contiguous to or functionally a part of an existing or planned office or industrial park, or in the case of a single user, employ a total of more than one hundred (100) full-time employees during a single eight (8) hour shift? c. Is the activity located adjacent to an arterial street? (Not applicable for uses with fewer than twenty-five (25) employees or less than fifty thousand (50,000) square feet GLA.) d. Does the activity reduce non-renewable energy usage through the application of alternative energy systems or through energy conservation measures beyond those normally required by the Model Energy Code as adopted by the City? Refer to Appendix "E" for energy conservation methods to use for calculating energy conservation points. e. If the site contains a building or place in which a historic event occurred, has special public value because of notable architecture, or is of cultural significance, does the project fulfill the following criteria? Land Development Guidance System for Planned Unit Developments The City of Fort Collins, Colorado, Revised March 1994 -74- n Activity A: ALL DEVELOPMENT CRITERIA ALL CRITERIA C R I T cR1ON A•1• COMtitUNIlY_WIDE CRITERIA. 1.1 Solar Qnertation 1.2 Ccmorehensive Plan 1•� Wildlife Habitat 1.= fvlineral Deocsit 1 •� =caecic. lly Ser,siirve Areas 1.c Lands cr Agricultural Imocrares `nercv Ccr,selvarien 1.5 Air Quality 1 c Vja?er Qualiry '0 �=.vace arc V</=s;as _ 1 11 1N°t�r�OnSeN�ilOn I APPLICABLE CRIT c'=1;, ONLY :`.e c.-znon Will the c,Zm Crj aco11nGe7 I be satisrlw I . : I Yes INo I If no, please ex -lain I IV e.-ved 1 12 residential Densitv NE!GHEGRHOGD C0rr1P.;!,T1ElLI7Y CR17E Peces:ran. Bike Transccraticn 2 2 Euiicinc P!acerrent and Orient_ticr, J ? 3 natural r�aruras 2 = V_nic lar Circuiaiicn anc P_ ?5 _ _...cfyarC, r,CC=cS _ -•' �ecestrian GifC;lcllCn 2. - .-.rc`itec:ura 2 = Builcino Fie!cnt and Views 1S Shading 2. I G ,-.clar Acc=sS 2.11 His;onc Rescurcas 2.12 Se="acks 2.13 Landscaee 2.1. Signs 2.15 Site Lighting 2.1 5 Nci;e and Vibration 2.17 Glare or Heat 2.1 1 Hazardous Materials 3. ENGINEERING CRITERIA 3.1 Utility Capacity 3.2 Design Standards 3.3 Water Hazards 3.4 Geologic Hazards land Development Guidance System for Planned Unit Develop ments The City of Fort Collins, Colorado. Revised . h I994 -61 - 1-10-5US� r r Fa.w-� i a4 BMC WEST PUD EARCHIIELTURAL ELEVATIONS REMSIONS; LEFT isim DA.AM 1/2� MA� eT—1 0 F boc weSI- Dcl* L jjn�U� Rao. RXi (g1 , COL=f� W. I F RLC-K. - MON GRCWP re Ell opmEms �mkllmlmlRml1m1 Wlml m[Mm —METAL=gj�1�t�{t.�_Gs{.ae ��sTwlE-(WN RE Owlia i�:rf eel-.=QAIT_iila—MlEEiT� �+ l WNT CAWA w wrre *440 vAcr• GLL 494'1 ; IVI amgWi, mwN44r ftAx '*S,a WEST PUD__ ■ARCHITECTURAL ELEVATIONS m' p,�1 mil REMNONS- - �o L r0 :l•o ICED• iMee. Y1+r, F : CKJ GRL GAGFIE L POUDRE INDUSTRIAL PARK P U.D men+I TSCC i0 --Is,fee urn 55: e[ S Ov[0 i 1-Ar sov 1-csc I \ - -- -:. 'ORALC EIALDINI (OPEN TO T11C 5 UTftJ �s /(I /'ll 0 FIG A 5N O AC; \ -- — , 'c- FU GTURIN G't e.,�., / — :d1 \ J -- -- 'A a uaI 1D-" d-J5A m e-MSc 43.75G 5Q. FT. w —pol - zi - m is-Js. '• JI . a-rk]i c-Fa i i EDGE Ora j %� W r, 1-05r N .L s.e 1-LSLass Li m FA OPEN STORAGE F BUILDING MATERIA 5 _ x R �.I 2-1 iT \. CM4L ^eu �"'.e�sao'm �N••'s _-•• - �/" / V Ilu r��w GLUE ION AREA RUS5LLNTO be lIer."D OLrvCS / mil/ a n..oe [CC be 11 SEVEN LAKES 5USINES5 PARK P.U.D. W -- ---------- PLANT LI5T 50ENTFIL \AR COMMON \AMC See QUANTITY 0 ObLd s Treew Ar Aaer rreemon, tree n" "Ned 2 cm 2 AT Amua c .one Alder t' tromp G r< opumaeecur,l Lancdeer Lotcon.00d 2' cell 11 Ornament., T s LR Lretoll arogue Suw�m nv.tnorn 2-1/2". 2 M[ `1vNs Reaien:' Rloal L'Ohbd le 1-1/2"cd 3 LOmrarous Trees IN rhos apre Au.tno,, rue 6' 12 L54 Go", se a Gdoradc— Ldoredo Tana., Dog.00c 5 g.L T 05r Up— Mn'... bvramea Teb.t., Dog. od 5 Sell - 2 AGL J-..... h tont.lis Cite Cho e 04 Qmp Spread Juan per 22 J5A Junlperua b v 'Arcad'.e' Intel Juniper el 10 JT Juniper .ebne tar—abnona Tom Jumper 5 pal. 3$ RA ends all Adm. Larrant s gel. so - auee Coln• nSD ne5.e oceg. 'Stele D"Oro Lob DeylRas 1 gal. 16 PROPOSED NATIVE SEED MIXES FLOOD CONTROL MIX IRRIGATION DRYLAND l IOz SAND 5LLCSTCM WE S.TL ARASs 1Oz CAN51 INJU a 20z SLENDER wIEATass wz ooz el LO GRA55 else cRAnA 307 Wr5TERN WMEAi PLANTING NOTE5 LEGEND B� 1. Al pleat poll sand meet spnwrwatlms Of the Ame—al A sesba m R RAID D or n✓+e. sem teApa rw Nnber ore Qeee. At to a shed be b ens hwbppve ar eO.-idn'. M. MANppr FARKNG STALL z. neea an1. s.be than m. Feet co ear An a �T PUD IF.— an and m ca.ar then 10 Fast to vnr later r w Ins. drubs snot a, hentee feet Shrubs T TRAsn tnetosLRC pleated a tloxr It, a teat is eny .vier o.Locate Ire. Tree plmbq be .—al ertn Serene telromy. Loaecros of of utetea g ME rael(Nt he.e. In o pre, nw¢onttl dataee or e0' ee vtr et n the rcb XIw tD p.lshin bet eel and *treat tarth a mesterab a npermR tRCCs CTO ■PRELIMINARY !FINAL LANDSCAPE PLAN 3. ec t Oc O must be Wtenee from the Oty rweater before tree+ we O KE CTO RCMANJ plmtee on Gty ngat-of-eey. pi a. At Inn ernes Snell I. w vn tic underp pone rngeClrn , A, me o, to ayatem. An rrpvtian plan .e be requ.ee prat to I+wence a buiEmg pelot be e . s. Lvbuanp .Mel be mstatee or salad ertn a latter or cremt. esc o. w bond tar lzsz or to .d. or the Iab.oapmg wwr m i,< and f"v12 f the'cy. 1t15rNt iRCCS To Be RENO`,= RmIPLEY ASSOCIATES —vatep.1 or nwxe of a +—+— rLNLC t. 'Developer to enure that the ITdecnpc plan n cawdnetee .." the plan+ eye by other Cons4tants sa that the proposed gredeq. storm anal o attar CDt[R l na"Un does not col ad, preclude �ntellanoa and memtenmce of Idpseape eamenctiw l an cha don T. tmd+cape C.tegones —bee. zs' LIGMT tall Moderate to I, wecer Sod Areas 17.047 SQ. FT. Moderate wetar SNW ends 3W2 SQ, FT. RIV151ONS: Las Water OrMsed Speed dens 250IG SO. IT. 1g-% STAFF COMMENTS LT TOTAL- 5GG20 SQ IT, o-1e-ae sort eo"Th7a, es IQ.I rJCwesrDWd Shaln ' Ad wa eArD ] 23v 20F S;' SCALE. 1' • WNORTn MA. By. cs I __I I i I I , LAN05GAFE +i e1�' IRRIGATION I' II _l I� I� I� 5ATM NURSER + GARDEN I� I� IT -- I l _ r 14 CAA'Mr NDUSTRIAL PARK P.U.D. ]`STORY .." orncc 7ryANurncTURwc� 5 - '' — — — i ..i OFEj4 5TORAGC rp C N EULL'VNG MATCRIA zz: _F Rzres.,— OWNCR5MP GERTPIGATION n .mroe new..... r�.swTw A. 7XISTIN'GrFllKS1 R OSPCGT- SERLINC P LLFILING L pgPEGt ROAD SITE PLAN NOTES PLANNING ♦ ZONNG GCRTPIGATC VIGWITY MAP or J LAND USE STATISM vac es abr w aan LAB 5EVEN LAKE5 EU51NES5 PARK PUD. .. 3 ENERGY CONSERVATION �y 0. BMC LEGAL DCSGRPTION LEGEND WEST PUD R _ .iW M.� T vw mow ■PRELIMINARY • FINAL SITE PLAN �R�I PLEY ASSOCIATES i REVISIONS= } i biYl GpIRM; Cb K.ID• W.w[SiDwc SYCR•/� o u w 00 IMM oArz• vays OF'ii x. I - Ao' NORTK MAIN en cs J IP ig ig Q 0 0 a cc W Z J cc BL m iP PR HB RH IP IL RL IL RLP OUT T VICINITY MAP 02/02/96 #1-96 BMC WEST PUD N Preliminary & Final 1"=600' BMC West PUD - Preliminary and Final, #1-96 March 25, 1996 Page 5 RECOMMENDATION: Staff recommends approval of the BMC West P.U.D., Preliminary and Final, #1-96 with the following condition: 1. The Planning and Zoning Board approves this planned unit development final plan upon the condition that the development agreement, final utility plans, and final P.U.D., plans for the planned unit development be negotiated between the developer and City staff and executed by the developer prior to the second monthly meeting (May 20, 1996) of the Planning and Zoning Board following the meeting at which this planned unit development final plan was conditionally approved; or, if not so executed, that the developer, at said subsequent monthly meeting, apply to the Board for an extension of time. The Board shall not grant any such extension of time unless it shall first find that there exists with respect to said planned unit development final plan certain specific unique and extraordinary circumstances which require the granting of the extension in order to prevent exceptional and unique hardship upon the owner or developer of such property and provided that such extension can be granted without substantial detriment to the public good. If the staff and the developer disagree over the provisions to be included in the development agreement, the developer may present such dispute to the Board for resolution if such presentation is made at the next succeeding or second succeeding monthly meeting of the Board. The Board may table any such decision, until both the staff and the developer have had reasonable time to present sufficient information to the Board to enable it to make its decision. (If the Board elects to table the decision, it shall also extend the term of this condition until the date such decision is made). If this condition is not met within the time established herein (or as extended, as applicable), then the final approval of this planned unit development shall become null and void and of no effect. The date of final approval for this planned unit development shall be deemed to be the date that the condition is met, for purposes of determining the vesting of rights. For purposes of calculating the running of time for the filing of an appeal pursuant to Chapter 2, Article ll, Division 3, of the City Code, the "final decision" of the Board shall be deemed to have been made at the time of dispute is presented to the Board for resolution regarding provisions to be included in the development agreement, the running of time for the filing of an appeal of such "final decision" shall be counted from the date of the Board's decision resolving such dispute. BMC West PUD - Preliminary and Final, #1-96 March 25, 1996 Page 4 6. Architecture: The office/manufacturing building will have a combination of china white and gull gray synthetic stucco and metal siding with either an interstate blue or military blue metal roof. Accents colors will be midnight blue. The metal storage building will be a stone color. 7. Transportation: BMC West will not be required to construct the ultimate street improvements along Timberline Road at this time. It will be a part of the Development Agreement that they will be responsible for paying for their portion of the improvements when constructed in the future. The Developer will be providing a 36 foot wide paved surface to their driveway. At this point in time, the status of Timberline Road is being debated. There is a question of whether or not Timberline should be extended, what the configuration of any interim and/or ultimate cross section will be, and the alignment this road should take. Until a design can be completed and a commitment made as to the configuration that this road will take, it is undesirable for BMC West to build improvements that may or may not coincide with the future design. Therefore, instead of doing those improvements now, BMC West will be required to participate at the time those improvements are constructed. The proposed project will generate approximately 180 daily trips, 16 morning peak hour, and 18 evening peak hour trips. Due to the very low trip generation or the proposed project, an intersection level of service analysis was not required by the City. 8. Stormwater: The BMC West P.U.D. meets City Stormwater Utility design requirements. FINDINGS OF FACT/CONCLUSION: The BMC West P.U.D., Preliminary and Final, #1-96 earns 89% (16 out of 18) of the maximum applicable points on the Industrial Uses Point Chart of the L.D.G.S., exceeding the minimum required 50%. 2. The BMC West P.U.D., Preliminary and Final, #1-96 meets all applicable All Development Criteria of the Land Development Guidance System. 3. The BMC West P.U.D., Preliminary and Final, #1-96 is compatible with surrounding land uses. BMC West PUD - Preliminary and Final, #1-96 March 25, 1996 Page 3 not be required to construct the ultimate street improvements along Timberline Road at this time. It will be a part of the Development Agreement that they will be responsible for paying for their portion of the improvements when constructed in the future. d. reducing non-renewable energy usage through the application of energy conservation measures beyond those normally required by the Model Energy Code as adopted by the City - 8 points. The applicant has committed to measures 6, 7, 8, 10, 11, 12, 14, 18, 24, 25, 26, 28 and 33 as outlined under Method 2 of Appendix "E" of the Land Development Guidance System. These specific measures are listed on the P.U.D. Site Plan. 3. Neighborhood Compatibility: This P.U.D. is contiguous to both the approved but yet to be developed Cache La Poudre Industrial Park P.U.D. to the north; and the existing Seven Lakes Business Park P.U.D. In addition BMC West's commercial/retail building is directly south of this proposed site. Therefore, the proposed use is compatible with surrounding land uses. 4. Design: This request consists of a 43,756 square foot, one-story office/manufacturing facility that is placed on the western half of the property adjacent to Timberline Road. A 7,200 square foot storage building (open to the south) and open storage for building materials are planned on the eastern half of the site. An existing city bike path (Spring Creek Trail) runs along the eastern edge of the property. Landscaping and fencing will screen the outside storage from the public view. 5. Landscaping: A combination of evergreen and deciduous trees and shrubs will be planted along the Timberline Road frontage and in front of the office/manufacturing building. This combined with berms along Timberline Road will provide adequate screening for parking areas and will compliment the architecture of the building. The eastern edge of the property adjacent to the Spring Creek will be landscaped with native grasses and trees as requested by the Natural Resources Department. A six-foot chain link fence with slats will screen the outside storage area from the bike trail. The developer will be responsible for the maintenance and replacement of slats as needed. BMC West PUD - Preliminary and Final, #1-96 March 25, 1996 Page 2 COMMENTS: Background: The surrounding zoning and land uses are as follows: N: i-g; vacant, Cache la Poudre Industrial Park P.U.D. S: H-B; existing BMC West commercial building. E: i-p; Spring Creek, vacant, existing Seven Lake Business Park P.U.D. W: i-g; vacant. B-L; Bath Landscaping. This property was annexed into the City as part of the East Prospect First Annexation on September 6, 1973 and is zoned I-P, Planned Industrial with a P.U.D. condition. 2. Land Use: This is a request for Preliminary and Final P.U.D. approval for a 43,756 square feet office manufacturing facility, 7,200 square feet storage building and outside storage on approximately 6.55 acres. The property is located on the east side of Timberline Road, north of Prospect Road, north of the existing BMC West commercial building (Prospect - Timberline P.U.D., First Filing). The request meets the applicable All Development Criteria of the L.D.G.S. The request was evaluated against the Industrial Uses Point Chart of the Land Development Guidance System and earns 89% (16 out of 18) of the maximum applicable points on the Industrial Uses Point Chart of the L.D.G.S., exceeding the minimum required 50%. Points were awarded for the following criterion: b. being contiguous to an existing or planned office or industrial park - 6 points. The proposed P.U.D. is contiguous to the planned but undeveloped Cache la Poudre Industrial Park P.U.D. to the north and the existing Seven Lakes Business Park P.U.D. to the west. C. being located adjacent to an arterial street - 2 points. Timberline Road (classified as a major arterial) will be extended as a 36' wide paved surface to the driveway entrance of this P.U.D. BMC West will ITEM NO. 4 MEETING DATE 3/25/96 STAFF Mike Ludwig City of Fort Collins PLANNING AND ZONING BOARD STAFF REPORT PROJECT: BMC West P.U.D., Preliminary and Final, #1-96. APPLICANT: Ripley Associates 223 Jefferson Street, Suite A Fort Collins, CO 80524 OWNER: Jim Pask c/o BMC West 1007 Ogden Court Fort Collins, CO 80526 PROJECT DESCRIPTION: This is a request for Preliminary and Final P.U.D. approval for a 43,756 square foot office manufacturing facility, 7,200 square foot storage building and outside storage on approximately 6.55 acres. The property is located on the east side of Timberline Road, north of Prospect Road, north of the existing BMC West commercial building (Prospect - Timberline P.U.D., First Filing) and is zoned I-P, Planned Industrial with a P.U.D. condition. RECOMMENDATION: EXECUTIVE SUMMARY: Approval with condition. This request for Preliminary and Final P.U.D. approval: earns 89% (16 out of 18) of the maximum applicable points on the Industrial Uses Point Chart of the L.D.G.S., exceeding the minimum required 50%. meets all applicable All Development Criteria of the Land Development Guidance System. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750 PLANNING DEPARTMENT