Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 4TH FILING, MOB (REDSTONE) - PDP - 32-98G - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYIVlultimodal Transportation Level of Service Manual
LOS Smmla ds for Development Review - Bicycle
Figure 7. Bicycle LOS Worksheet
Fjj
I2]
C3]
IJ
level of service - connectivity
Fntum actual proposed
base connectivity: C 6 A "
specific connections to priority sites:
description of applicable
destination area within 1,320'
including address
TK Au T Sc rI 0L
destination area
classification
(see text)
IIEIEIWII
1 c
P. 20
�f
� l6HPo2� �Y
l�AT�
City of Fort Collins Transportation Master Plan
Multimodal Transportation Level of Service Manual
LOS Standards for Development Review - Pedestrian
Figure 6. Pedestrian LOS Worksheet
roject location classification:-remsirajeg(Aop-, I"L 4)A4g= Ag0!A (enter as many as apply
F
U
la
description of applicable
destination area within 1,320'
including address
90BILe 6�oM�P.oR�
PRt��2� Gdru�
U O
C'PR,oPo s ,qt;�')
ST -r saaU CRe-El&.
Cr,,�Mje--
kallao6ep-000sp
SNoPP(JA CE'wap-
W 9ST o P
`f ee,w6-
destination area
classification
(see text)
�
I01010101©
®©101�1©10�
®rC�It�1��101�
�©10101©1©
P. 18
City of Fort Collins Transportation Master Plan
N
m
m
ITT
i=
1
Harmony w
m
E
O U
4 �
Timberwood
L Li
SCALE: 1'=1000'
PEDESTRIAN INFLUENCE AREA
1'7
APPENDIX D
240
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/2/2004
Analysis Time Period: am pm
Intersection: Harmony/Mobile Home Park
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: recent short bkgr total
Project ID: 0363me07
East/West Street: Harmony Road
North/South Street: Mobile Home Park
Intersection Orientation: EW Study period (hrs)
Major Street:
Vehicle Volumes and Adjustments
Approach Eastbound Westbound
Movement 1 2 3 1 4 5
L T R I L T
9
0.25
Volume
110
1545
20
1990
35
Peak -Hour Factor, PHF
0.91
0.91
0.85
0.90
0.90
Hourly Flow Rate, HFR
120
1697
23
2211
38
Percent Heavy Vehicles
0
--
--
--
--
Median Type/Storage
TWLTL
/ 3
RT Channelized?
No
No
Lanes
1
2 1
2 1
Configuration
L
T R
T R
Upstream Signal?
Yes
Yes
Minor Street: Approach
Northbound
Southbound
Movement
7
8
9
I 10 11
12
L
T
R
I L T
R
Volume
30
10
75
Peak Hour Factor, PHF
0.85
0.85
0.85
Hourly Flow Rate, HFR
35
11
88
Percent Heavy Vehicles
0
0
0
Percent Grade M 0
0
Flared Approach: Exists?/Storage
Lanes
1
1
1
Configuration
R
L
R
Approach
Movement
Lane Config
v (vph)
C (m) (vph)
v/c
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
Delay, Queue Length, and Level of Service
EB WB Northbound Southbound
1 4 1 7 8 9 10 11 12
L I R I L R
120
35
11
88
240
628
83
475
0.50
0.06
0.13
0.19
2.56
0.18
0.44
0.67
34.1
11.1
54.9
14.3
D
B
F
B
11.1
18.8
B
C
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2 2/2004
Analysis Time Period: am pm
Intersection: armony/Mobile Home Park
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: recent hort b k g r d total
Project ID: 0363me07
East/West Street: Harmony Road
North/South Street: Mobile Home Park
Intersection Orientation: EW Study period (hrs): 0.25
Major Street:
Vehicle Volumes and Adjustments
Approach Eastbound Westbound
Movement 1 2 3 1 4 5
L T R I L T
6
R
Volume
50
1820
35
1365
15
Peak -Hour Factor, PHF
0.96
0.96
0.85
0.86
0.86
Hourly Flow Rate, HFR
52
1895
41
1587
17
Percent Heavy Vehicles
0
--
--
--
--
Median Type/Storage
TWLTL
/ 3
RT Channelized?
No
No
Lanes
1
2 1
2 1
Configuration
L
T R
T R
Upstream Signal?
Yes
Yes
Minor Street: Approach
Northbound
Southbound
Movement
.7
8
9
I 10
11
12
L
T
R
I L
T
R
Volume
10
40
120
Peak Hour Factor, PHF
0.85
0.85
0.85
Hourly Flow Rate, HFR
11
47
141
Percent Heavy Vehicles
2
0
0
Percent Grade (%)
0
0
Flared Approach: Exists?/Storage
Lanes
1
1
1
Configuration
R
L
R
Approach
Movement
Lane Config
Delay, Queue Length, and Level of Service
EB WB Northbound Southbound
1 4 1 7 8 9 I 10 11 12
L I R I L R
v (vph)
52
11
47
141
C(m) (vph)
465
594
159
742
v/c
0.11
0.02
0.30
0.19
95% queue length
0.38
0.06
1.16
0.70
Control Delay
13.7
11.2
36.9
11.0
LOS
B
B
E
B
Approach Delay
11.2
17.5
Approach LOS
B
C
74
R HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/2/2004
Analysis Time Period: am®
Intersection: Harmony/RT Access
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: recent shor b k g r d total
Project ID: 0363me07
East/West Street: Harmony Road
North/South Street: RT Access
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
1615
100
Peak -Hour Factor, PHF
0.91
0.91
Hourly Flow Rate, HFR
1774
109
Percent Heavy Vehicles
--
--
-- --
Median Type/Storage
Undivided
/
RT Channelized?
No
Lanes
2 1
Configuration
T R
Upstream Signal?
Yes
No
Minor Street: Approach
Northbound
Southbound
Movement
7 8
9
I 10 11 12
L T
R
I L T R
Volume 60
Peak Hour Factor, PHF 0.85
Hourly Flow Rate, HFR 70
Percent Heavy Vehicles 2
Percent Grade M 0 0
Flared Approach: Exists?/Storage
Lanes 1
Configuration R
Approach
Movement
Lane Config
v (vph)
C (m) (vph)
v/c
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
Delay, Queue Length, and Level of Service
EB WB Northbound Southbound
1 4 1 7 8 9 i 10 11 12
I R I
12.2
B
70
570
0.12
0.42
12.2
B
Z3
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.' Matthew J. Delich, P.E.
Date Performed: 2 2/2004
Analysis Time Period: am m
Intersection: armony/RT Access
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: recen shor bkgr< total
Project ID: 0363me07
East/West Street: Harmony Road.
North/South Street: RT Access
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 1 4 5 6
L T R I L, T R
Volume
1890
155
Peak -Hour Factor, PHF
0.96
0.95
Hourly Flow Rate, HFR
1968
163
Percent Heavy Vehicles
--
--
-- --
Median Type/Storage
Undivided
/
RT Channelized?
No
Lanes
2 1
Configuration
T R
Upstream Signal?
Yes
No
Minor Street: Approach
Northbound
Southbound
Movement
7 8
9
1 10 11 12
L T
R
1 L T R
Volume 15
Peak Hour Factor, PHF 0.85
Hourly Flow Rate, HFR 17
Percent Heavy Vehicles 2
Percent Grade M 0 0
Flared Approach: Exists?/Storage
Lanes 1
Configuration R
Approach
Movement
Lane Config
v (vph)
C (m) (vph)
v/c
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
Delay, Queue Length, and Level of Service
EB WB Northbound Southbound
1 4 1 7 8 9 1 10 11 12
1 R I
11.8
B
17
549
0.03
0.10
11.8
B
2Z
HCS2000: Signalized Intersections Release 4.1d
Analyst: Michael Inter.: Timberline/Timberwood
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 8/22 03 Jurisd: Fort Collins
Period: am(_/ Year recent ort b k g r total
Project ID: 0363me07
E/W St: Timberwood Drive N/S St: Timberline Road
SIGNALIZED INTERSECTION SUMMARY
I Eastbound I Westbound I Northbound I Southbound
I L T R I L T R I L T R I L T R
I i I I
No. Lanes I 2 1 1 1 1 1 1 I 1 2 1 1 2 2 1
LGConfig I L T R I L T R I L T R I L T R
Volume 1185 5 40 195 10 350 145 630 25 185 930 145
Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0
RTOR Vol 1 0 1 0 1 0 1 0
Duration 0.25
Area
Type: All
other areas
Signal
Operations
_
Phase Combination 1
2
3 4
1 5
6
7 8
EB Left A
A
I NB Left A
Thru
A
A
I Thru
P
Right
A
A
I Right
P
Peds
X
I Peds
WB Left A
I SB Left A
A
Thru
A
I Thru
A
P
Right
A
I Right
A
P
Peds
X
I Peds
X
NB Right
A
I EB
Right
A
SB Right
A A
I WB
Right
A
A
Green
8.0 4.0
16.0
8.0
4.0
50.0
Yellow
0.0 0.0
3.0
0.0
0.0
3.0
All Red
0.0 0.0
2.0
0.0
0.0
2.0
Cycle
Length:
100.0 secs
Intersection
Performance
Summary
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L 446
3433
0.49
0.13
41.3
D
T 373
1863
0.02
0.20
32.1
C
37.9
D
R 522
1583
0.09
0.33
23.2
C
Westbound
L 159
1770
0.70
0.09
57.4
E
T 298
1863
0.04
0.16
35.6
D
42.3
D
R 522
1583
0.79
0.33
38.3
D
Northbound
L 159
1770
0.33
0.09
43.9
D
T 1770
3539
0.41
0.50
16.4
B
17.8
B
R 997
1583
0.03
0.63
7.0
A
Southbound
L 446
3433
0.22
0.13
39.2
D
T 1911
3539
0.57
0.54
15.6
B
16.0
B
R 1124
1583
0.15
0.71
4.8
A
Intersection Delay
= 23.3
(sec/veh)
Intersection
LOS = C
2�
HCS2000: Signalized Intersections Release 4.1d
Analyst: Michael Inter.: Timberline/Timberwood
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 8 22/03 Jurisd: Fort Coll' s
Period: m m Year recent hort bkgr tota
Project D• 0363me07
E/W St: Timberwood Drive N/S St: Timberline Road
SIGNALIZED INTERSECTION SUMMARY
I Eastbound I Westbound I Northbound I Southbound
I L T R I L T R I L T R I L T R
I I I I
No. Lanes I 2 1 1 I 1 1 1 1 1 2 1 I 2 2 1
LGConfig I L T R I L T R I L T R I L T R
Volume 1160 10 25 125 0 85 145 980 90 1235 500 55
Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0
RTOR Vol 1 0 1 0 1 0 1 0
Duration 0.25
Area
Type: All
other
areas
Signal
Operations
_
Phase Combination
1
2
3 4
1
5
6
7 8
EB Left
A
A
I NB
Left
A
Thru
A
A
I
Thru
P
Right
A
A
1
Right
P
Peds
X
I
Peds
WB Left
A
I SB
Left
A
A
Thru
A
I
Thru
A
P
Right
A
I
Right
A
P
Peds
X
I
Peds
X
NB Right
A
I EB
Right
A
SB Right
A
A
I WB
Right
A
A
Green
8.0
4.0
16.0
8.0
4.0
50.0
Yellow
0.0
0.0
3.0
0.0
0.0
3.0
All Red
0.0
0.0
2.0
0.0
0.0
2.0
Appr/ Lane
Lane Group
Grp Capacity
Cycle Length: 100.0
_Intersection Performance Summary
Adj Sat Ratios Lane Group Approach
Flow Rate,
(s) v/c g/C Delay LOS Delay LOS
Eastbound
L 446
3433
0.42
T 373
1863
0.03
R 522
1583
0.06
Westbound
L 159
1770
0.18
T 298
1863
0.00
R 522
1583
0.19
Northbound
L 159
1770
0.33
T 1770
3539
0.65
R 997
1583
0.11
Southbound
L 446
3433
0.61
T 1911
3539
0.30
R 1124
1583
0.06
Intersection
Delay
= 22.6
0.13
40.7
D
0.20
32.2
C 38.0 D
0.33
22.9
C
0.09
42.7
D
0.16
35.3
D 28.3 C
0.33
24.1
C
0.09
43.9
D
0.50
20.4
C 20.3 C
0.63
7.4
A
0.13 43.6
0.54 12.7
0.71 4.4
(sec/veh)
D
B 21.3 C
A
Intersection LOS = C
secs
ZO
HCS2000: Signalized
Intersections
Release 4.1d
Analyst:
Michael
Inter.:
Timberline/Harmony
Agency:
Matthew J. Delich, P.E.
Area Type:
All other areas
Date:
8/22 03
Jurisd:
Fort Collins
Period:
any pm
Year
recent short bkgrd otal
Project
ID. 363me07
E/W St:
Harmony Road
N/S St:
Timberline Road
I Eastbound
L T R
I
No. Lanes 1 2
LGConfig I L
Volume 1340
Lane Width 112.0
RTOR Vol I
SIGNALIZED INTERSECTION SUMMARY_
I Westbound I Northbound
I L T R I L T R
I I
2 1 1 2 2 1 1 2 2 0
T R I L T R I L TR
1235 240 1300 1460 355 1445 595 125
12.0 12.0 112.0 12.0 12.0 112.0 12.0
0 1 0 1 0
I Southbound
L T R
I
I 2 2 1
I L T R
1355 645 525
112.0 12.0 12.0
1 0
Duration 0.25 Area Type: All other areas
_ Signal Operations_
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A I NB Left A
Thru A P I Thru A A
Right A P I Right A A
Peds X X I Peds X X
WB Left A I SB Left A
Thru P A I Thru A A
Right P A 1 Right A A
Peds X X I Peds X X
NB Right I EB Right A
SB Right A I WB Right A
Green 15.0 36.0 16.0 16.0 12.0 15.0
Yellow 0.0 0.0 3.0 0.0 0.0 3.0
All Red 0.0 0.0 2.0 0.0 0.0 2.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 458
T 1504
R 884
Westbound
L 486
T 1534
R 884
Northbound
L 486
TR 804
Southbound
3433
0.84
0.13
64.1
E
3539
0.93
0.43
39.4
D 40.1 D
1583
0.31
0.56
9.6
A
3433
0.66
0.14
52.0
D
3539
1.01
0.43
55.2
E 47.2 D
1583
0.43
0.56
10.6
B
3433
1.00
0.14
91.2
F
3447
0.97
0.23
71.0
E 78.7 E
L 458 3433 0.84 0.13 64.1 E
T 796 3539 0.88 0.22 56.2 E 56.1 E
R 620 1583 0.92 0.39 50.6 D
Intersection Delay = 52.7 (sec/veh) Intersection LOS = D
0
HCS2000: Signalized Intersections Release 4.1d
Analyst: Michael Inter.: Timberline/Harmony
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 8 22/03 Jurisd: Fort Colli s
Period: m m Year recent shor bkgrd otal
Project 0363me07
E/W St: Harmony Road N/S St: Timberline Road
SIGNALIZED INTERSECTION SUMMARY
I Eastbound I Westbound I Northbound I Southbound
I L T R I L T R I L T R I L T R
I I I I
No. Lanes 1 2 2 1 I 2 2 1 I 2 2 0 I 2 2 1
LGConfig I L T R I L T R I L TR I L T R
Volume 1260 1300 175 1220 910 390 1315 615 295 1450 405 295
Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 12.0
RTOR Vol 1 0 1 0 1 0 1 0
Duration 0.25
Area
Type: All
other
areas
Signal
Operations
Phase Combination
1
2
3 4
1
5
6
7 8
EB Left
A
I NB
Left
A
Thru
A
P
I
Thru
A
A
Right
A
P
I
Right
A
A
Peds
X
X
I
Peds
X
X
WB Left
A
I SB
Left
A
Thru
P
A
I
Thru
A
A
Right
P
A
I
Right
A
A
Peds
X
X
I
Peds
X
X
NB Right
I EB
Right
A
SB Right
A
I WB
Right
A
Green
12.0
36.0
10.0
15.0
20.0
17.0
Yellow
0.0
0.0
3.0
0.0
0.0
3.0
All Red
0.0
0.0
2.0
0.0
0.0
2.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 372
3433
0.74
0.11
59.3
E
T 1416
3539
0.97
0.40
48.0
D 46.0 D
R 831
1583
0.22
0.52
11.3
B
Westbound
L 315
3433
0.82
0.09
69.5
E
T 1357
3539
0.79
0.38
33.1
C 33.6 C
R 831
1583
0.55
0.52
14.7
B
Northbound
L 458
3433
0.73
0.13
55.9
E
TR 982
3367
0.99
0.29
67.1
E 64.2 E
Southbound
L 515 3433 0.91 0.15 70.6 E
T 1091 3539 0.39 0.31 32.1 C 43.9 D
R 712 1583 0.43 0.45 19.3 B
Intersection Delay = 45.8 (sec/veh) Intersection LOS = D
M
APPENDIX C
I?
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/2/2004
Analysis Time Period: am(o
Intersection: Harmony/Mobile Home Park
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: recent shor bkgr total
Project ID: 0363me07
East/West Street: Harmony Road
North/South Street: Mobile Home Park
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
110
1545
20
1990 35
Peak -Hour Factor, PHF.
0.91
0.91
0.85
0.90 0.90
Hourly Flow Rate, HFR
120
1697
23
2211 38
Percent Heavy Vehicles
0
--
--
�- --
Median Type/Storage
TWLTL
/ 3
RT Channelized?
No
No
Lanes
1
2 1
2 1
Configuration
L
T; R
T R
Upstream Signal?
Yes
Yes
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume
10
10
75
Peak Hour Factor, PHF
0.85
0.85
0.85
Hourly Flow Rate, HFR
11
11
88..
Percent Heavy Vehicles
0
0 -
0
Percent Grade (%) 0
0
Flared Approach: Exists?/Storage
Lanes
1
1
1
Configuration
R
L
R
Approach
Movement
Lane Config
v (vph)
C (m) (vph)
v/c
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
Delay, Queue Length, and Level of Service
EB WB Northbound Southbound
1 4 1 7 8 9 I 10_ 11 12
L I R I L R
120
11
11
88
240
628
83
475
0.50
0.02
0.13
0.19
2.56
0.05
0.44
0.67
34.1
10.8
54.9
14.3
D
B
F.
B
10.8
18.8
B
C
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst:
Michael
Agency/Co.:
Matthew J. Delich, P.E.
Date Performed:
Analysis Time Period:
2/2004
am pm
Intersection:
rmony/Mobile Home Park
Jurisdiction:
Fort Collins
Units: U. S. Customary
Analysis Year:
recen short bkgrd total
Project ID: 0363me07
East/West Street:
Harmony Road
North/South Street: Mobile Home Park
Intersection Orientation: EW Study period (hrs): 0.25
Major Street:
Vehicle Volumes and Adjustments
Approach Eastbound Westbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
50
1820
35
1365
15
Peak -Hour Factor, PHF
0.96
0.96
0.85
0.86
0.86
Hourly Flow Rate, HFR
52
1895
41
1587
17
Percent Heavy Vehicles
0
--
--
--
--
Median Type/Storage
TWLTL
/ 3
RT Channelized?
No
No
Lanes
1
2 1
2 1
Configuration
L
T R
T R
Upstream Signal?
Yes
Yes
Minor Street: Approach
Northbound
Southbound
Movement
7
8
9
I 10 11
12
L
T
R
I L T
R
Volume
5
40
120
Peak Hour Factor, PHF
0.85
0.85
0.85
Hourly Flow Rate, HFR
5
47_
141
Percent Heavy Vehicles
2
0
0
Percent Grade M 0
0
Flared Approach: Exists?/Storage
Lanes
1
1
1
Configuration
R
L
R
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 1 7 8 9 10 11 12
Lane Config L I R I L R
v (vph)
52
5
47
141
C(m) (vph)
465
594
159
742
v/c
0.11
0.01
0.30
0.19
95% queue length
0.38
0.03
1.16
0.70
Control Delay
13.7
11.1
36.9
11.0
LOS
B
B
E
B
Approach Delay
11.1
17.5
Approach LOS
B
C
• HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2 2/2004
Analysis Time Period:
Intersection: armony/RT Access
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: recent short bkgrd total
Project ID: 0363me07
East/West Street: Harmony Road
North/South Street: RT Access
Intersection Orientation: EW Study period (hrs): 0.25
Major Street:
Vehicle Volumes and Adjustments
Approach Eastbound Westbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
Peak -Hour Factor, PHF'
Hourly Flow Rate, HFR.
Percent Heavy Vehicles
Median Type/Storage
RT Channelized?
Lanes
Configuration .
Upstream Signal?
1615 50
0.91 0.91
1774 54
Undivided /
No
2 1
T R
Yes No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 ( 10 11 12
L T R I L T R
Volume 60
Peak Hour Factor, PHF 0.85
Hourly Flow Rate, HER 70
Percent Heavy Vehicles 2
Percent Grade M 0 0
Flared Approach: Exists?/Storage
Lanes 1
Configuration R
Delay, Queue Length, and Level of Service
Approach EB WB Northbound
Movement 1 4 1 7 8 9 I 10
Lane Config I R I
v (vph)
C (m) (vph)
v/c
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
11.7
B
70
610
0.11
0.39
11.7
B
Southbound
11 12
14
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2 2/2004
Analysis Time Period: am pm
Intersection: armony/RT Access
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: recent shor bkgr total
Project ID: 0363me07
East/West Street: Harmony Road
North/South Street: RT Access
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume 1890 70
Peak -Hour Factor, PHF 0.96 0.95
Hourly Flow Rate, HFR 1968 73
Percent Heavy Vehicles -- -- -- --
Median Type/Storage Undivided /
RT Channelized? No
Lanes 2 1
Configuration T R
Upstream Signal? Yes No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 1 10 11 12
L T R 1 L T R
Volume 15
Peak Hour Factor, PHF 0.85
Hourly Flow Rate, HFR 17
Percent Heavy Vehicles 2
Percent Grade (o) 0
Flared Approach: Exists?/Storage
Lanes 1
Configuration R
Approach
Movement
Lane Config
v (vph)
C(m) (vph)
v/c
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
0
Delay, Queue Length,, and Level"af Service
EB WB Northbound Southbound
1 4 1 7 8 9 1 10 11 12
1 R I
17
606
.0.03
0.09
11.1
B
11.1
B
)3
HCS2000: Signalized Intersections Release 4.1d
Analyst: Michael Inter.: Timberline/Timberwood
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 8/22/03 Jurisd: Fort Collins
Period: am� Year recent hor blcgr total
Project ID: 0363me07
E/W St: Timberwood Drive N/S St: Timberline Road
SIGNALIZED INTERSECTION SUMMARY
► Eastbound ► Westbound I Northbound ► Southbound
I L T R I L T R I L T R I L T R
I I I I
No. Lanes I 2 1 1 ► 1 1 1 I 1 2 1 ► 2 2 1
LGConfig I L T R► L T R I L T R I L T R
Volume 1185 5 40 175 10 265 145 . 625 20 175 930 145
Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0
RTOR Vol 1 0 1 0 1 0 1 0
Duration 0.25 Area Type: All other areas
_ Signal Operations
Phase Combination 1 2 3 4 i 5 6 7 8
EB Left A A I NB Left A
Thru A A I Thru P
Right A A I Right P
Peds X I Peds
WB Left A I SB Left A A
Thru A ► Thru A P
Right A I Right A P
Peds X I Peds X
NB Right A I EB Right A
SB Right A A ► WB Right A A
Green 8.0 4.0 16.0 8.0 4.0 50.0
Yellow 0.0 0.0 3.0 0.0 0.0 3.0
All Red 0.0 0.0 2.0 0.0 0.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 446
3433
0.49
T 373
1863
0.02
R 522
1583
0.09
Westbound
L 159
1770
0.55
T 298
1863
0.04
R 522
1583
0.60
Northbound
L 159
1770
0'.33
T 1770
3539
0.41
R 997
1583
0.02
Southbound
L 446
3433
0.20
T 1911
3539
0.57
R 1124
1583
0.15
Intersection
Delay
= 21.2
0.13
41.3
D
0.20
32.1
C
37.9
D
0.33
23.2
C
0.09
47.7
D
0.16
35.6
D
33.8
C
0.33
29.8
C
0.09
43.9
D
0.50
16.4
B
17.9
B
0.63
7.0
A
0.13
39.0
D
0.54
15.6
B
15.8
B
0.71
4.8
A
(sec/veh)
Intersection
LOS = C
IZ
HCS2000: Signalized Intersections Release 4.1d
Analyst: Michael Inter.: Timberline/Timberwood
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 8/22/03 Jurisd: Fort Collins
Period: am m Year recent short kgrd total
Project 0363me07
E/W St: Timberwood Drive N/S St: Timberline Road
SIGNALIZED INTERSECTION SUMMARY
I Eastbound I Westbound I Northbound I Southbound 1
I L T R I L T R I L T R I L T R 1
I I I I I
No. Lanes I 2 1 1 I 1 1 1 1 1 2 1 I 2 2 1 1
LGConfig I L T R I L T R I L T R I L T R 1
Volume 1160 10 25 120 0 65 145 970 80 1215 500 55 1
Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 1
RTOR Vol I 0 I 0 I 0 I 0 I
Duration 0.25 Area Type: All other areas
_ Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A A I NB Left A
Thru A A 1 Thru P
Right A A I Right P
Peds X I Peds
WB Left A I SB Left A A
Thru A I Thru A P
Right A I Right A P
Peds X I Peds. X
NB Right A I EB Right A
SB Right A A 1 WB Right A A
Green 8.0 4.0 16.0 8.0 4.0 50.0
Yellow 0.0 0.0 3.0 0..0 0.0 3.0
All Red 0.0 0.0 2.0 0.0 0.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) V/c g/C Delay LOS Delay LOS
Eastbound
L 446 3433 0.42 0.13 40.7 D
T 373 1863 0.03 0.20 32.2 C 38.0 D
R 522 1583 0.06 0.33 22.9 C
Westbound
L 159 1770 0.15 0.09 42.4 D
T 298 1863 0.00 0.16 35.3 D 28.2 C
R 522 1583 0.15 0.33 23.7 C
Northbound
L 159 1770 0.33 0.09 43.9 D
T 1770 3539 0.64 0.50 20.3 C 20.3 C
R 997 1583 0.09 0.63 7.3 A
Southbound
L 446 3433 0.56 0.13 42.4 D
T 1911 3539 0.30 0.54 12.7 B 20.4 C
R 1124 1583 0.06 0.71 4.4 A
Intersection Delay = 22.3 (sec/veh) Intersection LOS = C
HCS2000: Signalized Intersections Release 4.1d
Analyst: Michael Inter.: Timberline/Harmony
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 8/22/03 Jurisd: Fort Collins
Period: am pm Year recent shor kgrd total
Project ID: 0363me07
E/W St: Harmony Road N/S St: Timberline Road
SIGNALIZED INTERSECTION.SUMMARY
I Eastbound I Westbound I Northbound I Southbound
I L T R I L T R I L T R I L T R
I I I I
No. Lanes 1 2 2 1 1 2 2 1 1 2 2 0 I 2 2 1
LGConfig I L T R I L T R I L TR I L T R
Volume 1340 1210 240 1290 1460 355 1395 560 120 1335 645 525
Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 12.0
RTOR Vol I 0 1 0 1. 0 1 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A 1 NB Left A
Thru A P 1 Thru A A
Right A P 1 Right A A
Peds X X 1 Peds X X
WB Left A 1 SB Left A
Thru P A I Thru A A
Right P A I Right A A
Peds X X 1 Peds X X
NB Right i EB Right A
SB Right A 1 WB Right A
Green 15.0 36.0 16.0 16.0 12.0 15.0
Yellow 0.0 0.0 3.0 0.0 0.0 3.0
All Red 0.0 0.0 2.0 0.0 0.0 2.0
Cycle Length: 120.0
Intersection Performance Summary
Appr/' Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 458
3433
.0.84
0.13
64.1
E
T 1504
3539
0.91
0.43
37.1
D 38.5 D
R 884
1583
0.31
0.56
9.6
A
Westbound
L 486
3433
0.64
0.14
51.3
D
T 1534
3539
1.01
0.43
55.2
E 47.1 D
R 884
1583
0.43
0.56
10.6
B
Northbound
L 486
3433
0.88
0.14
67.7
E
TR 804
3446
0.92
0.23
60.5
E 63.1 E
Southbound
L 458 3433 0.79 . 0.13 59.8 E
T 796 3539 0.88 0.22 56.2 E 55.0+ E
R 620 1583 0.92 0.39 50.6 D
Intersection Delay = 49.1 (sec/veh) Intersection LOS = D
secs
10
HC'52000: Signalized Intersections Release 4.1d
Analyst: Michael Inter.: Timberline/Harmony
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 8/22/03 Jurisd: Fort Collins
Period: pm Year recent hor bkgrd total
Project D: 0363me07
E/W St: Harmony Road N/S St: Timberline Road
SIGNALIZED INTERSECTION SUMMARY
I Eastbound I Westbound I Northbound 1 Southbound 1
I L T R I L T R I L T R I L T R 1
I I I I I
No. Lanes I 2 2 1 1 2 2 1 1 2 2 0 i 2 2 1 1
LGConfig I L. T R I L T R I L TR 1 L T R
Volume 1260 1255 175 1200 910 390 1305 605 285 1420 405 295 I
Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 12.0 I
RTOR Vol I 0 I 0 I 0 I 0 i
Duration 0.25
Phase Combination 1
EB Left A
Thru A
Right A
Peds X
WB Left
Thru
Right
Peds
NB Right
Area
Type: All
other areas
Signal
Operations
2
3 4
1
5
6
7 8
1 NB Left
A
P
I Thru
A
A
P
I Right
A
A
X
I Peds
X
X
A
I SB Left
A
P
A
1 Thru
A
A
P
A
1 Right
A
A
X
X
i Peds
X
X
i EB Right
A.
SB Right
A
I WB
Right
A
Green
12.0 36.0
10.0
15.0
20.0
17.0
Yellow
0.0 0.0
3.0
0.0
0.0
3.0
All Red
0.0 0.0
2.0
0.0
0.0
2.0
Cycle
Length: 120.0 secs
Intersection
Performance
Summary
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L 372
3433
0.74
0.11
59.3
E
T 1416
3539
0.93
0.40
42.3
D
41.7
D
R 831
1583
0.22
0.52
11.3
B
Westbound
L 315
3433
0.75
0.09
62.5
E
T 1357
3539
0.79
0.38
33.1
C
32.2
C
R 831
1583
0.55
0.52
14.7
B
Northbound
L 458
3433
0.71
0.13
54.7
D
TR 983
3369
0.96.
0.29
61.9
E
60.1
E
Southbound
L 515 3433 0.85 0.15 62.5 E
T 1091 3539 0.39 0.31 32.1 C 40.1 D
R 712 1583 0.43 0.45 19.3 B
Intersection Delay = 42.5 (sec/veh) Intersection LOS = D
APPENDIX B
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/2/2004
Analysis Time Period: am pm
Intersection: Harmony/Mobile Home Park
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: ecen short bkgrd total
Project ID: 0363me06
East/West Street: Harmony Road
North/South Street: Mobile Home Park
Intersection Orientation: EW Study period (hrs)
Major Street:
_ Vehicle Volumes and Adjustments
Approach Eastbound Westbound
Movement 1 2 3 I 4, 5
L T R I L T
6
R
0.25
Volume
110
1435
1760 35
Peak -Hour Factor, PHF
0.91
0.91
0.90 0.90
Hourly Flow Rate, HFR
120
1576
1955 38
Percent Heavy Vehicles
0
-- --
-- --
Median Type/Storage
TWLTL
/ 3
RT Channelized?
No
Lanes
1
2
2 1
Configuration
L
T
T R
Upstream Signal?
Yes
Yes
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 10 75
Peak Hour Factor, PHF 0.85 0.85
Hourly Flow Rate, HFR 11 88
Percent Heavy Vehicles 0 0
Percent Grade (o) 0 0
Flared Approach: Exists?/Storage
Lanes 1 1
Configuration L R
Delay,
Queue Length, and Level of Service.
Approach
EB
WB Northbound Southbound
Movement
1
4 1 7 8 9 I 10 11
12
Lane Config
L
I I L
R
v (vph)
120
11
88
C(m) (vph)
320
133
647
v/c
0.38
0.08
0.14
95% queue length
1.69
0.27
0.47
Control Delay
22.8
34.5
11.4
LOS
C
D
B
Approach Delay
14.0
Approach LOS
B
3
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/2/2004
Analysis Time Period: am pm
Intersection: Harmony/Mobile Home Park
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: recent short bkgrd total
Project ID: 0363me06
East/West Street: Harmony Road
North/South Street: Mobile Home Park
Intersection Orientation: EW Study period (hrs)
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 1 4 5
L T R I L T
6
R
0.25
Volume
50
1535
1345
15
Peak -Hour Factor, PHF
0.96
0.96
0.86
0.86
Hourly Flow Rate, HFR
52
1598
1563
17
Percent Heavy Vehicles
0
-- --
--
--
Median Type/Storage
TWLTL
/ 3
RT Channelized?
No
Lanes
1
2
2 1
Configuration
L
T
T R
Upstream Signal?
Yes
Yes
Minor Street: Approach
Northbound
Southbound
Movement
7
8 9
I 10
11
12
L
T R
I L
T
R
Volume
40
120
Peak Hour Factor, PHF
0.85
0.85
Hourly Flow Rate, HFR
47
141
Percent Heavy Vehicles
0
0
Percent Grade M
0
0
Flared Approach: Exists?/Storage
Lanes
1 1
Configuration
L R
Approach
Movement
Lane Config
v (vph)
C (m) (vph)
v/c
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
Delay, Queue Length, and Level of Service
EB WB Northbound Southbound
1 4 i 7 8 9 I 10 11 12
L I I L R
52
47
141
462
191
629
0.11
0.25
0.22
0.38
0.93
0.85
13.8
29.9
12.4
B
D
B
16.8
C
HCS2000: Signalized Intersections Release 4.1d
Analyst: Michael Inter.: Timberline/Timberwood
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 8/22/03 Jurisd: Fort Collins
Period: am(�o Year recent short bkgrd total
Project ID: 0363me06
E/W St: Timberwood Drive N/S St: Timberline Road
SIGNALIZED INTERSECTION SUMMARY
I Eastbound 1 Westbound I Northbound I Southbound 1
L T R I L T R I L T R I L T R 1
I I I I I
No. Lanes 1 2 1 1 I 1 1 1 1 1 2 1 1 2 2 1 1
LGConfig I L T R I L T R I L T R I L T R 1
Volume 1180 5 35 165 10 230 140 605 15 170 825 140 1
Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 1
RTOR Vol 1 0 1 0 1 0 1 0 I
Duration 0.25
Area
Type: All
other areas
Signal
Operations_
Phase Combination 1
2
3 4
1
EB Left A
A
1 NB Left
Thru
A
A
1 Thru
Right
A
A
1 Right
Peds
X
1 Peds
WB Left A
1 SB Left
Thru
A
1 Thru
Right
A
1 Right
Peds
X
I Peds
5 6
A
A A
A
A
7 8
P
P
P
P
X
NB Right
A
I EB Right A
SB Right
A
A
I WB Right A
A
Green
8.0
4.0 16.0
8.0
4.0 50.0
Yellow
0.0
0.0 3.0
0.0
0.0 3.0
All Red
0.0
0.0 2.0
0.0
0.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/
Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane
Group
Flow Rate
Grp
Capacity
(s)
v/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L
446
3433
0.48
0.13
41.1
D
T
373
1863
0.02
0.20
32.1
C
38.1
D
R
522
1583
0.08
0.33
23.1
C
Westbound
L
159
1770
0.48
0.09
45.5
D
T
298
1863
0.04
0.16
35.6
D
32.0
C
R
522
1583
0.52
0.33
28.0
C
Northbound
L
159.
1770
0.29
0.09
43.5
D
T
1770
3539
0.39
0.50
16.2
B
17.7
B
R
997
1583
0.02
0.63
6.9
A
Southbound
L
446
3433
0.18
0.13
39.0
D
T
1911
3539
0.50
0.54
14.7
B
15.0
B
R
1124
1583
0.15
0.71
4.7
A
Intersection
Delay
= 20.5
(sec/veh)
Intersection
LOS = C
HCS2000: Signalized Intersections Release 4.1d
Analyst: Michael Inter.: Timberline/Timberwood
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 8/22/03 Jurisd: Fort Collins
Period am pm Year ecent short bkgrd total
Project ID: 0363me06
E/W St: Timberwood Drive N/S St: Timberline Road
SIGNALIZED INTERSECTION SUMMARY
I Eastbound ( Westbound I Northbound I Southbound
L T R I L T R I L T R I L T R
I I I I
No. Lanes I 2 1 1 I 1 1 1 I 1 2 1 I 2 2 1
LGConfig I L T R I L T R I L T R I L T R
Volume 1155 10 20 115 0 55 140 845 75 1210 420 50
Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0
RTOR Vol 1 0 1 0 1 0 1 0
Duration 0.2
Phase Combination 1
EB Left A
Thru
Right
Peds
WB Left A
Thru
Right
Peds
Area
Type: All
other areas
Signal
Operations_
2
3
4 I
A
I NB Left
A
A
I Thru
A
A
I Right
X
I Peds
I SB Left
A
I Thru
A
I Right
X
I Peds
5 6
A
A A
A
A
7 8
P
P
X
NB Right
A
I EB Right A
SB Right
A
A
I WB Right A
A
Green
8.0
4.0 16.0
8.0
4.0 50.0
Yellow
0.0
0.0 3.0
0.0
0.0 3.0
All Red
0.0
0.0 2.0
0.0
0.0 2.0
Appr/ Lane
Lane Group
Grp Capacity
Cycle Length: 100.0
_Intersection Performance Summary
Adj Sat Ratios Lane Group Approach
Flow Rate _
(s) V/c g/C Delay LOS Delay LOS
Eastbound
L 446
3433
0.41
T 373
1863
0.03
R 522
1583
0.05
Westbound
L 159
1770
0.11
T 298
1863,
0.00
R 522
1583
0.12
Northbound
L 159
1770
0.30
T 1770
3539
0.56
R 997
1583
0.09
Southbound
L 446
3433
0.55
T 1911
3539
0.26
R 1124
1583
0.05
Intersection
Delay
= 21.8
0.13
40.6
D
0.20
32.2
C
38.2
D
0.33
22.8
C
0.09
42.1
D
0.16
35.3
D
27.6
C
0.33
23.5
C
0.09
43.6
D
0.50
18.7
B
18.8
B
0.63
7.3
A
0.13
42.2
D
0.54
12.3
B
21.0
C
0.71
4.4
A'
(sec/veh)
Intersection
LOS = C
secs
0
• I HCS2000: Signalized Intersections Release 4.1d
Analyst: Michael Inter.: Timberline/Harmony
Agency: Matthew J. Delich,.P.E. Area Type: All other areas
Date: 8/22/03 Jurisd: Fort Collins
Period• am �m Year ecent short bkgrd total
Project ID. 363me06
E/W St: Harmony Road N/S St: Timberline Road
SIGNALIZED INTERSECTION SUMMARY
I Eastbound I Westbound I Northbound I Southbound
L T R I L T R I L T R I L T R
I I i I
No. Lanes I 2 2 1 I 2 2 1 i 2 2 0 I 2 2 1
LGConfig I L T R I L T R I L TR I L T R
Volume 1330 1175 190 1245 1280 305 1360 570 85 1275 625 450
Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 12.0
RTOR Vol I 0 I 0 I 0 1 0
Duration 0.25
Area
Type: All
other areas
Signal
Operations
Phase Combination
1
2
3 4
1
5
6
7 8
EB Left
A
I NB Left
A
Thru
A
P
I Thru
A
A
Right
A
P
I Right
A
A
Peds
X
X
I Peds
X
X
WB Left
A
I SB Left
A
Thru
P
A
I Thru
A
A
Right
P
A
I Right
A.
A
Peds
X
X
I Peds
X
X
NB Right
I EB Right
A
SB Right
A
I WB
Right
A
Green
14.0 26.0
13.0
14.0
12.0 11.0
Yellow
0.0 0.0
3.0
0.0
0.0 3.0
All Red
0.0 0.0
2.0
0.0
0.0 2.0
Cycle
Length: 100.0 secs
Intersection
Performance
Summary
Appr/
Lane
Adj Sat
Ratios
Lane Group
Approach
Lane
Group
Flow Rate
Grp
Capacity'
(s)
v/c g/C
Delay LOS
Delay LOS
Eastbound
L 515
3433
0.73
0.15
45.7
D
T 1416
3539
0.94
0.40
41.7
D 39.2 D
R 855
1583
0.25
0.54
12.4
B
Westbound
L 481
3433
0.54
0.14
41.3
D
T 1380
3539
0.99
0.39
51.3
D 44.1 D
R 792
1583
0.41
0.50
16.1
B
Northbound
L 515
3433
0.76
0.15
47.3
D
TR 902
3471
0.79
0.26
39.2
D 42.1 D
Southbound
L 412 3433 0.73 0.12 48.7 D
T 814 3539 0.83 0.23 44.2 D 39.9 D
R 665 1583 0.74 0.42 28.6 C
Intersection Delay = 41.3 (sec/veh) Intersection LOS = D
3
0
HCS2000: Signalized Intersections Release 4.1d
Analyst: Michael Inter.: Timberline/Harmony
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date 2/03 Jurisd: Fort Collins
Period am pm Year ecent short bkgrd total
Project 0363me06
E/W St: Harmony Road N/S St: Timberline Road
SIGNALIZED INTERSECTION SUMMARY
Eastbound I Westbound I Northbound I Southbound
L T R I L T R I L T R I L T R
I I I I
No. Lanes I 2 2 1 I 2 2 1 I 2 2 0 1 2 2 .1
LGConfig I L T R I L T R I L TR I L T R
Volume 1240 1045 125 1170 895 400 1265 540 250 1345 395 385
Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12..0 112.0 12.0 12.0
RTOR Vol 1 0 1 .0 I 0 1 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A I NB Left A
Thru A P I Thru A A
Right A P I Right A A
Peds X X I Peds X X
WB Left A I SB Left A
Thru P A 1 Thru A A"
Right P A I Right A A
Peds X X I Peds X X
NB Right I EB Right A
SB Right A I WB .Right A
Green 14.0 24.0 12.0 14.0 14.0 12.0
Yellow 0.0 0.0 3.0 0.0 0.0 3.0
All Red 0.0 0.0 2.0 0.0 0.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS.
Eastbound
L 515
3433
0.49
0.15
39.7
D
T 1345
3539
0.82
0.38
32.0
C 31.6 C
R 823
1583
0.16
0.52
12.7
B
Westbound
L 446
3433
0.45
0.13
40.9
D
T 1274
3539
0.83
0.36
33.8
C 31.1 C
R 760
1583
0.62
0.48
20.8
C
Northbound
L 515
3433
0.55
0.15
40.6
D
TR 944
3371
0.89
0.28
45.0
D 43.9 D
Southbound
L 446 3433 0.80 0.13 52.6 D
T 920 3539 0.45 0.26 31.3 C 34.4 C
R 712 1583 0.560.45 21.3 C
Intersection Delay = 34.5 (sec/veh) Intersection LOS = C
2
APPENDIX A
TABLE 2
Short Range (2006) Background Peak Hour Operation
'^
... ,. s Y .4 % r S`v
.. .. - ,.v
Movemerrt
^t• F rat n Y19
r`.' g 5s �af r§ F.,
a 44
EB
D
D
Harmony/Timberline
(signal)
WB
C
DNB
E
E
SB
D
E
OVERALL
D
D
EB
D
D
WB
C
CNB
Timberline/Timberwood
(signal)
C
B
SB
C
B
OVERALL
C
C
Harmony/RT Access
(RT-in/RT-out)
NB RT
B
B
NB RT
B
B
Harmony/Mobile Home Park
(stop sign)
SB LT
E
FSB
RT
B
B
SB APPROACH
C
C
EB LT
B
D
TABLE 3
Short Range (2006) Total Peak Hour Operation
•Y` F '� t0.�i 9':'+Ai �°� � .�-E'��
.. Frry.i f r1eG"Mt FJ �t p tl i ...� tirta ;
'� �/f� Y tub?;, f {¢-h •c,
/•ti'�j'Y `' -{.'i 1^'
4 Yt#m4F'VU« • e-�` r
XH .w^ if1C17r c
['y,TilnCT'�A.G"v� ..i. e. Tvy�
dN'4-VI�`^'Y"%e y�.e
q ai �' --c � {�
cYwY L�.�YX .. k `w`
Y 'X c
MD
EB
D
WB
C
DNB
Harmony/Timberline
(signal)
E
E
SB
D
E
OVERALL
D
D
EB
D
D
WB
C
DNB
Timberline/Timberwood
(signal)
C
B
SB
C
B
OVERALL
C
C
Harmony/RT Access
(RT-in/RT-out)
NB RT
B
B
NB RT
B
B
SB LT
E
FSB
Harmony/Mobile Home Park
(stop sign)
RT
B
B
SB APPROACH
C
C
EB LT
B
D
E
ul)LOU')
LO CD M
F-
390/355
c LO
"' v 'Cr
�- 910/1460
220/300
260/340
1
1300/1235 —
175/240
In LO tn
rn N
v T
rn
C7'CO CV
O
Cr CD CO
LOo M 85/350
LO LO 04
f 25/95
0110
1890/1615
155/100 - y
o
LO
T
160/185 �
11
t
Timberwood
r
10/5
LO
o
,n
25/40
Ul
o
rn
w
rn
SHORT RANGE (2006) TOTAL
PEAK HOUR TRAFFIC
Lo
T
_JN_ Ol-
f
Harmony
50/110
1820/1545
35/20
f- AM/PM
Rounded to Nearest
5 Vehicles
15/35
1365/1990
Figure 4
t I
E
ln LOI-T 0
rn o N 390/355
cli `r v f- 910/1460
200/290
260/340 1
1255/1210 I I I
175/240 0 'LOr
0 0 0000
M cD N
0
v rn U') `
oo `— 65/265
`In to N
20/75
1890/1615
70/50
0
LO
T
160/185
�*,
t
Timberwood
r
10/5 —
to
LO
C
25/40
L
o
4
o
co
rn
N
N
0)
8
Q
F-
w
SHORT RANGE (2006) BACKGROUND
PEAK HOUR TRAFFIC
u�
0
T
-JN_ Ol-
Harmony
50/110
1820/1545 —
35/20 — y
-f AM/PM
Rounded to Nearest
5 Vehicles
MM
15/35
-t- 1365/1990
r
0
Lo
c0
w
(D
3
O
c
U)
Figure 3
TABLE 1
Current Peak Hour Operation
:} +xM h4 x t {, .. °2�` ��t s rn 4 yid„ Ni
1"1 ry_y.:•rf b4NfJ�fY ����R �Y °ail jxl ��ln
a i t "'rf t - "S, •,r ,y tri MYro t
�'I SSA'^1�S�tI1'\��I14� �'\1�1jY
. j5"^ 1iT i -e nr—
.k�'�,ii,T.3�j � �T tflFri 4
^i
58PIM4 ' )H
J.rS yy'�„f.� \''� , J`tihn�;
h
Harmony/Timberline
(signal)
EB
C
D
WB
C
D
NB
D
D
SB
C
D
OVERALL
C
D
Timberline/Timberwood
(signal)
EB
D
D
WB
C
C
NB
B
B
SB
C
B
OVERALL
C
C
Harmony/Mobile Home Park
(stop sign)
SB LT
D
D
SB RT
B
B
SB APPROACH
C
B
EB LT
B
C
c
m
_E-
H
o Ln Ln
LE) N r� `
__
LB rn v `C 400/305
`') " " f- 895/1280
170/245
240/330 --)� ) f
1045/1175 —► o o LO
125/190 a 'aCEO T N
N LO
LO
Ott co O `o N 55/230
"' v N f 0/10
15/65
155/180
'**,
f
r Timberwood
10/5 -;
o
in
LO
20/35 —y
o
co
RECENT BALANCED
PEAK HOUR TRAFFIC
0
J_N O
f
Harmony
50/110
1535/1435 -
�w AM/PM
Rounded to Nearest
5 Vehicles
15/35
-f- 1345/1760
Figure 2
SCALE: 1'=IW
SITE PLAN
Figure 1
I; 1
The future short range analysis year was determined to be 2006.
Figure 3 shows the short range background peak hour traffic at the key
intersections. The background traffic includes development of the
Timberline Village retail center north of Harmony Road and the primary care
medical office building east of Snow Mesa Drive, but does not include
development of the Harmony Lifestyle Center. The Harmony Lifestyle Center
is not likely to be built and occupied by the year 2006. Table 2 shows the
operation at the key intersections using the traffic shown in Figure 3.
The key intersections are expected to operate acceptably. Calculation
forms are. provided in Appendix B.
Figure 4 shows the short range total peak hour traffic at the key
intersections. The site generated traffic was added to the background
traffic to develop these traffic forecasts. Table 3 shows the operation at
the key intersections using the traffic volumes shown in Figure 4.
Calculation forms are provided in Appendix C. The key intersections will
operate similarly to that shown with just the background traffic.
Discussions with City staff indicated that pedestrian connections to
the adjacent neighborhoods were important for the PVHSHC. Appendix D
contains a graphic showing the pedestrian destinations within 0.25 miles of
the proposed MOBII. There are three residential areas within 0.25 miles of
this site. The existing buildings within the PVHSHC are also within 0.25
miles of the site. The Pedestrian LOS Worksheet for the MOBII is also
provided in Appendix D. This site is in the Transit Corridor Area Type,
even though there are no current transit routes on Harmony Road. It is
also in the School Walking Area Type, even though there will be little
pedestrian affinity between schools and the MOBII. The minimum levels of
service for both of these area types are B for all factors, except for
visual interest and amenities, which is C. Some of the service factors
cannot be achieved. It is recommended that a temporary asphalt path be
constructed connecting to destination 1. Destination 2 will be connected
with completion of the loop drive. Pedestrian destination 3 will be
directly connected when Snow Mesa Drive is extended to the south. This
extension is not proposed with MOBII. Pedestrian access to/from the
Stetson Creek/Timberline Creek neighborhoods will be required to use the
sidewalk along Timberline Road. The desired pedestrian level of service
cannot be reasonably achieved for the mobile home park. The City staff
will need to grant an exception with regard to this pedestrian destination.
By definition, there is only one bicycle destination with 0.25 miles
of the MOBII. This is the Traut Core Knowledge School. However, there
will be little affinity between the MOBII and the school. When the
recommended temporary asphalt path is built between Timberwood Drive and
the MOBII, bicyclists will be able to utilize this facility. It should be
wide enough to accommodate pedestrians and bikes. The Bicycle LOS
Worksheet is provided in Appendix D.
There is no existing transit service within one mile of this site.
When transit service is introduced to the Harmony Road Corridor, patrons
will be able to use the transit stop built with the existing portion of the
PVHSHC.
M ram. V 9 T i \r_ j4
co
FE
oTO:
Dean Barber, McWhinney Real Estate Services ,'\^"; `, �`�i
�v
Co
cri
Angie Milewski, BHA Design 1-"
Jim Allen -Morley, Sear -Brown GroupLO
o
mac'
City of Fort Collins t`2^co
e
o
FROM: Matt Delich
o
U
rn
�o... o^` �G�• .
�`c�r+��
DATE: March 30, 2009
0
a
LL
SUBJECT: Poudre Valley Health System Harmony Campus, Medical
LU
Office Building II transportation impact study
J
(File: 0363ME07)
•
r
CO
w
>_
N
Medical office building II (MOBII) has been proposed on the
0
cCo
Poudre Valley Health System Harmony Campus (PVHSHC). It will be
located east of the existing buildings on the PVHSHC. The site plan
W
o
is shown in Figure 1. The private loop drive is intended to be
_
rn
extended to Snow Mesa Drive. A portion of Snow Mesa Drive will be
w
z
built south of Harmony Road. A scoping conversation was held with
o
Eric Bracke, Fort Collins Traffic Engineer, when the Primary Care
N
a
Medical Office Building was proposed a number of weeks ago. This
N
proposal was presented to the Fort Collins engineering and planning
N
staff. There will be on -going discussions regarding the access to
Harmony Road. Given all of the previous information provided
regarding the PVHSHC and that this building is part of the overall
campus plan, it was assumed that a similar technical memorandum would
address the transportation issue with regard to MOBII.
The proposed MOBII will be 55,904 square feet. Using Trip
Generation, 7th Edition, ITE, this building is expected to generate
approximately 2070 average daily trip ends, 139 morning peak hour
trip ends, and 183 afternoon peak hour trip ends. Based upon current
traffic counts and review of previous transportation studies for the
PVHSHC, the trip distribution is expected to be 40% to/from the west,
Uj
30% to/from the north, 15% to/from the east, and 15% to/from the
Q.
south.
z
gW
Figure 2 shows recent balanced counts at key intersection in
z
the area. Most of these traffic counts were obtained in late 2003.
V
z
The balancing occurred due to traffic counts being obtained on
JW
different days. Table 1 shows the current operation at the key
W
o
intersections. Calculation forms are provided in Appendix A. The
0
0
key intersections operate acceptably. A description of level of
service and the Fort Collins intersection operation criteria are also
a
provided in Appendix A.
7
w
`
Q
Discussions with City staff indicated that if a signal were not
5
warranted at the Harmony/Mobile Home Park/Snow Mesa intersection, the
W
,d
south leg would not be connected to Harmony Road, unless a design
c)
could be presented which assured limited access on the south leg.
LL
Sear -Brown has designed an access that will restrict the south leg
a
(Snow Mesa Drive) to right-in/right-out traffic movements.
a
F-
Therefore, the traffic assignment of the site generated traffic was
C
performed with this constraint.