Loading...
HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 3RD FILING, PRIMARY CARE PLAZA - PDP - 32-98E - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTSEAR• BROWN Wednesday, March 31.2004 Basil Hamdan City of Fort Collins Storm Water Utilities 700 Wood Street Fort Collins, CO 80521 2095outh Meldrum Fort Collins, CO 80521 970.482.5922 phone 970.482.6368 fax www.searbrown.com RE: PVHS Harmony Campus Primary Care Plaza Addendum to the PVHS Harmony Campus Master Infrastructure Drainage Report. Dear Basil: The Primary Care Plaza is a project that consists of an office building and parking (2.6 ac) that is located at the southeast corner of Snow Mesa Drive and the north access road. The purpose of this addendum is to show compliance with the PVHS Harmony Campus Master Drainage Plan. The site is now a fallow field that drains to the south and southeast. In the proposed condition, the site will be located in drainage basin 107, as shown in the PVHS Harmony Campus Master Infrastructure Drainage Report, dated February 11, 2004. The current site tits within the 80 percent impervious area assumption that has been made in the Master Drainage Plan. Basin 107 releases at a 10-year flow rate of 11.68 cfs and a 100-year flow rate of 33.63 cfs. The site will drain via curb and gutter, cross -pans, area inlets, storm drain, and temporary swales to the east and into a permanent swale, located along the east PVH property line. The permanent swale will transport the runoff south, under the fire lane, and into the partially constructed detention pond. It is anticipated that there will be some form of a permanent swale along the eastern property line of PVHS Harmony Site. The location of the swale may be relocated in the future depending on how development occurs. The detention pond will be partially constructed at this time. The outlet structure will be constructed in its final form with the orifice size being constructed for entire the site. The detention pond will be constructed to approximately a third of its ultimate size. Erosion Control will be addressed with the final drainage report of this project by incorporating best management practices. Thank you for your time and consideration. If you have any questions, please let me know. Yours S' erely"Manager 4Jim AlleSenior Pr