Loading...
HomeMy WebLinkAboutUNIVERSITY CENTER PUD (UNIVERSITY MALL REDEVELOPMENT) - PRELIMINARY - 2-96 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTWIMM r E)Engineerk a i APPENDIX A MAPS AND FIGURES 6. 7. MISCELLANEOUS 6.1 Variances There are no variances requested with the development of the University Town Center PUD, 6.2 Irrigation Ditches As previously discussed, the eventual outfall for this project is the Sherwood Ditch Lateral (as this is the existing outfall for this area). 6.3 Ditch Company Approval Because this is the existing outfall for the drainage from this area, it is anticipated that the Developer will work jointly with the City Stormwater Utility in order to obtain approval to continue the release of flows into this structure. 6.4 Maintenance Agreements The developer will be responsible for the maintenance of all temporary drainage structures. REFERENCES 1. City of Fort Collins, "Storm Drainage Design Criteria and Construction Standards", (SDDCCS), dated May, 1984. 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated March, 1969, and Volume 3 dated September, 1992. 3. "Spring Creek Master Drainageway", prepared by Engineering Professionals, Inc., dated March, 1988. 11 4.1 PR.igL Without Detention 10 Year 100 Year Existing Runoff Basins EEX5,E19 15.56 cfs 34.49 cfs Developed Runoff Basins DEX3,137,138,139,D10 26.46 cfs 44.60 cfs Difference - 10.90 cfs - 10.11 cfs With Parking Area Detention (Preliminary) Existing Runoff Basins EEX5,E19 15.56 cfs 34.49 cfs Released Developed Runoff Basins D7,D8,D9 8.68 cfs 20.52 cfs Developed Runoff Basins DEX3,1310 - 5.48 cfs 11.30 cfs Difference 1.40 cfs less than Existing 2.67 cfs less than Existing As part of the preparation of the final plans for this site, the exact location and limits of the detention area will be determined with the release rates limited to equal to or less than -the existing 10-year and 100-year runoff rates. 5. EROSION CONTROL The specific erosion control report and plan for this project are not included in this preliminary report. Upon preparation of the Final Drainage and Erosion Control Report and Plans for this project, this information will be determined (including detailed description, calculations, schedule, and appropriate cost estimates) in accordance with the SDDCCS. 10 1 3.8 Inlet Design There are two (2) sump condition area inlets proposed with the University Town Center PUD. These inlets (standard Type C) are located in the southwest portion of this site. 3.9 Storm Sewer Design There is one underground storm sewer pipe system proposed with the development of University Town Center PUD. This storm sewer pipe system (15" RCP) is located in the southwest portion of the site and will be connected to the existing underground storm sewer system. 4. DETENTION POND (PARKING AREA) There is one detention pond proposed with the development of the University Town Center PUD. This detention area is designed to reduce the flows to be released onto the existing outfall swale in the northwest comer of this site to at or less than the existing 10-year and 100-year runoff rates. Parking Area Detention The proposed parking area detention pond has been sized on a preliminary basis as part of this report. The size of the pond is limited by the 6 inch vertical curb along the east size of the proposed storage unit areas and the proposed one percent (1%) cross slope for the parking area between the University Town Center building and said curb line (for this area, approximately 800 feet by 50 feet, the volume is 10,000 cubic feet). In order to evaluate this detentionarea on the developed flows, preliminary calculations were run (included in the Appendix) to determine if this was adequate. These calculations showed the following (utilizing a total weir length of 18 feet (6 feet at each location): 9 All hydrologic calculations associated with the sub -basins shown on Figure 3.1 are attached in the Appendix of this report. Table 3.1 provides a summary of the design flows for all Subbasins and Design Points (DP's) associated with this site. CI00 Tc (2) Tc (100) Q (2) Q (100 DESIGN AREA AREA C10 POINT DESIG. (ACRES) CFS (CFS DI 0.56 0.92 1.00 5.0 10.0 2.89 3.991 D2 0.60 0.91 1.00 5.0 10.0 3.06 4.2 D3 0.25 0.86 1.00 5.0 10.0 1.20 1.7 D4 0.75 0.93 1.00 5.0 10.0 3.89 5.3 DEXI 0.16 0.50 0.63 5.0 10.0 0.45 0.71 D5 0.79 0.91 1.00 5.0 10.0 4.02 5.621 DEX1,D5 0.95 0.84 1.00 5.6 10.0 4.33 6.7 DEX2 0.09 0.50 0.63 5.01 10.0 0.25 0.4 D6 0.63 0.93 1.00 5.0 10.0 3.26 4.4 DEX2,D6 0.72 0.87 1.00 7.0 10.0 3.18 5.13 D7 1.38 0.95 1.00 5.0 10.0 7.32 9.8 D8 1.55 0.94 1.00 5.1 10.0 8.09 11.0 D9 2.13 0.94 1.00 5.0 10.0 11.17 15.1 D7,D8,D9 5.06 0.94 1.00 5.11 10.0 26.49 36.0 DEX3 0.36 0.501 0.63 5.0 10.0 1.00 1.6 D10 1.38 0.871 1.00 9.1 10.0 5.53 9.8 DEX3,D10 1.74 0.791 0.99 13.1 12.2 5.48 11.3 DEX3,D7, 6.80 0.901 1.00 13.1 12.2 26.46 44.6 D8,D9,D10 DI 1 0.65 0.951 1.001 5.01 10.0 3.45 4.63 3.7 Allowable Street Flow Capacities The University Town Center PUD does not affect flows on any existing or proposed streets. Therefore, calculations for allowable street capacities for surrounding, existing streets are not included. iJ a L i.. OL' 0 n I 0 1 1 1 The runoff from the combination of Subbasins DEX3 and D7, D8, D9 and D10 is routed to the existing outfall swale as stated in the previous paragraphs. 3.6 Hydrologic Analysis of the Proposed Drainage Conditions The Rational Method was used to determine both 10-year and 100-year peak runoff values for each Subbasin. Runoff coefficients were assigned utilizing Table 3-2 of the SDDCCS Manual. As stated above, the Rational Method was used for all hydrologic analyses for the project site. The Rational Method utilizes the SDDCCS equation: Q = CrCIA (1) where Q is the flow in cfs, A is the total area of the basin in acres, Cf is the storm frequency adjustment factor, C is the runoff coefficient, and I is the rainfall intensity in inches per hour. The frequency adjustment factor, Cs is 1.0 for the initial 10-year storm and 1.25 for the major 100-year storm. The appropriate rainfall intensity information was developed based on rainfall intensity duration curves in the SDDCCS Manual. In order to utilize the rainfall intensity curves, the time of concentration is required. The following equation was used to determine the time of concentration: tC=ti+tt ; (2) where t. is the time of concentration in minutes; t is the initial or overland flow time in minutes, and tt is the travel time in the ditch, channel, or gutter in minutes. The initial or overland flow time is calculated with the SDDCCS Manual equation: ti = [1.87(1.1 - CCf)L0.5]/(s)0.33 (3) where L is the length of overland flow in feet (limited to a maximum of 500 feet), S is the average slope of the basin in percent, and C and Cf are as defined previously. 7 flow. The runoff from Subbasin DEM is routed onto Subbasin D5 via overland flow. Runoff from Subbasin D5 is conveyed into a proposed sump condition area inlet to be located west of the proposed building in the southwest portion of this site via sheet flow. The runoff from the combination of Subbasins DEXI and D5 are routed to the proposed sump condition area inlet as previously stated. The runoff from Subbasin DEX2 is routed onto Subbasin D6 via overland flow. Runoff from Subbasin D6 is conveyed into a proposed sump condition area inlet to be located east of the proposed building in the southwest portion of this site via sheet flow. The runoff from the combination of Subbasins DEX2 and D6 are routed to the proposed sump condition area inlet as previously stated. Runoff from Subbasin D7 is conveyed westerly to the proposed parking lot detention area and released onto Subbasin D10 through a proposed curb cut (weir structure). Runoff from Subbasin D8 is conveyed westerly to the proposed parking lot detention area and released onto Subbasin D10 through a proposed curb cut (weir structure). Runoff from Subbasin D9 is conveyed westerly to the proposed parking lot detention area and released onto Subbasin D10 through a proposed curb cut (weir structure). The runoff from the combination of Subbasins D7,,D8 and D9 is routed onto Subbasin D10 as stated in the previous paragraphs. The runoff from Subbasin DEX3 is routed onto Subbasin D10 via overland flow. Runoff from Subbasin D10 is conveyed northerly in a proposed swale between the proposed storage buildings and outfalls into the existing swale at the northwest corner of this site. C� 3.4 General Flow Routing The final drainage pattern for this area has been developed to provide a drainage system that is compatible with the surrounding area. This has been accomplished by utilizing existing drainage patterns to the extent possible and routing flows to limit the amount of required drainage facilities. The proposed drainage facilities for this site consist of existing area inlets and outfall pipes, proposed inlets and pipe in the southwest corner of the site, and parking lot detention in the rear of the site. The proposed drainage system meets the requirements for providing drainage relief by reducing the impact of the flows generated by the re -development of portions of this site on downstream areas (restricting release rates to existing) and meets the criteria in the SDDCCS. (See attached "Preliminary Drainage Plan" for the location of all drainage facilities.) 3.5 Proposed Drainage Plan A qualitative summarization of the drainage patterns within each sub -basin and at each design point is provided in the following discussion paragraphs. Discussions of the detailed design of drainage facilities identified in this section are included in Sections 3.7. Note: The drainage for the portion of this site between the existing mall and College Avenue (north of McDonalds) does not change as a result of this project. Therefore, developed flows were not calculated for these areas nor described below. Runoff from Subbasin D1 is conveyed into three (3) existing sump condition area inlets adjacent to the north side of McDonalds via sheet flow. Runoff from Subbasin D2 is conveyed into an existing sump condition area inlet adjacent to the south side of McDonalds via sheet flow. Runoff from Subbasin D3 is conveyed into an existing sump condition area inlet in the parking area south of McDonalds via sheet flow. Runoff from Subbasin D4 is conveyed into a proposed sump condition area inlet to be located east of the proposed building in the southwest portion of this site via sheet 5 3. �I 9 DEVELOPED FLOWS 3.1 Method The Rational Method was used to determine both the 10-year and 100-year flows for the sub - basins indicated in this drainage report. A detailed description of the hydrologic analysis is provided in Section 3.6 of this report. The historic (existing) flows for this site are included as part of this report. The resulting 10- and 100-year runoff values were used to compute discharges at specific design points. 3.2 Exterior Flows i Exterior flows enter this site from the west (the existing Burlington Northern Railroad). All g lands lying within these areas have been assigned land use characteristics reflecting their I current, developed conditions. These areas are identified on the attached "Preliminary Drainage Plan" and calculations are included in the Appendix of this report. 3.3 Onsite Flows Flows within this site will take the form of overlot and swale flow. The existing drainage patterns have been maintained where possible. All grading has been designed to carry flows away from structures to the proposed drainage facilities. 1 4 The proposed re -development of portions of this site does not result in changes to the flows and drainage structures on the east side of the this site. Therefore, the basins were delineated and flows calculated for reference. However, further analysis of said existing system is not warranted and is well outside the scope of this report. The outfall from the rear of the site (the existing outfall swale) flows have been determined and the developed flows will be limited to the existing 10-year and 100-year runoff rates. AREA AREA CIO C 100 Tc 2 Tc 100 Q 2 Q 100 DESIG. ACRES CFS CFS EXl 0.82 0.95 1.00 5.01 10.0 4.35 5.841 1 0.51 0.92 1.00 5.01 10.0 2.621 3.6.3 EX1,E1 1.33 0.941 1.00 5.01 10.0 6.971 9.4 2 0.71 0.891 1.00 5.01 10.0 3.511 5.05 3 0.25 0.831 1.00 5.01 10.0 1.161 1.7 4 0.84 _0.921 1.00 5.01 10.0 4.331 5.9 5 0.28 0.90 1.00 5.0 10.0 1.40 1.9 6 0.98 0.87 1.00 5.0 10.0 4.78 6.9 7 0.16 0.81 1.00 5.0 10.0 0.72 1.1 8 0.07 0.95 1.00 5.0 10.0 0.37 0.5 9 0.41 0.951 1.00 5.01 10.0 2.171 2.9 10 0.56 0.951 1.00 5.01 10.0 2,971 3.9 11 0.58 0.901 1.00 5.01 10.0 2.911 4.13 12 0.29 0.951 1.00 5.0 10.0 1.54 2.0 13 0.74 0.931 1.00 5.0 10.0 3.84 5.2 14 0.64 0.871 1.00 5.0 10.0 3.10 4.5 15 0.47 0.741 0.93 9.1 10.0 1.61 3.11 EX2 0.18 0.501 0.63 5,01 10.0 0.50 0.8 16 1.64 0.21 0.26 12.3 12.3 1.40 2.8 EX2,E16 1.82 0.24 0.30 12.3 12.3 1.77 3.5 EX3 0.23 0.50 0.63 5.0 10.0 0.64 1.0 17 1.39 0.72 0.90 6.1 10.0 5.27 8.8 EX3,E17 1.62 0.69 0.86 6.1 10.0 5.88 9.91 EX4 0.0610.501 0.63 5.0 10.0 0.17 0.2 3 Town Center PUD, including consideration of all on -site and tributary off -site runoff. 1.5 Design Criteria (� This report was prepared to meet or exceed the submittal requirements established in the City ail of Fort Collins' "Storm Drainage Design Criteria and Construction Standards" (SDDCCS), dated May 1984. Runoff computations were prepared for the 10-year minor and 100-year �I major storm frequency utilizing the rational method. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual" (UDFCD), 1984, developed by the Denver Regional Council of Governments, has been utilized. 1.6 Master Drainage Basin This site falls within the Spring Creek Major Drainage Basin and a report entitled "Spring Creek Master Drainageway Plan"was prepared by Engineering Professionals, Inc. in March 1988. This report provides a detailed storm drainage planning analysis for Spring Creek (®I through the City of Fort Collins, but the University Mall Redevelopment will not have an impact on the Spring Creek Major Drainage Basin. 2. HISTORIC (EXISTING) DRAINAGE The historic flows for this site looked at with respect to the proposed development consist of the currently existing drainage patterns. In general, the existing drainage patterns for this site consist of the routing of flows to existing area inlets in the east parking area of this site, the loading ramps at the rear of King Soopers, the existing businesses on the north and south, and the existing dirt area in the southwest corner of this site. The drainage from the westerly portion of this site is conveyed northerly along the westerly edge of the existing asphalt parking area to an existing swale which runs from the northwest corner of subject site and outfalls into the existing Sherwood Lateral. 2 1. INTRODUCTION 1.1 Project Location I University Town Center PUD is the proposed re -development of portions of the University �I Mall. This project is located in the Southeast One -Quarter of Section 23, Township 7 North, Range 69 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. (See FIGURE 1 - VICINITY MAP.) This project is bounded on the south by existing commercial development (McDonalds and the K-Mart Plaza Expansion, on the west by the Burlington Northern Railroad, on the north by Montgomery Wards, and on the east by College Avenue. More specifically, this site can be found on the west side of College Avenue, north and south of Columbia Road. 1.2 Site Characteristics ` The general topography of this site consists primarily of existing asphalt parking lot, buildings and curb, gutter and sidewalk. The southwest comer and westerly portion of the site consists of poorly to very poorly covered range type land. The slopes range from 0.5 to 3 percent. 1.3 Soils The soils for this site are comprised of the Nunn clay loams (73,74). (See FIGURE 2 - SOIL MAP ) The Nunn clay loams complex consists of nearly level soils on high terraces and fans. Pertinent characteristics of this soil include slow to medium runoff and a slight to moderate hazard of wind and water erosion. Nunn clay loams are categorized in Hydrologic Group C. The source for soil data is the "Soil Survey for Larimer County Area, Colorado', prepared by the United States Department of Agriculture Soil Conservation Service. 1 1.4 Purpose and Scope of Report This report defines the proposed preliminary drainage and erosion control plan for University i dl ITABLE OF CONTENTS IPAGE TABLE OF CONTENTS ..................................................... i 1. INTRODUCTION.....................................................1 1.1 Project Location.................................................1 1.2 Site Characteristics............................................... 1 1.3 Soils..........................................................1 1.4 Purpose and Scope of Report .......................................1 1.5 Design Criteria..................................................2 1.6 Master Drainage Basin ............................................ 2 2. HISTORIC (EXISTING) DRAINAGE ..................................... 2 3. DEVELOPED FLOWS ........... ........ `:........::................... 3.1 Method.......................................................4 4 3.2 Exterior Flows..................................................4 3.3 Onsite Flows...................................................4 3.4 General Flow Routing ............................................. 5 3.5 Proposed Drainage Plan ...........................................5 3.6 Hydrologic Analysis of the Proposed Drainage Conditions ................. 7 3.7 Allowable Street Flow Capacities .................................... 8 3.8 Inlet Design....................................................9 3.9 Storm Sewer Design.............................................9 5. EROSION CONTROL ................................................ 10 6. MISCELLANEOUS..................................................11 6.1 Variances.....................................................11 6.2 Irrigation Ditches...............................................II 6.3 Ditch Company Approval ......................................... I I 6.4 Maintenance Agreements ......................................... 11 7. REFERENCES......................................................II APPENDIX A - MAPS AND FIGURES APPENDIX B - HYDROLOGIC CALCULATIONS APPENDIX C - DETENTION CALCULATIONS T" Engineering, Ltd. (�J 4812 South College Avenue Fort Collins, Colorado 80525 (970) 282-4335 • FAX (970) 282-4340 January 22, 1996 Mr. Basil Hamdan City of Fort Collins Stormwater Utility 235 Mathews Street Fort Collins, Colorado 80524 Re: Preliminary Drainage and Erosion Control Report University Town Center PUD Fort Collins, Colorado Dear Basil: 4935 North 30th Street Colorado Springs, Colorado 80919 (719) 593-2593 • FAX (719) 528-6613 6110 Greenwood Plaza Blvd. Englewood, Colorado 80111 (303) 740-9393 • FAX (303) 721-9019 JR Engineering, Ltd. is pleased to submit the attached Preliminary Drainage and Erosion Control Report for University Town Center PUD for your review and approval. The hydraulic and hydrologic evaluation of the site was performed in accordance with the specifications set forth in the City of Fort Collins' "Storm Drainage Design and Criteria Manual". If you have any questions regarding the procedures, methodology, or results presented herein, please do not hesitate to contact me at your convenience. Sincerely, JR Engineering, Ltd. F. Scott Waterman, E.I. Project Engineer `�W -C David W. Klockeman, P.E. Project Manager Attachment Recycled PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT UNIVERSITY TOWN CENTER PUD Prepared for: ZTI GROUP 1220 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO 80524 Prepared by JR ENGINEERING, LTD. 4812 South College Avenue Fort Collins, Colorado 80525 (970)282-4335 January 22, 1996 Job Number 9059.00 r I r r r 3 _] _1 I _1 I I I PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT UNIVERSITY TOWN CENTER PUD I