Loading...
HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 3RD FILING, PRIMARY CARE PLAZA - PDP - 32-98E - CORRESPONDENCE -I� At final please provide a storm sewer plan and profile, as well as an erosion control plan for the construction on this site. At finals provide details for proposed rip rap Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 60 Created: 5/20/2004 [5/20/04] Provide profiles of all sanitary sewer and storm sewer mains proposed with this development. Number: 61 Created: 5/20/2004 [5/20/04] Is 1.5-inch water service adequate for this facility? Provide flow calculations for our review. See site, landscape and utility plans for other comments. Topic: General Number: 29 Created: 2/24/2004 [5/20/04] [4/ 13/04] [2/24/04] Call out all fittings, thrust blocks, gate valves, sizes of lines/services, manholes, etc. Number: 30 [5/20/04] [4/13/04] Created: 2/24/2004 [2/24/04] Provide all appropriate standard detail on the next submittal. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, Cameron Gloss ( " Current Planning Director Page 3 �r N Topic: General Number: 10 [5/18/04] Created: 2/23/2004 [2/23/04] Snow Mesa and Harmony will need to be designed as an interm intersection until such time as the connection of Snow Mesa to Timberwood or the connection with Snow Mesa to the south warrants a signalized intersection. Department: Light & Power Issue Contact: Alan Rutz Topic: 5 Number: 54 Created: 5/13/2004 [5/13/04] Proposed transformer location is too close to storm sewer line for installation of primary cable and transformer. Could the trash enclosure location be swapped with the transformer locaion? Contact Light & Power to discuss possible transformer locations. Department: Natural Resources Topic: General Number: 59 [5/19/041 No issues. Issue Contact: Doug Moore Created: 5/19/2004 Department: Stormwater Utility Issue Contact: Basil Hamdan Topic: Easements Number: 62 Created: 5/21 /2004 [5/21/04] Please submit a grading easement for the area to the east of the site that will be impacted by the construction of this facility. The easement for the swale taking flows from this site shall be done through the processing of the infrastructure plans. Those plans will need to be approved prior to final approval for this facility. Topic: Utility plans Number: 63 [5/21 /04] Created: 5/21 /2004 Please move proposed storm sewer alignment in the parking lot further south as not to impact electric transformer. Page 2 N -r STAFF PROJECT REVIEW City of Fort Collins BHA DESIGN Date:05/24/2004 ANGIE MILEWSKI 4803 INNOVATION DR. FT. COLLINS, CO 80525 Staff has reviewed your submittal for PVH HEALTH SYSTEMS, HARMONY CAMPUS, 3RD FILING, PRIMARY CARE PLAZA PDP- TYPE I, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Cameron Gloss Topic: General Number: 64 Created: 5/24/2004 [5/24/04] If the applicant desires to amend the site plan and architecture as presented to staff on May 12, 2004, please submit revised plans to the Current Planning Department no later than 5:00 pm on May 26, 2004. Number: 65 Created: 5/24/2004 [5/24/04] An adminstrative public hearing has been scheduled for this PDP application on June 1, 2004 at 281 N. College Conference Room A. Department: Engineering Issue Contact: Dave Stringer Topic: General Number: 55 Created: 5/18/2004 [5/18/04] Are off -site easements needed? If so need to submit letters of intent. Appears some workon the east impacts someone elses property Number: 56 Created: 5/18/2004 [5/18/04) Indicate what plans street design is taken from ( see sheet ?/? Of infastructure............. Number: 57 Created: 5/18/2004 [5/18/04] Remove 50 'turn around. It's no longer needed Number: 58 Created: 5/18/2004 [5/18/04] May have additional comments with revised building and site layout currently under consideration. Page 1