HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 4TH FILING, MOB (REDSTONE) - FDP - 32-98K - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTo Certification that notice has been provided to the mineral estate owner (1 copy).
❑ Executed deeds of dedication (contingent on final approval). /IA-4
❑ Executed recorded agreements (12 copies). //1�,4
❑ Other information Director may require:
- Natural area or environmental study
- Wetland Deliniation
►o 1 *1 rI ? C/V 1
Revised February 8, 2006
QCdSto✓iG ?48(Fvf{ vmony O)1pUs)
r
LUYe •$HA-
Submittal Checksheet
Final Plan Review
The following information is required to be submitted, unless waived, with all
applications. Any item waived must be dated and initialed by a planner with the
City of Fort Collins Current Planning Department.
❑'Application form and filing fee.
X( Transportation Development Review Fee — please contact Engineering at 221-6605
for information.
Name and address of each owner of property within the boundaries of the development
plan area.
List of names of all general and/or limited partners, managers and directors and/or officers
and directors of the corporation involved as either applicants or owners.
o Final site plan. See the submittal requirements for specific information to be presented on
the final site plan. (30 copies 24" x 36" — folded).
Subdivision Plat (23 copies 24" x 36" — folded).
Architectural elevations (8 copies 24" x 36" — folded).
i� Landscape Plan. See the submittal requirements for specific information to be presented
on the landscape plan. (20 copies 24" x 36" — folded).
)� Drainage and erosion control report (4 copies).
,Cis Final utility and drainage plans (13 copies 24" x 36" — unfolded).
X Requirements for utility plans checklist (1 copy).
)s( An update of the Transportation Impact Analysis (TIA) (7 copies).
Soils report (2 copies).
Subsurface Hydrologic Study (4 copies).
Revised February 8, 2006