HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 3RD FILING, PRIMARY CARE PLAZA - PDP - 32-98E - CORRESPONDENCE - (9)REVISION
COMMENT SHEET
DATE: March 31, 2004 TO: Xcel Energy
PROJECT: #32-98E PVH Health Systems Harmony
Campus, 3rd Filing, Primary Care Plaza PDP —
Type I
All comments must be received by Cameron Gloss no later than
the staff review meeting:
April 14, 2004
❑ No Comment
Problems or Concerns (see below or attached)
RECEIVED
CURRENT PLANNING
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
• PSCO NRI A 2 „ d 2" &RJ Mh1N l.DCRTfO ALONG TIMBOPWOOD DQ MAr
FP -IT OF PROPMED PROTECT / IF TELE i CAdIE d' OR ELEr- IJTILITIEI
PLACE AAJY OF THEIR EQUIPMENT IN THE PROPOSER 7 ' U.E. , T7/-E�III
FASEPIDu rj WILL NEED TU RE EXPANDED 7D /1 ' U E. TO I9LL04J
INSTALLATIO/V OF GA-t P11V I NI,
• WILL N.EE8 GAS LORDS d-- PROPMEA MTi2 LDCI17WAI TO PROVIDE
ESTI /'1 RTF TD EXTEND 6lFI /'f A/N TO SERVE PROPOSED K EETIIY (t-
/Fy
Name (please print) Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
z-frat 6sitc _Drainage Report _Other 6i
Gi-tfility _Redline Utility landscape city of Fort cou»s
Number: 31 Created: 2/24/2004
[4/13/04]
[2/24/04] Clearly define the abandonment procedure for the existing 12-inch water
main.
Number: 32 Created: 2/24/2004
[4/13/04] Could the water main located on the north edge of this development be
reduced from and 8-inch to a 6-inch for water quality?
Place all fire hydrants within 5 feet of a paved surface. No water services are
permitted beyond the last fire hydrant on a water main.
[2/24/04] Provide profiles for all 12-inch and larger water lines as well as sanitary
sewer lines.
See site, landscape and utility plans for other comments.
Department: Water Wastewater Issue Contact: Roger Buffington
Topic: Utility plans
Number: 50 Created: 4/14/2004
[4/14/04] There currently seems to be a disconnect between these utility plans and
the infrastructure plans. A meeting is needed between Jim Allen -Morley and various
City departments (engineering, stormwater and water/wastewater).
Please return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Yours Truly,
Cameron Gloss
Current Planning Director
Page 4
Topic: Phasing plan
Number: 43 Created: 4/13/2004
[4/13/04]
Please clarify what portion of the pond will be built with this Primary Care facility.
The current plans indicate that a portion of the pond would be constructed with this
facility however does not provide a grading plan for that phase 1 pond design.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: -+
Number: 37 Created: 2/25/2004
[4/13/04] Is the path planned to be integrated with the temporary emergency access
road? If it is please identify it on all plan sets and make sure the temporary
road is accessible to bikes and pedestrians. This will most likely require a
ramp or driveway cut and a sidewalk connection.
[2/25/04] According to the TIS and previous conversations a temporary 8' asphalt
path was planned to connect the proposed development to Timberwood to satisfy a
portion of the LOS criteria. Please include this path on subsequent submittals.
Suggestion; this path could be shared with the temporary fire lane if the lane is
paved and a connection to the lane is made from Snow Mesa.
Topic: Transportation
Number: 36 Created: 2/25/2004
[4/13/04] The applicant response to the previous comment mentioned that they will
provide a traffic study addendum to address this comment. The addendum
has not yet been received.
[2/25/04] Please clarify; will the private drive leading to the existing PVH campus be
constructed with this project?
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 29 Created: 2/24/2004
[4/13/04]
[2/24/04] Call out all fittings, thrust blocks, gate valves, sizes of lines/services,
manholes, etc.
Number: 30
[4/13/04]
Created: 2/24/2004
[2/24/04] Provide all appropriate standard detail on the next submittal.
Page 3
Number: 46 Created: 4/14/2004
[4/14/04] a site plan shall be submitted to review the acceptance, the efficiency and
the effectiveness of the temporary fire access to Timberwood Drive by the PFA.
Number: 47 Created: 4/14/2004
[4/14/04] The building is required to be fire sprinklered, and to have a fire alarm
system, both installed and in service prior to issuance of the Cert. of Occupancy.
Number: 48 Created: 4/14/2004
[4/14/04] fire hydrants will be required to be located along the fire lane with one
being within 300 of the building; thereafter, they will be spaced on 600 centers.
Hydrants required to deliver 1500 gpm @ 20 psi.
Number: 49 Created: 4/14/2004
[4/14/04] address is required to be visible from the street fronting the property.
Address numerals required to be a minimum of 6 inches posted on a contrasting
background. If bronze/brass numerals are used they shall only be posted on a black
background for visibiltity.
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 41 Created: 4/12/2004
[4/12/04] Will evaluate landscape, lighting, surveillance at FCP.
Department: Stormwater Utility Issue Contact: Basil Harridan
Topic: Drainage Report
Number: 44 Created: 4/13/2004
[4/13/041
No drainage report was submitted. Was this to be handled by the report associated
with the infrastructure plans ? At a minimum a small report should still be submitted
covering the local drainage infrastructure such as the pipe in the parking lot, the
temporary pipe at the turn -around the size of the swale and the erosion control
measures associated with this facility.
ob Zakely still expects an erosion control plan and report to be submitted for this
site.
Topic: Grading and drainage plan
Number: 42 Created: 4/13/2004
[4/13/04] The grading plan that was submitted was taken from the infrastructure
plan. Please submit a grading and draiange plan for this project at a scale limited to
the scope of this project. A separate exhibit for the off -site swale can be provided
showing how the drainage will get from this site to the large pond on the southeast
corner of the PVH campus.
Page 2
g Aarwft)
STAFF PROJECT REVIEW
City of Fort Collins
BHA DESIGN Date:04/19/2004
ANGIE MILEWSKI
4803 INNOVATION DR.
FT. COLLINS, CO 80525
Staff has reviewed your submittal for PVH HEALTH SYSTEMS, HARMONY
CAMPUS, 3RD FILING, PRIMARY CARE PLAZA PDP- TYPE I, and we offer the
following comments:
ISSUES:
Department: Current Planning Issue Contact: Cameron Gloss
Topic: Utility plans
Number: 51 Created: 4/19/2004
[4/19/04] Staff supports the revised site plan that reorients the building fagade
toward Snow Mesa Drive and the proposed Private Drive given that the building is
part of the larger PVHS campus.
Number: 52 Created: 4/19/2004
[4/19/04] Please show how pedestrian access will be provided to the common open
space area eventually to be constructed east of the primary care building.
Number: 53 Created: 4/19/2004
[4/19/041 An administrative public hearing has been scheduled for this item on May
17, 2004. Please submit the addendum to the traffic study, a written response to the
review comments and 5 sets (site and landscape plans, plat, architectural elevations
and isometric elevation) to the Current Planning Department no later than May 3rd.
Department: Light & Power Issue Contact: Alan Rutz
Topic: General
Number: 40 Created: 4/12/2004
[4/12/04] Transformer location has not been discussed with Light & Power. The
transformer can be located at the northwest corner of building, adjacent to the
parking lot. This will require moving the sewer, fire line and water service to the
east. Contact Light & Power as soon as possible with comments about transformer
location, electric and gas meter locations.
Department: PFA Issue Contact: Ron Gonzales
Topic: fire
Number: 45 Created: 4/14/2004
[4/14/04] the private drive will be required to be shown on the plat as a dedicated
emergency access easement.
Paue 1