Loading...
HomeMy WebLinkAboutUNIVERSITY CENTER PUD (UNIVERSITY MALL REDEVELOPMENT) - FINAL - 2-96A - CORRESPONDENCE - STAFF'S PROJECT COMMENTSJAN. -F' 98MD1 16:27 DPC COMPANIES TEL:303 796 8388 P. 004 We appreciate your meeting with us to address these issues prior to resubmitting the Development Plan. Our Architect, Jim Webber, our Site Engineer, Andy Walsh and myself will be in attendance to resolve the difficulties facing this redevelopment. Sincerely, y h Anthony P. Kill Project Manager APK/jts I:\DATAIWPDArAVnkUNIVMALW01.T.I: iR JAN. -0 ' 98(WED) 16 2DPC COMPANIES TEL:303 7196 8388 P. 003 our development and our neighbors to the south. Water/Waste Water F-ory Re-laying of C900 PCV pipe, When will we know how much the city will participate in regard to cost? Forestry Tum Regarding the relocation of existing trees, we have observed that the trees along the front of the mall have grown so much that they are now too close to the building and are in very poor condition. We feel relocation is necessary to preserve these trees. • i • e I trritiir Compliance with energy code and compliance with all new codes. • Building is existing, so is there any flexibility on this point? Bringing the old construction up to all new codes may not be feasible, specifically the new energy code. mapping Item 11 - A distance and bearing along the north property line locates this easement traversed around the site. Storm water Utility Matt'/ t/&eAA • Items 13a, b, and c - Please clarify your concerns regarding these items. • Item 2, Nov. 11, 1997 memo - General questions regarding City drainage requirements need to be clarified before our response can be completed. • Item, Nov. 11, 1997 memo- Due to the design of the loading ramps being below grade and the lack of slope on the site, sump pumps are required to pump water from the base of the ramp up to the detention pond. We would like to discuss a variance on this matter. Engineering G/lreei�r In regards to the plat, are the shaded areas near the southwest and southeast of the property ROW? If so, does the City have any interest in these easements? Water & Wastewater Please clarify the co ment "double services and fire lines are not permitted." JAN. -07' 98(WED) 16:27 DPC January 7, 1998 DPC COMPANIES 1DF V IELQPMn1-ZT C(7)1ViPA1VY TEL:303 796 8388 P.002 Mr. Steve Olt VIA FACSIMILE Ft. Collins Planning 1/970-416-2020 281 N. College Ave. Ft. Collins, CO 90525 RE: January 8, 1998, Meeting to Discuss Comments from First Submittal of University Mall Development flan Dear Steve: The following items are areas that we would like to discuss at our meeting tomorrow: Zoning Comment E: Zoning, Transportation and Traffic Operations have all made comments regarding the treatment of the rear of the building. More specifically, requests for rear elevations, screening of the loading areas, screening of the mechanical units and delivery access have all been commented on. It was our understanding that these issues were previously addressed by the Mulhern Group and this work would not be necessary. Please clarify your concerns regarding the rear of the existing building and discuss parameters for improvements. Comment CT: Please clarify your concerns regarding parking. The parking design we propose is the same as what is existing with a 16' wide back up space. Our experience is that retail tenants desire 5 spaces per 1000 S.F. in front of their stores and the existing parking is below this ratio. Reworking the parking lots as requested would further decrease the number of available parking spaces. Comment M: What doe.-4 the "special review" in regard to building height entail? We may want to pursue this issue. k,-au).koe*•/r-vr-d Comment 6A: No sidewalk was planned on the north side of the drive in order to savo 8 existing trees. Currently, there is a sidewallc on the south side of the main drive and another 160' to the north. Based upon the comments we have already received from forestry in opposition of relocating trees, we feel this request should be reconsidered. Comment 6C: Access to future mukiunodial transport system would require reduction in size of proposed building. This is not acceptable for our needs. Could we curate this access at the south end of the development where it would better serve 7000 EAST NELI.EVIEW AVENUE -SUITE 2909GKftNw00f) VII.I.AGE. COLORADO 80111-16220003) 796-82886PA% (30:1) 796-K3MK ��A