Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
UNIVERSITY CENTER PUD (UNIVERSITY MALL REDEVELOPMENT) - FINAL - 2-96A - SUBMITTAL DOCUMENTS - ROUND 4 - ROUTING SHEET
Project. +' ,�, u,e Planner:e u e Engineer: Traffic Operations: Date: /)- �g t Items Requested Site I land I Plat Utility I Drainage Rpt Other Items Required Engineering I x I x Redlined Items Being Returned Site land Plat Utility Drainage R t Other Items Being Returned x x Stormwater Water/Wamate x >< x Traffic Operations Trans. Planning TransMrt Natural Resources Park Planning Totals Other: Note: All redlined items should be returned with the resubmittal/ revisions. Z FILE: PROJECT PLANNER , ENGINEERING: ...WATER .-..-.-..- BUILDING INSPECTION MAPPING / DRAFTING IN m IN R.O.W. PLANNING CONSERVATION IN m PUBLIC SERVICE IN SCHOOLS: POUDRE/ THOMPSON IN STATE HIGHWAY DEPARTMENT IN DITCH COMPANY IN RAILROAD: UP or BN/CS IN 0 IN IN mom m� mmiiiimm� mmmmii i iii mom 0 mm �mmNo miiiiiiIN c�a©w©mmmomm