Loading...
HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 4TH FILING, MOB (REDSTONE) - PDP - 32-98G - CORRESPONDENCE -[4/21/04] Will the drive aisle that goes in front of the new medical building be extended to the east with future expansion? Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 17 Created: 4/21 /2004 [5/18/04] [4/21/04] Provide utility easements for all sanitary sewer mains and offsite utility easements for sanitary sewer services which cross adjacent lots. Number: 18 [5/18/04] Created: 4/21 /2004 [4/21/04] Include all appropriate water and sewer details with the final submittal. Number: 19 [5/18/04] Created: 4/21 /2004 [4/21/04] Our records indicate that a 4-inch and 6-inch water lines were stubbed out for this building. Clearly define the abandonment of the existing 4-inch and 6-inch water line and installation of the proposed 1 1/2-inch water service and 6-inch fire line. Number: 20 Created: 4/21 /2004 [5/18/04] Provide a profile of the proposed 8-inch sanitary sewer main. [4/21/04] See site, landscape and utility plans for other comments. Please return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, �G Cameron Gloss Page 3 [5/21/04] Off -site easements should be provided fro any work to be done outside of the limits of this develoment proposal as is the case for some of the proposed storm sewer improvements. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Erosion/Sediment Control Number: 31 Created: 4/21 /2004 [5/21/04] At the final plan, please submit a complete sediment/erosion control plan and report per City of Fort Collins specifications. Department: Stormwater Utility Issue Contact: Basil Harridan Topic: Utility Plans Number: 44 Created: 5/21 /2004 [5/21/04] At the final plan submittal, all proposed storm sewer lines should be shown in plan and profile. A riprap should be provided at the outlet of the pipes draining into Pond 393. Department: Transportation Planning Issue Contact: Tom Reiff Topic: Transportation Number: 24 Created: 4/21 /2004 [5/19/04] The plans reflect the additional width for the walkway, however, on the plans the widths are still labeled at 671576' please change the width labels to 7713'/7'. [4/21/04] Please consider increasing the widths of the 6 foot attached walkways along the walkway spine through the parking lot to a minimum 7 foot width. Potential users of the walkways accessing the medical building could be people in wheelchairs, in casts, using crutches, etc... and the extra width will increase their mobility since two feet of the walkway will be taken up by cars overhanging into the walkway. This would leave a minimum of a 5 foot clear space enough for two wheel chairs to pass each other. Number: 26 Created: 4/21 /2004 [5/19/04] [Suggestion] Since the drive aisle in front of the medical building will continue to the east you may want to consider locating the curb in the ultimate location so the 30' drive aisle width can continue to the east (see red lines). Page 2 M � MimiSTAFF PROJECT REVIEW BHA DESIGN Date:05/24/2004 ANGIE MILEWSKI 4803 INNOVATION DR FT. COLLINS, CO 80525 Staff has reviewed your submittal for PVH HEALTH SYSTEMS, HARMONY CAMPUS, 4TH FILING, MEDICAL OFFICE BUILDING II PDP - TYPE I, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Cameron Gloss Topic: General Number: 46 Created: 5/24/2004 [5/24/04] An administrative public hearing has been -scheduled for this PDP application on June 1, 2004 at 281 N. College Conference Room A. Department: Engineering Topic: General Number: 15 [5/18/04] Issue Contact: Dave Stringer Created: 4/20/2004 [4/20/04] No comments on this PDP submittal. Will have comments on Final Compliance Plan. Engineering okay for hearing Department: Light & Power Issue Contact: Alan Rutz Topic: Traffic Number: 41 Created: 5/17/2004 ,[5/17/04] See Comment # 11. This detail needs to include the proposed new transformer location and electric line going back to existing oval vault. Number: 42 Created: 5/17/2004 [5/17/041 Show proposed transformer location for future building. Department: Natural Resources Issue Contact: Doug Moore Topic: General Number: 43 Created: 5/19/2004 [5/19/04] No issues. Department: Stormwater Utility Topic: Easements Number: 45 Issue Contact: Basil Harridan Created: 5/21 /2004 Page 1