HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS - MAJOR AMENDMENT - 32-98C - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject:
Planner: boo 4::� cws Tralic Operations:
Engineer: Ae-A tifc("wi�
Date:
Items Requested
Site I land I Plat Utility I Drainage Rpt Other Items Required
Engineering
Redlined Items Being Returned
Site land Plat Utility Drainage R t Other Items Being Returned
Stormwater
water/wastewater—
—
TraMc Operations
Trans. Planning
✓
Z
Transfort
Natural Resources
Park Planning
Totals
-
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
G
—gotA
all
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
IN
WAIR11i WIN
BUILDING INSPECTION
LIGHT & POWER
MAPPING/ [)RAFTING
ADVANCE PLANNING
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
PUBLIC SERVICE
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
RAILROAD: UP or BN/CS
NoEl
����
WEI
WON
Elm
ON
No����
MOWN
�
E•vay
mmmmmumm