HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 5TH FILING, HEALTHY LIVING CENTER - FDP - 32-98J - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTjy-AMVI � Executed recorded agreements (12 copies).
PIA e Other information Director may require:
- Natural area or environmental study
Revised May 31, 2002
i
City of Fort Collins
Submittal Checksheet
Final Compliance Review
The following information is required to be submitted, unless waived, with all
applications. Any item waived must be dated and initialed by a planner with the
City of Fort Collins Current Planning Department.
z Application form and filing fee.
Final site plan. See the submittal requirements for specific information to be presented on
the final site plan. (30 copies 24" x 36" — folded).
(4 / rjTEZ,e Subdivision Plat (23 copies 24" x 36" — folded).
` 7
Architectural elevations (6 copies 24" x 36" —folded).
Landscape Plan. Seethe submittal requirements for specific information to be presented
on the landscape plan. (20 copies 24" x 36" — folded).
Soils report (2 copies).
Drainage and erosion control report (4 copies).
ATT D. An update of the Transportation Impact Analysis (TIA) (6 copies).
It_77%`Z Final utility and drainage plans (13 copies 24" x 36" — unfolded).
NT-gLe Requirements for utility plans checklist (1 copy).
Subsurface Hydrologic Study (4 copies).
e, Certification that notice has been provided to the mineral estate owner (1 copy).
I Name and address of each owner of property within the boundaries of the development
plan area.
List of names of all general and/or limited partners, managers and directors and/or officers
and directors of the corporation involved as either applicants or owners.
Executed deeds of dedication (contingent on final approval).
Revised May 31, 2002