HomeMy WebLinkAboutBMC WEST PUD - FINAL - 1-96A - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSMay 13, 1996
Bob Davidson
1203 Cascade Court
Fort Collins, CO 80521
RE: BMC WEST PUD - Final
Dear Mr. Davidson:
At the BMC WEST PUD - Preliminary the applicant showed how they
were going to plant trees along the existing fence line on the
east side of the already developed property to the south of the
proposed development. I rode my bike there to see how this would
look and found a discrepancy. The site plan shows about twenty
to twenty-five feet between the bike path and the fence and
existing asphalt edge. In reality there is only about a ten foot
area between the path and fence. At the top of the fence they
have extended a barbed wire shelf at a 45 degree angle. To me it
looks as if trees would either grow up into the shelf or branch
across the bike path. As much as I would like to see some trees
there to screen the lumber yard, it doesn't seem possible and the
plans do not show them moving the fence and asphalt. I would
greatly appreciate your going by and looking at this before.the
Planning and Zoning Board approves something that can't be done
and therefore possibly won't be done.
I would also like you to recommend to the applicant that they use
vinyl slats along this existing stretch of fence. They have this
type of fence along the front of the existing development, facing
Prospect, and plan to do it along the new development fence line
to the east. It will look incomplete with this area left with
bare chain link. The applicant has made a lot of money here in
Fort Collins with the city growing so rapidly. I am sure they
wouldn't mind giving back to the community by helping beautify
our Spring Creek Trail with appropriate screening.
Since ely,
•
Sa ly C1 ga
1409 S. Summitview
484-9417
BMC
_ WEST PUD
' MAYOlNTHCI'ORAL M"AMONN
LI _ RNISIONS
RiyR1 a.✓v O.i.?vn �,�i. ifYi SicE E�w�ia!
gum s„a*
am vea/+c *OF
ue�xN erov
T
l�l f , � i W _.� sD,:•,-Z — � ' 11
DOC W6,51- LCIJ. F C TneEi-�JxE PMD - (ncf couJ�S� couuAm
g9m1 a1W •••c
.1111�i11111111111.:0 IS
ML ljjMj7-
®11� 1
FRONT ELEVATION
SCALE 1/9'=[ C'
RIGHT SIDE ELEVATION
R_CVISIONS•
TbA4
Apr y T -
wm v:zi+c 3 OF' 7
nR�w er•`r
REAR ELEVATION
LEFT SIDE ELEVATION
� =n
E1
RAINDANGE
LAND50APE + 1 -
IRRIGATION W
Q
.0
u
W
J
BATn NURSERi
d
�—
f
X-
Z
r
�u_uf
PLANT LIST
iceNTmc wrrt
ca«w wne
s¢e
owNTm
p.cyuY. i
I...ac M1gl.
Y c
f. fmury u..eete
tYYeub LMtm.m! 3' c/
x3
o-.. T....
^.�tl.
6MN.
LL Lotonvwt.. w�tl.w
f.kip GotomTb. 5 yY
10
Jlec vw.rv. no.uortr a. Lfip
w cw 5r.rro .w. a w
n
•• w. u.�.or»
r� +.w.
5 i
Yi •�
. .nn.N Low.
IXew
n5p r su4 OGn
Gq0 GeYr+
1 r
30
PROPOSED NATIVE
SEED MIXES
now cow+ea. n.
.eeedtm perutm .a
9.M'euast2M1
1D[ 4uii MLSWfib
xoz 5tomoe w.lutw5b
xw
rar
WA40 W5fi
uu euw
�tm� �T
PLANTING NOTES
p .l...-en.nwtmn:rtm>> sr.ww
♦r [M[.e m tMw' t.w a Iwt t. p .N e�K M. ir.. q.t.p
.0 wtn .Wle Y.w Lw.Y L.t.4'n. M Y w.W.
.IM M raM+e n tiv +tl pw t. Mtp. . Iw¢prte 6[x. e1 a0'
.nt« w .%y�ta vl: w e...o•..e w.. m ......r my ww
ryµff>wa eo.0 tlat�2JS �w e�M�n wtlmbcq.q to tl�.
w rm r �a..e. n Nmw
T M1ee+neeKeao FN. Wrt 4u .x .af BO. Ir
L nm.�.c. wro. slw um � Liwx so rt.
.eu pYl.0 5eeJ JIOK 50. .
TptLL. %GU 5fi. R.
N
SEVEN LAKES 9U5NE55 PARK P.U.D.
LEGEND
R
..r.
Fi
n.pi✓ faew4 Slut
145n OfiOY/S
6
R fagMG
xc �s
Oeu
<To ImI.Y>
eubTNc teexs
Q
o a mwvm
mLR
+fi`
U ✓I.T np.2
BMC
WEST PUD
■ Mbdbl MbWY FINAL LANDSCAPE PLAN
®RIPLEY ASSOCIATES
2CVISION5-
3-la G� (.1NT5 G.J ]L�Lv.d4 lfi�` LII G� NT5L4
Cj I wo- aLcrrtsTmnL x�*//II o LM m * o M.
sy. 06 QOF tS SLALD 1' . 90' NpliN P[dxN en Ls.
��
I'm
RANDANDE ��
I �ANascAPe . t
i4RGA'ION _� \�
a .g�
I
CACtt E POUC)Rf INDUSTRIAL PARK IUD.
v
LEVIANUFAGTURNG-
37156 SO F'. �; I
STORAGE
I
J.
LX'dTING
� ROSrEY 'IMECRLINE PU.0 FIRST /ILINC
O _ a
i rc' •
J —
BATn NURcnP-
+ GARDEN
/
OWNERSHIP CERTIFICATION
SITE PLAN NOTES
PLANNING + ZONING GERTIFICATE
VIGNITY MAP
LAMP USE STATISTICS vw s �r nR wr n
..M
SEVEN LAKES DUSNESS PARK F.UD.
rcm.aa++aa nn
ENERGY CON ERVAnON
—J I
IP
ig
ig
Q
s o
a
W
Z
J
BL m BmC
2 WEST
P CORP ip
PR
HB
RH IP
IL
RL :
IL
RLP OUT
T
VICINITY MAP 02/02/96
#1-96,,`BMC WEST PUD "
FINAL �
1"= 600'
BMC West P.U.D., Final, #1-96A
May 20, 1996 P&Z Meeting
Page 8
If the staff and the developer disagree over the provisions to be included in
the development agreement, the developer may present such dispute to the
Board for resolution if such presentation is made at the next succeeding or
second succeeding monthly meeting of the Board. The Board may table any
such decision, until both the staff and the developer have had reasonable time
to present sufficient information to the Board to enable it to make its decision.
(If the Board elects to table the decision, it shall also extend the term of this
condition until the date such decision is made).
If this condition is not met within the time established herein (or as extended,
as applicable), then the final approval of this planned unit development shall
become null and void and of no effect. The date of final approval for this
planned unit development shall be deemed to be the date that the condition
is met, for purposes of determining the vesting of rights. For purposes of
calculating the running of time for the filing of an appeal pursuant to Chapter
2, Article II, Division 3, of the City Code, the "final decision" of the Board shall
be deemed to have been made at the time of dispute is presented to the Board
for resolution regarding provisions to be included in the development
agreement, the running of time for the filing of an appeal of such "final
decision" shall be counted from the date of the Board's decision resolving
such dispute.
BMC West P.U.D., Final, #1-96A
May 20, 1996 P&Z Meeting
Page 7
required to participate at the time those improvements are constructed. The proposed
project will generate approximately 180 daily trips, 16 morning peak hour, and 18 evening
peak hour trips. Due to the very low trip generation or the proposed project, an intersection
level of service analysis was not required by the City.
8. Stormwater:
The BMC West P.U.D. meets City Stormwater Utility design requirements.
FINDINGS OF FACT/CONCLUSION:
BMC West P.U.D., Final, #1-96A meets all applicable All Development Criteria of the
Land Development Guidance System.
2. The BMC West P.U.D., Final, #1-96A is compatible with surrounding land uses.
3. The BMC West P.U.D., Final, #1-96A satisfies each of the four conditions placed
on the BMC West P.U.D., Preliminary and Final, #1-96.
4. The BMC West P.U.D., Final, #1-96A is in substantial compliance with the approved
Preliminary P.U.D.
RECOMMENDATION:
Staff recommends approval of the BMC West P.U.D., Final, #1-96A with the following
condition:
1. The Planning and Zoning Board approves this planned unit development final
plan upon the condition that the development agreement, final utility plans,
and final P.U.D., plans for the planned unit development be negotiated
between the developer and City staff and executed by the developer prior to
the second monthly meeting (July 22, 1996) of the Planning and Zoning Board
following the meeting at which this planned unit development final plan was
conditionally approved; or, if not so executed, that the developer, at said
subsequent monthly meeting, apply to the Board for an extension of time.
The Board shall not grant any such extension of time unless it shall first find
that there exists with respect to said planned unit development final plan
certain specific unique and extraordinary circumstances which require the
granting of the extension in order to prevent exceptional and unique hardship
upon the owner or developer of such property and provided that such
extension can be granted without substantial detriment to the public good.
BMC West P.U.D., Final, #1-96A
May 20, 1996 P&Z Meeting
Page 6
is placed on the western half of the property adjacent to Timberline Road. A 7,200 square
foot storage building (open to the south) and open storage for building materials are
planned on the eastern half of the site. An existing city bike path (Spring Creek Trail) runs
along the eastern edge of the property. Landscaping and fencing will screen the outside
storage from the public view.
5. Landscaping:
A combination of evergreen and deciduous trees and shrubs will be planted along the
Timberline Road frontage and in front of the office/manufacturing building. Evergreen and
deciduous trees will be planted along the north property line as required by Condition #2
of the BMC West P.U.D., Preliminary and Final, #1-96A. The landscaping combined with
berms along Timberline Road will provide adequate screening for parking areas and will
compliment the architecture of the building. A six-foot chain link fence with vinyl slats will
screen the outside storage area from the bike trail. The area between this fence and
Spring Creek and the bike path will be landscaped with native grasses and trees as
requested by the Natural Resources Department. The developer will be responsible for
the maintenance and replacement of slats as needed. The applicant has also committed
to planting landscaping along the eastern property line of the existing Prospect Timberline
P.U.D. (directly south of this project).
6. Architecture:
The entire north and west elevations and the western 70 feet (office portion) of the south
elevation of the office/manufacturing building will have a combination of china white, gull
gray, and midnight blue synthetic stucco. The roof above the office portion of the building
will have an interstate blue metal roof. The manufacturing portion of the building will have
a stone (grey) metal roof. The east elevation and the eastern 240 feet (manufacturing
portion) of the south elevation will be a stone (grey) metal siding.
7. Transportation:
BMC West will not be required to construct the ultimate street improvements along
Timberline Road at this time. It will be a part of the Development Agreement that they will
be responsible for paying for their portion of the improvements when constructed in the
future. The Developer will be providing a 36 foot wide paved surface to their driveway. At
this point in time, the status of Timberline Road is being debated. There is a question of
whether or not Timberline should be extended, what the configuration of any interim and/or
ultimate cross section will be, and the alignment this road should take. Until a design can
be completed and a commitment made as to the configuration that this road will take, it is
undesirable for BMC West to build improvements that may or may not coincide with the
future design. Therefore, instead of doing those improvements now, BMC West will be
BMC West P.U.D., Final, #1-96A
May 20, 1996 P&Z Meeting
Page 5
centered on the east and north elevations. However, at the condition imposed by
the board stated "all sides".
Staff feels that the north and west elevations are critical as they are the most visible
from the public right-of-way. The building materials used on these elevations is now
compatible with the 7 Lakes Business Park. The east elevation and the eastern 240
feet of the south elevation are to be used when moving materials from the storage
yard into the building and loading finished products onto delivery trucks. The east
elevation will not be visible to the public. It is located a minimum of 300 feet from
the bike path and will be screened by a fence and landscaping along the bike trail.
The south side of the office/manufacturing building is a minimum of 500 feet from
any point on Prospect Road and is screened by existing buildings on the Prospect -
Timberline P.U.D. The view from Timberline will be of the north and west elevations
which the applicant has modified as directed by the board.
Staff recognizes that the exact letter of Condition #4 has not been fulfilled.
However, we feel the intent has been met. Improvements have been made to the
elevations that are visible to the public (north and west). Additional landscaping will
ensure the east and south elevations are screened from public rights -of -way
including the bike/pedestrian trail. Should the Board agree, they would only need
to make a finding which releases the applicant from the portion of the condition
which states "all sides".
All Development Criteria:
The request meets the applicable All Development Criteria of the L.D.G.S.
3. Neighborhood Compatibility:
This P.U.D. is contiguous to both the approved but yet to be developed Cache La Poudre
Industrial Park P.U.D. to the north; and the existing Seven Lakes Business Park P.U.D. to
the east. Bath Nursery and Garden Center is west and south of this site across
Timberline Road. In addition, BMC West's commercial/retail building (Prospect Timberline
P.U.D) is directly south of this proposed site. Therefore, the proposed use is compatible
with surrounding land uses and is compatible with its I-L, with a P.U.D. condition zoning
designation. In addition, it is staffs interpretation that changes to the building elevations
and landscaping that have occurred since the Board last reviewed this proposal, have
resulted in better compatibility of the building and the site to the surrounding area.
4. Design:
This request consists of a 37,756 square foot, one-story office/manufacturing facility that
BMC West P.U.D., Final, #1-96A
May 20, 1996 P&Z Meeting
Page 4
an existing metal storage building on the Prospect -Timberline P.U.D. First Filing.
Third, the applicant is concerned that if the landscaping is planted on the north side
of the swale, their usable storage area will be further decreased. Due to the length
of some material which will be stored (up to approximately 60'), maneuverability is
very important. Landscaping which is planted on the north side of the swale will be
in jeopardy of being damaged and possibly destroyed as materials are transported
on the site. Fourth, the south property line of the BMC West P.U.D. is a minimum
of 360' from any portion of Prospect Road. Fifth, the additional landscaping will not
be visible, as the existing buildings on the Prospect -Timberline P.U.D., First Filing
screen over 90% of the south property line of the BMC West PUD from Prospect
Road.
Rather than planting landscaping on the south property line, the applicant has
offered to plant additional landscaping along the west side of the chain link fence
which runs from the south side of the office/manufacturing building to the south
property line so that the storage yard is screened from Timberline Road. In
addition, the applicant has offered to plant landscaping along the eastern property
line of the existing Prospect -Timberline P.U.D. The applicant will provide
perspective views from Prospect and Timberline Roads of the proposed P.U.D. at
the Planning and Zoning Board Hearing.
Staff recommends that while the exact letter of Condition #2 has not been fulfilled,
the intent has been met. Should the Board agree, they would only need to make
a finding which releases the applicant from the portion of the condition which
mandates that evergreen landscaping be planted along the south property line.
Condition #4:
Condition #4 stated, "Building materials on all sides of the proposed BMC West facility shall
be complimentary to the existing 7 Lakes Business Park east of the site."
The applicant revised the architectural elevations using three methods. First, the
building width has been reduced 20', thereby reducing the square footage of the
office/manufacturing building from 43,756 square feet to 37,756 square feet (-6,000
s.f.). Second, the entire north and west elevations and the western 70 feet of the
south elevation are a stucco material. The east elevation and the eastern 240 feet
of the south elevation have remained as a metal building. Third, arch type features
have been added to the north elevation to provide architectural variation.
The applicant requests that the Planning and Zoning Board realize the nature of the
proposed use. The record of the March 25, 1996 Planning and Zoning Board
hearing reveals that a majority of the Board's discussion relating to architecture ,
BMC West P.U.D., Final, #1-96A
May 20, 1996 P&Z Meeting
Page 3
Road, north of the existing BMC West commercial building (Prospect -Timberline P.U.D.,
First Filing).
Conditions #1 and #3:
Condition #1 stated, "Preliminary approval was granted for land use and general layout
except for the parking lot setback distance along Timberline Road"; and Condition # 3
stated, "The parking lot setback from the future edge of right-of-way of Timberline Road
must be increased."
The Preliminary and Final P.U.D. request which was considered on March 25,1996,
proposed a 20' parking lot setback distance from the future edge of right-of-way of
Timberline Road (30' from the existing edge of right-of-way). The revised Final
P.U.D. proposes a thirty foot (30') parking lot setback distance from the future edge
of right-of-way (40' from the existing edge of right-of-way), an increase of ten feet.
The minimum building setback distance from the future edge of right-of-way has
remained at approximately 98 feet. A factor which the Board should consider is that
the future edge of right-of-way is not the flow -line (gutter) of the street. The future
edge of right-of-way is located behind the sidewalk along the street.
Staff feels that the increase of the parking lot setback from 20 feet to 30 feet
satisfies Conditions 1 and 3.
Condition #2:
Condition #2 stated, "Additional evergreen landscaping shall be added to the north and
south property lines."
The Preliminary and Final P.U.D. request which was considered on March 25, 1996,
proposed a fire access lane along the north side of the office/manufacturing facility
which limited the amount of landscaping which could be proposed to 3 Lanceleaf
Cottonwood trees. However, the Poudre Fire Authority has waived their request for
a fire access lane on the north side of the building since the proposed facility will be
equipped with an automated fire suppression system. The revised Final P.U.D. now
proposes 13 Austrian Pine's trees and 6 Lanceleaf Cottonwoods along the north
property line.
No additional landscaping is proposed along the south property line. The applicant
has identified several reasons for being unable to comply with this portion of
Condition #2. First, there is a proposed drainage swale which runs along the south
property line. The Stormwater Utility has requested that no trees or shrubs be
planted in the swale as they will impede drainage flows. Second, there is not
enough room for landscaping to be planted between the south side of the swale and
BMC West P.U.D., Final, #1-96A
May 20, 1996 P&Z Meeting
Page 2
COMMENTS
1. Background:
The surrounding zoning and land uses are as follows:
N: i-g; vacant, Cache la Poudre Industrial Park P.U.D.
S: H-B; existing BMC West commercial building (Prospect Timberline P.U.D.)
E: i-p; Spring Creek, vacant, existing Seven Lake Business Park P.U.D.
W: i-g; vacant.
B-L; Bath Landscaping.
This property was annexed into the City as part of the East Prospect First Annexation on
September 6, 1973 and is zoned I-P, Planned Industrial with a P.U.D. condition.
2. Land Use:
Preliminary Planned Unit Development Plan:
On March 25, 1996, the Planning and Zoning Board considered a Preliminary and Final
P.U.D. request for a 43,756 square feet office/manufacturing facility, 7,200 square feet
storage building and outside storage on approximately 6.55 acres. The Board voted 6-0
to grant Preliminary P.U.D. approval only for the BMC West P.U.D., Preliminary and Final,
#1-96, with the following conditions:
1. Preliminary approval was granted for land use and general layout except for
the parking lot setback distance along Timberline Road.
2. Additional evergreen landscaping shall be added to the north and south
property lines.
3. The parking lot setback from the future edge of right-of-way of Timberline
Road must be increased.
4. Building materials on all sides of the proposed BMC West facility shall be
complimentary to the existing 7 Lakes Business Park east of the site.
Final Planned Unit Development Plan:
This is a request for Final P.U.D. approval for a 37,756 square foot office/manufacturing
facility, 7,200 square foot storage building and outside storage on approximately 6.55
acres. The property is located on the east side of Timberline Road, north of Prospect
ITEM NO. 16
MEETING DATE 5/20/96
STAFF Mike Ludwig
City of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: BMC West P.U.D., Final, #1-96A.
APPLICANT: Ripley Associates
223 Jefferson Street, Suite A
Fort Collins, CO 80524
OWNER: Jim Pask
c/o BMC West
1007 Ogden Court
Fort Collins, CO 80526
PROJECT DESCRIPTION:
This is a request for Final P.U.D. approval for a 37,756 square foot office/manufacturing
facility, 7,200 square foot storage building and outside storage on approximately 6.55
acres. The property is located on the east side of Timberline Road, north of Prospect
Road, north of the existing BMC West commercial building (Prospect -Timberline P.U.D.,
First Filing) and is zoned i-p, Planned Industrial with a P.U.D. condition.
RECOMMENDATION:
EXECUTIVE SUMMARY:
Approval with condition.
This request for Final P.U.D. approval:
*meets all applicable All Development Criteria of the Land Development Guidance
System.
• is compatible with surrounding land uses.
*satisfies each of the four conditions placed on the BMC West P.U.D., Preliminary and
Final, #1-96.
*is in substantial compliance with the approved Preliminary P.U.D.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT