HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 4TH FILING, MOB (REDSTONE) - FDP - 32-98K - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET�wtaL -
7t. 2.1 7-600
ANAL PLAN ROUTING SHEET (�edst-" )C 1
Item: 3 Pv'rl 4�j'NWJ cc��V 5 Z�)ty' d4m
This project went to / has been scheduled for Public Hearing oz
The following table lists final plan submittal requirements for this project.
+�A final fee of $1,000.00 is required at the time of submittal unless otherwise waived or reduced.
Fee Waiver/Reduction Approval: Amount: Date:
Planner: Cwti' ei U l'1 `> s Engineer:
Cityof Fort Collins
CURRENT PLANNING
AdvanceBuilding
■�
�■.■■C■■■.■■■
Inspectio
Engineering Pavement
LightEngineering
• .
■■■■■n■■■■
Poudre Fire Authority
Post Office
Stormwater
■
■■■■■■■■■
IMINTZ
Traffic Operations___§
County Assessor
..
■■■■■
■�■■■■■■
TOTAL To be Submitted