HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 4TH FILING, MOB (REDSTONE) - FDP - 32-98K - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY_ Page 1 of I
Luke Oldenburg
From: Matt Delich [matt@delichassoc.com]
Sent: Wednesday, August 02, 2006 10:23 AM
To: Luke Oldenburg
Subject: Poudre Valley Health System Harmony Campus (PVHSHC)
To Whom It May Concern:
This email provides a trip generation analysis of the proposed PVHSHC 'Redstone Medical Office
Building" (MOB). In a TIS memorandum, dated March 30, 2004, an MOB, at the same location, was proposed
and analyzed. That MOB was 55,904 sf. Analyses indicated that the key intersections would operate
acceptably. Since that time, a signal has been installed at the Harmony/Snow Mesa intersection.
The proposed MOB is approximately 72,000 sf. The trip generation of the MOB will increase by 660 daily trip
ends, 40 morning peak hour trip ends, and 49 afternoon peak hour trip ends compared to that reported in the
cited memorandum. This increase in traffic will have a negligible impact of the level of service at the key
intersections, compared to that reported in the previous memorandum.
It is respectfully requested that this email satisfy the transportation impact study requirements of the proposed
MOB. Do not hesitate to contact me if additional information is required. Thank you.
Matthew J. Delich, P.E.
Delich Associates
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
8/2/2006