Loading...
HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 4TH FILING, MOB (REDSTONE) - FDP - 32-98K - CORRESPONDENCE -[8/11/06] Provide easements on plat for all public water/sewer lines. Minimum widths: Water 20 feet; Sewer 30 feet. Curb stop on water service must be within easement. Topic: Water/WW Number: 50 Created: 8/11 /2006 [8/11/06] Show curb stop and meter pit. Curb stop must be within easement and meter pit must be within 2 feet of curb stop. Number: 51 Created: 8/11 /2006 [8/11/061 Provide 0.2 ft drop (min.) where connecting to existing sewer MH. Number: 52 Created: 8/11 /2006 [8/11/06] Include updated standard details for 1.5 and 2 inch meters. Number: 53 Created: 8/11 /2006 [8/11/06] See plans for other comments. Please return all of your redlined plans when you re -submit. Should you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, C� Cameron Gloss Current Planning Director Page 4 Department: PFA Issue Contact: Carie Dann Topic: fire Number: 70 Created: 8/16/2006 [8/16/06] REQUIRED ACCESS: Comments from a project letter dated March 24, 2004, regarding two access points were not addressed. The single access is from the private drive to the north of the proposed structure. Connecting the proposed Emergency Access Easement to the existing EAE to the west (in the parking lot) will help address this issue. Department: Traffic Operations Topic: Traffic Number: 54 [8/11/06] No issues Issue Contact: Eric Bracke Created: 8/11 /2006 Department: Transportation Planning Issue Contact: David Averill Topic: Transportation Number: 67 Created: 8/15/2006 [8/15/06] Please dimension all walkways on overall utility plan. Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan Topic: Easements Number: 45 Created: 5/21 /2004 [8/15/06] A letter from the property owner agreeing to the work outside of the plat boundary will be sufficient. [5/21/04] Off -site easements should be provided for any work to be done outside of the limits of this development proposal as is the case for some of the proposed storm sewer improvements. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Easements Number: 49 Created: 8/11/2006 [8/11/06] Provide offsite easement for public sanitary sewer and for 8-inch water main and fire hydrant. Minimum width for sewer easements is 30 feet and for water is 20 feet. Department: Stormwater-Water-Wastewater Issue Contact: Basil Harridan Topic: Grading Number: 68 Created: 8/15/2006 [8/15/06] Grading plan needs to be cleaned up. Too many overlapping labels. Topic Inlet Overflow Number: 75 Created: 8/17/2006 [8/17/06] Please provide erosion protection for the overflow path from the inlet at the east end of the parking lot. Topic: Landscape Plan Number: 69 Created: 8/16/2006 [8/16/06] Please ghost the storm lines shown on the plan. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Plat Number: 48 Created: 8/11 /2006 Page 3 Number: 59 Created: 8/11 /2006 [8/11/06] Please provide a letter from PVH for authorization to do offsite grading and drainage work. Topic: Plat Number: 60 Created: 8/11 /2006 [8/11/06] Please make corrections to the Plat per our meeting on August 10. Correct the title to read ... second filing and a portion of Lot 1 ... Revise the easement note on the cover sheet regarding easement vacations shown on this new Plat. Number: 61 Created: 8/11 /2006 [8/11/06] All other easements not being dedicated by this Plat but required for the project will need to be reviewed by the City prior to recordation. A review fee of $250 per easement document will apply. We strongly recommend that the separate easements be submitted as soon as possible to minimize any delay to the approval of the project and issuance of a permit. Topic: Technical Services Number: 71 Created: 8/16/2006 [8/16/06] Boundary and legal close. Legal and Plat do not match. Please see redline comments. Number: 72 Created: 8/16/2006 [8/16/06] Do not use Block 1 in description, can just be Lot 1. Number: 73 Created: 8/16/2006 [8/16/06] Several line over text, text overlap problems which will not scan well. Please see redline comments. Number: 74 Created: 8/16/2006 [8/16/06] Please correct all typographical errors in the legal description. Department: Light & Power Issue Contact: Alan Rutz Topic: General Number: 62 Created: 8/14/2006 [8/14/06] Will an Access Easement be required to service the new transformer from the existing property to the west? Number: 63 Created: 8/14/2006 [8/14/06] The area east of the parking lot and east of the building is subject to Electric Development Charges. The area north of the Private Drive is also subject to Electric Development Charges. These areas need to be platted and billed prior to installation of the electric system. Department: Natural Resources Topic: General Number: 47 [8/3/06] No issues. Issue Contact: Doug Moore Created: 8/3/2006 Page 2 STAFF PROJECT REVIEW City of Fort Collins s� BHA DESIGN Date: 08/18/2006 ANGIE MILEWSKI 4803 INNOVATION DR FT. COLLINS, CO 80525 Staff has reviewed your submittal for PVH HEALTH SYSTEMS, HARMONY CAMPUS, 4TH FILING, MOB (REDSTONE) - FINAL PLANS, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Cameron Gloss Topic: Landscape Plan Number: 64 Created: 8/14/2006 [8/14/06] When proceeding to mylar drawings, please review and correct typographical errors on the landscape plan. Topic: Plat Number: 65 Created: 8/14/2006 [8/14/06] Please remove the title "Preliminary Plat" from the plat document. Topic: Post Office Number: 66 Created: 8/15/2006 [8/15/06] Bonnie Ham from the USPS offered the following comment: Developer must provide adequate mail receptacles for occupants. Number of potential tenants is unknown at this time. Department: Engineering Issue Contact: Randy Maiziand Topic: Engineering Number: 55 Created: 8/11 /2006 [8/11/06] Please submit the attached development agreement information sheet so that staff can begin preparing the draft agreement. Number: 56 Created: 8/11 /2006 [8/11/06] All easements not being recorded with the replat must be recorded by separate instrument. Each easement document must be reviewd by the City prior to recordation. Please submit all separate easement documents for review with a $250 review fee per document. (sewer, parking lot, drainage etc... ) Number: 57 Created: 8/11 /2006 [8/11/06] A connecting walkway shall be provided from the proposed building site to the public street system, Snow Mesa Drive. The walk shall be at least 4.5 feet wide and contained within an easement outside the project boundary. You may also submit a modification to the code as discussed at the staff review meeting to utilize the existing concrete walk on the north side of the private drive. Number: 58 Created: 8/11 /2006 [8/11/06] A small drainage easement will be needed for the rip rap pad outlet structure to the existing pond to the east. Please show and label the drainage easement on the plans, by separate document. Page 1