[2/12/041 Need to label plants and counts on landscape plan. Response: The plant list on the
PDP planting plan is representative, a more detailed plan will be created at the FCP level.
Number: 9 Created: 2/13/2004
[2/13/04] As the plants are not labeled, I can't tell if you have trees around the building, but it
appears that the plan does not meet full tree -stocking requirements. Response: Acknowledged.
We believe that we have satisfactorily responded to all comments. Please contact me if
you have any additional comments or concerns at (970) 495-6353.
Sincerely
Robert J. ooney
Project Ar hitect
Xc: Angie Milewski, BHA Design
Jim Allen -Morley, Sear -Brown Engineering
Dean Barber, McWhinney Enterprises
Matt Delich
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 7 of 7
PVHS Harmony Campus
Primary Care Plaza
March 30, 2004
PDP Review Comments
Number: 38 Created: 2/25/2004
[2125/04] Please label the 8' width and surface material for the sidewalk/trail along Harmony
Road on the utility plans. Will these improvements connect to the sidewalk/trail stubbed to the
east? Response: Yes, the future sidewalk will connect to the existing 8-foot walk.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 29 Created: 2/24/2004
[2/24/04] Call out all fittings, thrust blocks, gate valves, sizes of lines/services, manholes, etc.
Response: Acknowledged.
Number: 30 Created: 2/24/2004
[2/24/04] Provide all appropriate standard detail on the next submittal. Response:
Acknowledged.
Number: 31 Created: 2/24/2004
[2/24/04] Clearly define the abandonment procedure for the existing 12-inch water main.
Response: Acknowledged.
Number: 32 Created: 2/24/2004
[2/24/04] Provide profiles for all 12-inch and larger water lines as well as sanitary sewer lines.
See site, landscape and utility plans for other comments. Response: Acknowledged.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 3 Created: 2/12/2004
[2/12/04] What kind of walkway is planned from the HC ramp to the main entrance? -please note
on site plan. Response: Acknowledged and shown on the drawings.
Number: 4 Created: 2/12/2004
[2/12/04] Show and label bike rack near main entrance to building. Response: Acknowledged
and shown on the drawings.
Number: 5 Created: 2/12/2004
[2/12/04] Show and label building dimensions and envelope on site plan. Response:
Acknowledged and shown on the drawings.
Number: 6 Created: 2/12/2004
[2/12/04] Note stall dimensions for handicap stalls - note - at least one of the stall needs to be
van accessible and signed as such on site. Response: Acknowledged and shown on the
drawings.
Number: 7 Created: 2/12/2004
[2/12/04] Note building height on elevations. Response: Acknowledged and shown on the
drawings.
Number: 8
Created: 2/12/2004
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 6 of 7
PVHS Harmony Campus
Primary Care Plaza
March 30, 2004
PDP Review Comments
Please provide construction stormwater runoff management report, calculations, and plans per
city specifications. Response: These will be provided with the FCP submittal.
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: traffic
Number: 2 Created: 2/12/2004
[2/12/04] The Transportation Impact Study is acceptable. The intersection of Snow
Mesa/Harmony will need to be designed as a right-in/right-out. I do have concerns regarding the
lack of connections of this time to the surrounding neighborhoods. In particular, Snow Mesa to
the south and Timberwood to the east. Previous discussions and submittals indicated that the
connections would be made with the next filing (this is the next filing) Discussions with PVH at this
time have made them aware of the issues. The lack of connectivity will need to be "pushed up
the ladder" and P&Z will need a clear understanding of the factors involved in not making those
connections at this time. Response: We will be submitting a traffic study addendum to
address this.
Additionally, we will need to have a thorough examination of the right-in/right-out design in order
to assure that violation of the median will be most difficult. Response: We will be submitting a
traffic study addendum to address this.
The developer should also consider a small roundabout at the intersections of Snow Mesa/private
drive, Snow Mesa/Timberwood, and the southern intersection of Snow Mesa and Timberwood. A
roundabout design will help control speeds through the property. Response: The developer
may consider this, but is not shown at this time.
Department: Transfort Issue Contact: Garold Smith
Topic: Plat
Number: 12 Created: 2/23/2004
[2/23/04] No Comments
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 35 Created: 2/25/2004
[2/25/04] For the interim Snow Mesa Street design the bike lane striping should remain along the
curbside of the roadway as it approaches Harmony. When the Snow Mesa/Harmony intersection
is signalized and opened for all turning movements then the bike lane should transition between
the right turn lane and the through lane. Response: Acknowledged.
Number: 36 Created: 2/25/2004
[2/25/041 Please clarify; will the private drive leading to the existing PVH campus be constructed
with this project? Response: Yes.
Number: 37 Created: 2/25/2004
[2/25/04] According to the TIS and previous conversations a temporary 8' asphalt path was
planned to connect the proposed development to Timberwood to satisfy a portion of the LOS
criteria. Please include this path on subsequent submittals. Suggestion; this path could be shared
with the temporary fire lane if the lane is paved and a connection to the lane is made from Snow
Mesa. Response: Acknowledged.
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 5 of 7
PVHS Harmony Campus
Primary Care Plaza
March 30, 2004
PDP Review Comments
Number: 21 Created: 2/23/2004
[2/23/04] Contact Light and Power with load requirements and to coordinate transformer location.
Response: Acknowledged.
Number: 22 Created: 2/23/2004
[2/23/041 Contact Light and Power for development and construction costs. Response:
Acknowledged.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 39 Created: 2/26/2004
[2/26/041 After reviewing development files for the Overall Development Plan and prior filings, I
have found that an Ecological Characterization Study and a wetland delineation has never been
filed for the Poudre Valley Health System Harmony Campus. Through review of these files and
natural habitats and features mapping I have determined based on the critical from section
3.4.1(A) of the Land Use Code that the Natural Resources Department does not need to require
either study at this time. No further issues on this project that this time. Response:
Acknowledged.
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 13 Created: 2/23/2004
[2/23/04] Landscape plan does not reference landscape material list - cannot evaluate. Exit doors
should have overhead light and viewport (employee/maintenance access). Response: The
plant list on the PDP planting plan is representative, a more detailed plan will be created at
the FCP level.
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Drainage
Number: 34 Created: 2/24/2004
[2/24/04] Please show how drainage will go from building and parking lot area to the detention
pond in interim. A culvert is needed under Timberwood Drive to take flows from swale along east
property line to the proposed detention pond. Please define better on the plans what portion of the
detention pond will be built with this first phase. Response: The drainage from the site will
drain via swale to the main north -south channel and then by the culvert to the partially
built detention pond. We will do the final design of the that portion of the detention pond at
FCP submittal.
Topic: General
Number: 33
[2/24/04]
Created: 2/24/2004
SedimentlErosion Control Plan Comments
Poudre Valley Health Systems Harmony Campus 3rd Filing
February 13, 2004
Number 1
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 4 of 7
PVHS Harmony Campus
Primary Care Plaza
March 30, 2004
PDP Review Comments
Department: Engineering Issue Contact: Dave Stringer
Topic: General
Number: 10 Created: 2/23/2004
[2/23/041 Snow Mesa and Harmony will need to be designed as an interim intersection until such
time as the connection of Snow Mesa to Timberwood or the connection with Snow Mesa to the
south warrants a signalized intersection. Response: We are aware that the City is in
negotiation with the Hospital and the Developer to resolve this issue.
Number: 14 Created: 2/23/2004
[2/23/041 Sheet 1/15 Use lighter shading on vicinity map, indicate what typical crossing refers to.
Response: Acknowledged and revised to a lighter shading on the drawings.
Number: 15 Created: 2/23/2004
[2/23/041 Following comments, refer to final development plans sheets. Use type III barricades at
termination of streets (public and private), identify curb and gutter types, provide cross section of
emergency access road. What does traffic barrier look like? Need PFA approval, provide cross
section of pond embankment, drainage channel along east side, outlet, etc. Response:
Comment noted and will be addressed at FCP submittal.
Number: 16 Created: 2/23/2004
[2/23/04] Where are the off -site sanitary sewer plans? Need to identify what is being built with
this plan versus other plans. Response: There is not off -site sewer. The sewer in the
phasing Plan is what needs to be constructed.
Number: 17 Created: 2/23/2004
[2/23/04] Engineering okay with setting hearing date. Need approval for hearing from other
departments. Response: Acknowledged.
Topic: Plat
Number: 11 Created: 2/23/2004
[2/23/041 Need to indicate that area out side of building envelope is an emergency access and
utility easement, or identify the area that is for emergency use. Response: The emergency
access designation will be added at the final plat.
Number: 18 Created: 2/23/2004
[2/23/04] Change name of street from Timber Trail to Snow Mesa. Change Timber Trail to
Timberwood. Response: The street names have been corrected.
Department: Light & Power Issue Contact: Alan Rutz
Topic: General
Number: 19 Created: 2/23/2004
[2/23/04] Electric line will be extended from existing parking lot along private drive to project site.
Response: Acknowledged.
Number: 20 Created: 2/23/2004
[2/23/041 The developer is responsible for lighting along private drives. Light and Power will
install floodlights for labor and material cost if requested. There is a monthly maintenance and
usage fee per floodlight. Response: Acknowledged.
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 3 of 7
PVHS Harmony Campus
Primary Care Plaza
March 30, 2004
PDP Review Comments
pedestrian entrance on the "street' side was impractical. Therefore, we have
changed the layout to accommodate your concerns by shifting the parking lot to
the west, placing the facade and the primary pedestrian entry to the west.
Number: 26 Created: 2/24/2004
[2/24/041 A direct pedestrian connection between the building entry(s) and the public
sidewalk along Snow Mesa Drive must be provided. Response: Three pedestrian
connections are show from the building to snow mesa. Also, see response to
number 25 above.
Number: 27 Created: 2/24/2004
[2/24/04] Overall, the building has a relative lack of articulation. Door and window
openings have very little, if any, projection or inset that would create more interesting
shadow and texture. Lintel and sill treatments, and other window details, have not been
employed which will provide visual interest. The building reads as "flat". Response: A
portion of the reason the building reads as "flat" has to do with the CADD drawings
presented. The intention is to have movement of the materials around the windows
as requested. Along with shifting the main fagade to the west elevation, we have
added gable dormers to the north and south elevations (with engaged columns)
and increased the depth of the roof overhang. The basic massing items are better
shown in some additional drawings we are providing.
Number: 28 Created: 2/24/2004
[2/24/04] Building materials should reflect the existing PVH Harmony Campus building
and those projected in future phase. Response: The building materials will be
dictated by the newly developed Guidelines created by the Developer (McWhinney
Enterprises) and the Hospital. The materials are shown on the drawings and
include the following:
a. Brick base — to match the colors of the existing campus brick
b. Stone accents — around the engaged columns at the entries to match the
existing buildings.
c. EIFS (synthetic stucco) — using the color palettes of the existing building,
the guidelines allow some use of this product. (The backside of the
existing ACC building also contains this product.)
d. Painted steel beams at entryways.
e. High profile asphalt/composite shingles — the use of this product is
allowed on the "East Campus" only by the Guidelines.
Department: Current Planning Issue Contact: Ginger Dodge
Topic: Street Names
Number: 1 Created: 2/9/2004
[2/9/04] Snow Mesa Drive is acceptable only if an extension of the existing Snow Mesa Drive.
Response: The alignment of this portion of the drive is intended to be the extension of the
existing Snow Mesa Drive.
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 2 of 7
Arch istruction
March 30, 2004
Cameron Gloss
City of Fort Collins
Planning Department
Fort Collins
P.O. Box 2127 (80522)
2620 E. Prospect Road, Suite 100
Fort Collins, CO 80525
(970) 493-8747
(9701493-5869FAX
Re: PVHS Harmony Campus
Primary Care Plaza
PDP Review Comments
Dear Cameron:
Denver
Eighteenth Street Atrium
1621 18th Street, Suite 250
Denver, CO 80202
(303)296-0383
(303) 296-0382 FAX
Colorado Springs
P.O. Box 1478
Colorado Springs, CO
80901-1478
(719) 633-4713
(719)633-9508 FAX
We offer the following responses to the PDP Review Comments from City Planning Staff
dated 3/1 /04.
ISSUES:
Department: Current Planning Issue Contact: Cameron Gloss
Topic: General
Number: 23 Created: 2/24/2004
[2/24/04] Due to the nature of the use, pedestrian access ramps accommodating the
needs of physically disabled patrons, and people pushing strollers or wheelchairs, will
need to be provided in convenient locations. It does not appear that the primary field of
parking east of the building provides direct, safe, and convenient access for these users.
Since complete separation of vehicles and pedestrians is not possible with the proposed
site plan, special paving, pavement markings, and other hardscape and landscape
elements should be used to clearly delineate pedestrian areas. Response:
Acknowledged, see new site plan.
Number: 24 Created: 2/24/2004
[2/24/04] Staff supports the applicant's request for an exception to the maximum general
office park standard, finding that the additional spaces are necessary to serve needs of
the development. Response: Acknowledged.
Number: 25 Created: 2/24/2004
[2/24/04] The facade facing Snow Mesa Drive is designed such that the building "turns its
back" to the street. There is a relative lack of architectural features, including the
fenestration that would project the importance of this side of the building. A primary
pedestrian entrance, with a clearly defined entry element should be provided. Response:
Due to the nature of the use of this specific type of medical use, locating a primary
PVH Harmony Primary Care PDP Responses 3 30 04.doc Page 1 of 7