COMMENT SHEET
City of Fort Callins REC. D
Current Planning
DATE: June 23, 2004 TO: Technical Services
PROJECT: #32-98H PVH Harmony Campus, 3rd Filing,
Primary Care Plaza PDP — Final Plans
All comments must be received by Cameron Gloss no later than the
staff review meeting:
'Sc.J
July 7, 2004
Note - Please identify your redlines for future reference
I, aoa�NZ7HfLY � GEGAG Lb ��7 CWSE, �4n/D Lb NA? /r!/' ��
7- <
3, G-e-�L. Alq S 01-evn/G ,, "&- r,0 4 D dZ _
4� /-�s �v 4AI,4s C.4 s-r L /' & o F /V _
TN z�-- SOL_7-+- 1
i7.,Z, teas 'n rE_-o,, a.c r'&-D
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
9:2-r
Staff would encourage the applicant to meet with all reviewers with issues identified in this
letter to review to ensure that these few remaining issues have been satisfactorily
addressed.
Please return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely,
Cameron Gloss
Current Planning Director
Page
plans be built ahead of this site development, otherwise a drainage easement for the off -site
swale and pond would be required.
Topic: Utility plans
Number: 63 Created: 5/21 /2004
[7/2/04]
Rip rap should be buried to minimize nuisance problems.
Please dhow HGL on pipe profile.
The area inlet detail shown is a CDOT type, for a parking lot application a City standard area
inlet is more appropriate.
[5/21 /04]
Please move proposed storm sewer alignment in the parking lot further south as not to
impact electric transformer.
At final please provide a storm sewer plan and profile, as well as an erosion control plan for
the construction on this site.
At finals provide details for proposed rip rap
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 67 Created: 7/6/2004
[7/6/04] No further comments.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 61 Created: 5/20/2004
(7/9/04] Call out size of proposed water service. Indicate connection to existing water
mains.
[5/20/04] Is 1.5-inch water service adequate for this facility? Provide flow calculations for
our review.
See site, landscape and utility plans for other comments.
Topic: General
Number: 29 Created: 2/24/2004
[7/9/04]
[5/20/04]
[4/13/04]
[2/24/04] Call out all fittings, thrust blocks, gate valves, sizes of lines/services, manholes,
etc.
Number: 30
[7/9/04]
[5/20/04]
[4/13/04]
Created: 2/24/2004
[2/24/04] Provide all appropriate standard detail on the next submittal.
Paae 2
6a STAFF PROJECT REVIEW
City of Fort Collins
BHA DESIGN Date: 07/12/2004
ANGIE MILEWSKI
4803 INNOVATION DR.
FT. COLLINS, CO 80525
Staff has reviewed your submittal for PVH HEALTH SYSTEMS, HARMONY CAMPUS, 3RD
FILING, PRIMARY CARE PLAZA PDP- TYPE I AND FINAL PLAN, and we offer the
following comments:
ISSUES:
Department: Current Planning Issue Contact: Cameron Gloss
Topic: General
Number: 73 Created: 7/12/2004
Please remove the "Planning and Zoning Board" certification title block from the Site Plan as
this PDP is not subject to its review.
Number: 74 Created: 7/12/2004
Parking Stall dimensions. Provide dimensions for the handicap parking stalls and the south
field of parking on the site plan consistent with the rest of the site plan.
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: General
Number: 68 Created: 7/6/2004
[7/6/04] Need to reference the general notes or add them to the set.
Number: 69 Created: 7/6/2004
[7/6/04] The driveways need to be designed and shown as concrete to the property line and
per the high volume driveway details. Show the radi as 15 foot redius.
Number: 70 Created: 7/6/2004
[7/6/04] Additional utility easments are needed beyond what is shown to accomidate the
utilities as they go past the end of the drives.
Number: 71 Created: 7/6/2004
[7/6/04] Remove street intersection detail and add high volume driveway detail and curb
gutter and walk details.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Erosion Control
Number: 72 Created: 7/8/2004
Please schedule a meeting with Bob Zakely to discuss this project.
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Off -site easements
Number: 66 Created: 7/2/2004
[7/2/04] If the utility work shown on the plans for the PVH infrastructure are done first, then
no off -site easements would be required. It is therefore recommended that the infrastructure
Page 1