Loading...
HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 3RD FILING, PRIMARY CARE PLAZA - FDP - 32-98H - CORRESPONDENCE -FINAL PLAN COMMENT SHEET City of Fort Callins REC. D Current Planning DATE: June 23, 2004 TO: Technical Services PROJECT: #32-98H PVH Harmony Campus, 3rd Filing, Primary Care Plaza PDP — Final Plans All comments must be received by Cameron Gloss no later than the staff review meeting: 'Sc.J July 7, 2004 Note - Please identify your redlines for future reference I, aoa�NZ7HfLY � GEGAG Lb ��7 CWSE, �4n/D Lb NA? /r!/' �� 7- < 3, G-e-�L. Alq S 01-evn/G ,, "&- r,0 4 D dZ _ 4� /-�s �v 4AI,4s C.4 s-r L /' & o F /V _ TN z�-- SOL_7-+- 1 i7.,Z, teas 'n rE_-o,, a.c r'&-D Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape 9:2-r Staff would encourage the applicant to meet with all reviewers with issues identified in this letter to review to ensure that these few remaining issues have been satisfactorily addressed. Please return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, Cameron Gloss Current Planning Director Page plans be built ahead of this site development, otherwise a drainage easement for the off -site swale and pond would be required. Topic: Utility plans Number: 63 Created: 5/21 /2004 [7/2/04] Rip rap should be buried to minimize nuisance problems. Please dhow HGL on pipe profile. The area inlet detail shown is a CDOT type, for a parking lot application a City standard area inlet is more appropriate. [5/21 /04] Please move proposed storm sewer alignment in the parking lot further south as not to impact electric transformer. At final please provide a storm sewer plan and profile, as well as an erosion control plan for the construction on this site. At finals provide details for proposed rip rap Department: Transportation Planning Issue Contact: Tom Reiff Topic: General Number: 67 Created: 7/6/2004 [7/6/04] No further comments. Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 61 Created: 5/20/2004 (7/9/04] Call out size of proposed water service. Indicate connection to existing water mains. [5/20/04] Is 1.5-inch water service adequate for this facility? Provide flow calculations for our review. See site, landscape and utility plans for other comments. Topic: General Number: 29 Created: 2/24/2004 [7/9/04] [5/20/04] [4/13/04] [2/24/04] Call out all fittings, thrust blocks, gate valves, sizes of lines/services, manholes, etc. Number: 30 [7/9/04] [5/20/04] [4/13/04] Created: 2/24/2004 [2/24/04] Provide all appropriate standard detail on the next submittal. Paae 2 6a STAFF PROJECT REVIEW City of Fort Collins BHA DESIGN Date: 07/12/2004 ANGIE MILEWSKI 4803 INNOVATION DR. FT. COLLINS, CO 80525 Staff has reviewed your submittal for PVH HEALTH SYSTEMS, HARMONY CAMPUS, 3RD FILING, PRIMARY CARE PLAZA PDP- TYPE I AND FINAL PLAN, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Cameron Gloss Topic: General Number: 73 Created: 7/12/2004 Please remove the "Planning and Zoning Board" certification title block from the Site Plan as this PDP is not subject to its review. Number: 74 Created: 7/12/2004 Parking Stall dimensions. Provide dimensions for the handicap parking stalls and the south field of parking on the site plan consistent with the rest of the site plan. Department: Engineering Issue Contact: Sheri Wamhoff Topic: General Number: 68 Created: 7/6/2004 [7/6/04] Need to reference the general notes or add them to the set. Number: 69 Created: 7/6/2004 [7/6/04] The driveways need to be designed and shown as concrete to the property line and per the high volume driveway details. Show the radi as 15 foot redius. Number: 70 Created: 7/6/2004 [7/6/04] Additional utility easments are needed beyond what is shown to accomidate the utilities as they go past the end of the drives. Number: 71 Created: 7/6/2004 [7/6/04] Remove street intersection detail and add high volume driveway detail and curb gutter and walk details. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Erosion Control Number: 72 Created: 7/8/2004 Please schedule a meeting with Bob Zakely to discuss this project. Department: Stormwater Utility Issue Contact: Basil Hamdan Topic: Off -site easements Number: 66 Created: 7/2/2004 [7/2/04] If the utility work shown on the plans for the PVH infrastructure are done first, then no off -site easements would be required. It is therefore recommended that the infrastructure Page 1