Loading...
HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 3RD FILING, PRIMARY CARE PLAZA - PDP - 32-98E - CORRESPONDENCE - (8)[2/24/04] Call out all fittings, thrust blocks, gate valves, sizes of lines/services, manholes, etc. Number: 30 Created: 2/24/2004 [2/24/04] Provide all appropriate standard detail on the next submittal. Number: 31 Created: 2/24/2004 [2/24/04] Clearly define the abandonment procedure for the existing 12-inch water main. Number: 32 Created: 2/24/2004 [2/24/04] Provide profiles for all 12-inch and larger water lines as well as sanitary sewer lines. See site, landscape and utility plans for other comments. Department: Zoning Issue Contact: Jenny Nuckols Topic: Zoning Number: 3 Created: 2/12/2004 [2/12/04] What kind of walkway is planned from the HC ramp to the main entrance? -please note on site plan Number: 4 Created: 2/12/2004 [2/12/04] Show and label bike rack near main entrance to building Number: 5 Created: 2/12/2004 [2/12/04] Show and label building dimensions and envelope on site plan Number: 6 Created: 2/12/2004 [2/12/04] Note stall dimensions for handicap stalls - note - at least one of the stall needs to be van accessible and signed as such on site. Number: 7 Created: 2/12/2004 [2/12/04] Note building height on elevations Number: 8 Created: 2/12/2004 [2/12/04] Need to label plants and counts on landscape plan Number: 9 Created: 2/13/2004 [2/13/04] As the plants are not labeled, I can't tell if you have trees around the building, but it appears that the plan does not meet full tree -stocking requirements Please return all redlined plans with your re -submittal. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, Carieron Gloss Current Planning Director Page 5 Department: Traffic Operations Issue Contact: Eric Bracke Topic: traffic Number: 2 Created: 2/12/2004 [2/12/04] The Transportation Impact Study is acceptable. The intersection of Snow Mesa/Harmony will need to be designed as a right-in/right-out. I do have concerns regarding the lack of connections of this time to the surrounding neighborhoods. In particular, Snow Mesa to the south and Timberwood to the east. Previous discussions and submittals indicated that the connections would be made with the next filing (this is the next filing) Discussions with PVH at this time have made them aware of the issues. The lack of connectivity will need to be "pushed up the ladder' and P&Z will need a clear understanding of the factors involved in not making those connections at this time. Additionally, we will need to have a thorough examination of the right-in/right-out design in order to assure that violation of the median will be most difficult. The developer should also consider a small roundabout at the intersections of Snow Mesa/private drive, Snow Mesa/Timberwood, and the southern intersection of Snow Mesa and Timberwood. A roundabout design will help control speeds through the property. Department: Transfort Issue Contact: Garold Smith Topic: Plat Number: 12 Created: 2/23/2004 [2/23/04] No Comments Department: Transportation Planning Issue Contact: Tom Reiff Topic: Transportation Number: 35 Created: 2/25/2004 [2/25/04] For the interim Snow Mesa Street design the bike lane striping should remain along the curbside of the roadway as it approaches Harmony. When the Snow Mesa/Harmony intersection is signalized and opened for all turning movements then the bike lane should transition between the right turn lane and the through lane. Number: 36 Created: 2/25/2004 [2/25/04] Please clarify; will the private drive leading to the existing PVH campus be constructed with this project? Number: 37 Created: 2/25/2004 [2/25/04] According to the TIS and previous conversations a temporary 8' asphalt path was planned to connect the proposed development to Timberwood to satisfy a portion of the LOS criteria. Please include this path on subsequent submittals. Suggestion; this path could be shared with the temporary fire lane if the lane is paved and a connection to the lane is made from Snow Mesa. Number: 38 Created: 2/25/2004 [2/25/04] Please label the 8' width and surface material for the sidewalk/trail along Harmony Road on the utility plans. Will these improvements connect to the sidewalk/trail stubbed to the east? Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 29 Created: 2/24/2004 Page 4 Number: 21 Created: 2/23/2004 [2/23/04] Contact Light and Power with load requirements and to coordinate transformer location. Number: 22 Created: 2/23/2004 [2/23/04] Contact Light and Power for development and construction costs. Department: Natural Resources Issue Contact: Doug Moore Topic: General Number: 39 Created: 2/26/2004 [2/26/04] After reviewing development files for the Overall Development Plan and prior filings, I have found that an Ecological Characterization Study and a wetland delineation has never been filed for the Poudre Valley Health System Harmony Campus. Through review of these files and natural habitats and features mapping I have determined based on the critical from section 3.4.1(A) of the Land Use Code that the Natural Resources Department does not need to require either study at this time. No further issues on this project that this time. Department: Police Issue Contact: Joseph Gerdom Topic: General Number: 13 Created: 2/23/2004 [2/23/04] Landscape plan does not reference landscape material list - cannot evaluate. Exit doors should have overhead light and viewport (employee/maintenance access). Department: Stormwater Utility Issue Contact: Basil Harridan Topic: Drainage Number: 34 Created: 2/24/2004 [2/24/04] Please show how drainage will go from building and parking lot area to the detention pond in interim. A culvert is needed under Timberwood Drive to take flows from swale along east property line to the proposed detention pond. Please define better on the plans what portion of the detention pond will be built with this first phase. Topic: General Number: 33 [2/24/04] Created: 2/24/2004 Sediment/Erosion Control Plan Comments Poudre Valley Health Systems Harmony Campus 3rd Filing February 13, 2004 1. Please provide construction stormwater runoff management report, calculations, and plans per city specifications. Page 3 Department: Current Planning Issue Contact: Ginger Dodge Topic: Street Names Number: 1 Created: 2/9/2004 [2/9/04] Snow Mesa Drive is acceptable only if an extension of the existing Snow Mesa Drive. Department: Engineering Issue Contact: Dave Stringer Topic: General Number: 10 Created: 2/23/2004 [2/23/04] Snow Mesa and Harmony will need to be designed as an interim intersection until such time as the connection of Snow Mesa to Timberwood or the connection with Snow Mesa to the south warrants a signalized intersection. Number: 14 Created: 2/23/2004 [2/23/04] Sheet 1/15 Use lighter shading on vicinity map; indicate what typical crossing refers to. Number: 15 Created: 2/23/2004 [2/23/04] Following comments, refer to final development plans sheets. Use type III barricades at termination of streets (public and private), identify curb and gutter types, provide cross section of emergency access road. What does traffic barrier look like? Need PFA approval, provide cross section of pond embankment, drainage channel along east side, outlet, etc. Number: 16 Created: 2/23/2004 (2/23/04] Where are the off -site sanitary sewer plans? Need to identify what is being built with this plan versus other plans. Number: 17 Created: 2/23/2004 [2/23/04] Engineering okay with setting hearing date. Need approval for hearing from other departments. Topic: Plat Number: 11 Created: 2/23/2004 [2/23/04] Need to indicate that area out side of building envelope is an emergency access and utility easement, or identify the area that is for emergency use. Number: 18 Created: 2/23/2004 [2/23/04] Change name of street from Timber Trail to Snow Mesa. Change Timber Trail to Timberwood Department: Light & Power Issue Contact: Alan Rutz Topic: General Number: 19 Created: 2/23/2004 (2/23/04] Electric line will be extended from existing parking lot along private drive to project site. Number: 20 Created: 2/23/2004 [2/23/04] The developer is responsible for lighting along private drives. Light and Power will install floodlights for labor and material cost if requested. There is a monthly maintenance and usage fee per floodlight. Page 2 6aSTAFF PROJECT REVIEW City of Fort Collins BHA DESIGN Date: 03/01/2004 ANGIE MILEWSKI 4803 INNOVATION DR. FT. COLLINS, CO 80525 Staff has reviewed your submittal for PVH HEALTH SYSTEMS, HARMONY CAMPUS, 3RD FILING, PRIMARY CARE PLAZA PDP- TYPE I, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Cameron Gloss Topic: General Number: 23 Created: 2/24/2004 [2/24/04] Due to the nature of the use, pedestrian access ramps accommodating the needs of physically disabled patrons, and people pushing strollers or wheelchairs, will need to be provided in convenient locations. It does not appear that the primary field of parking east of the building provides direct, safe, and convenient access for these users. Since complete separation of vehicles and pedestrians is not possible with the proposed site plan, special paving, pavement markings, and other hardscape and landscape elements should be used to clearly delineate pedestrian areas. Number: 24 Created: 2/24/2004 [2/24/04] Staff supports the applicant's request for an exception to the maximum general office park standard, finding that the additional spaces are necessary to serve needs of the development. Number: 25 Created: 2/24/2004 [2/24/04) The fagade facing Snow Mesa Drive is designed such that the building "turns its back" to the street. There is a relative lack of architectural features, including the fenestration that would project the importance of this side of the building. A primary pedestrian entrance, with a clearly defined entry element should be provided. Number: 26 Created: 2/24/2004 [2/24/04] A direct pedestrian connection between the building entry(s) and the public sidewalk along Snow Mesa Drive must be provided. Number: 27 Created: 2/24/2004 [2124/04] Overall, the building has a relative lack of articulation. Door and window openings have very little, if any, projection or inset that would create more interesting shadow and texture. Lintel and sill treatments, and other window details, have not been employed which will provide visual interest. The building reads as "flat". Number: 28 Created: 2/24/2004 [2124/04] Building materials should reflect the existing PVH Harmony Campus building and those projected in future phase. Page 1