Loading...
HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 4TH FILING, MOB (REDSTONE) - FDP - 32-98K - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET�wtaL - 7t. 2.1 7-600 ANAL PLAN ROUTING SHEET (�edst-" )C 1 Item: 3 Pv'rl 4�j'NWJ cc��V 5 Z�)ty' d4m This project went to / has been scheduled for Public Hearing oz The following table lists final plan submittal requirements for this project. +�A final fee of $1,000.00 is required at the time of submittal unless otherwise waived or reduced. Fee Waiver/Reduction Approval: Amount: Date: Planner: Cwti' ei U l'1 `> s Engineer: Cityof Fort Collins CURRENT PLANNING AdvanceBuilding ■� �■.■■C■■■.■■■ Inspectio Engineering Pavement LightEngineering • . ■■■■■n■■■■ Poudre Fire Authority Post Office Stormwater ■ ■■■■■■■■■ IMINTZ Traffic Operations___§ County Assessor .. ■■■■■ ■�■■■■■■ TOTAL To be Submitted