HomeMy WebLinkAboutPVH HARMONY CAMPUS (PHASE 1) - PDP - 32-98A - CORRESPONDENCE - (5)e) All CDOT issues must be resolved prior to the Planning and Zoning Board hearing, including the approval/denial of the right-in/right-out off of Harmony Road. f) Harmony Road will need to be designed in accordance with the new CDOT code that has recently been adopted. g) Additional comments and redlines are attached. 13. Comments from the Stormwater Utility are attached. 14. Comments from Water/Wastewater Utility are attached. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please provide a written response to each of the above stated comments with the submittal of plan revisions. Please contact me at 221-6750 if you have any questions or concerns that are related to the comments. If you would like to schedule a meeting, please call me as soon as possible. Revisions may be submitted at any time include the enclosed redlined plans. revisions required. Best Regards, Leanne A. Harter, AICP Project Planner With the submittal of revisions, please Please contact me for the number of xc: Greg Byrne, CPES Director Bob Blanchard, Current Planning Director Tim Blandford Stormwater Utility file/Project Planner 08/31/98 Comment Letter Page 10 9. Comments from Building Inspections are attached. 10. The Advance Planning Department offered the following comments: a) The campus walkways bear little resemblance to the ODP. It looks like the organizing framework is breaking down on phase 1. At the detail level, some specific issues are noted on the attached redlined plan. b) Timberwood Street bears little resemblance to the ODP or any other street for that matter. It looks like a driveway entrance to a commercial complex, rather than a public street. c) The building elevations are somewhat industrial. Differentiating the pedestrian (ground) level from the others is a key problem. The uniformity smothers the intrinsic differences that should mark the pedestrian level. d) These issues may need significant work, and possibly may not be minimal, cosmetic details. 11. Comments from the Transportation Planning Department are attached. 12. The Engineering Department offered the following comments: a) The study for the centerline along Harmony Road is currently underway. It must be communicated to the applicant that proceeding with revisions and additional submittal until such time that the study is completed may result in a delay of the review process. The delay may be that the ultimate location of the centerline will result in a significant shift in the location of the structures and related components on the site and landscape plans, as well as utility plans. b) There is a water line easement within the ROW along Timberline Road that must be shown on all plans. c) Staff does not support the t-intersection (Timberwood off of Timberline) as it will not function effectively. This issue will be discussed by staff at a coordination meeting and additional comments will be made at a later date. d) The transportation impact study will need to be modified so that it includes analyses of Timberwood and Snow Mesa and the anticipated volumes on these street. The level and timing of improvements will be directly related to the information presented in the modified TIS. 08/31/98 Comment Letter Page 9 h) Please provide a count of the number of parking spaces in each row on the site plan. i) Parking lots should not exceed 200 spaces per lot "section". j) Please show light poles on the site plan. k) The building dimensions or envelope dimensions need to be shown on the site plan. 1) A trash enclosure detail needed. m) For ease of use, the plat should be on one sheet instead of two. 1 "- 100' scale would accomplish this. 5. The Light and Power Utility offered the following comments: a) There is a 15' utility easement for electric adjacent and parallel to the south side of the Harmony Transmission Main. This easement should be shown on the plat. b) Street trees will need to be placed a minimum of 40' from planned streetlights. 6. The Colorado Department of Transportation offered the following comments: a) The future centerline Harmony Road ('ultimate") must be resolved. b) This project must dedicate adequate ROW for future 6-lane section and auxiliary lanes based on projected ultimate centerline. c) SH68 design should provide side slopes, ROW, etc., which follow requirements made for Celestica site. d) CDOT has not yet committed to RI/RO. If we allow, we must amend Access Control Plan. e) The issue of ROW for Timberline must be resolved. 7. The Environmental Planner with the Current Planning Department stated that "There should be at least one sidewalk paralleling the alignment of the private road which circles the northern portion of the site." 8. Comments from the Poudre Fire Authority are attached. 08/31/98 Comment Letter Page 8 b) All CDOT issues, including the ultimate SH68 design, will need to be resolved prior to hearing by the Planning and Zoning Board. c) Section 3.6.3(F) of the Land Use Code states that "All development plans shall incorporate and continue all sub -arterial streets stubbed to the boundary of the development plan by previously approved development plans or existing development. All development plans shall provide for future public street connections to adjacent developable parcels by providing a local street connection spaced at intervals not to exceed six hundred sixty (660) feet along each development plan boundary that abuts potentially developable or redevelopable land." The Timberwood connection will need to be discussed in this context and whether the timing of that connection is completed with this project development plan. d) All roadway improvements to Timberline and SH68 will need to be scheduled in the first phase. e) Show all improvements to the surrounding roadway network 3. TO of Fort Collins offered the following comments: a) After reviewing the plans which were sent to TCI of Fort Collins, I do not see the private utility easement which was granted on 9/29/94, RCPTN #94081194. 1 would like to see this added to the plat map so that the impact of landscaping and other factors on the easement. We will not vacate this easement. 4. The Zoning Department offered the following comments: a) Show handicapped parking space locations on the site plan. b) Show patterned crosswalk areas. c) The building is pretty bland —not a lot of architectural features. d) Entrances should have some sort of a covered area. e) A landscape buffer is required on the east side and screening of the parking east and center. f) Show retaining wall details (see requirements in Harmony Corridor standards). g) The majority of parking is visible along Harmony and Timberline. Couldn't the building be located closer to Harmony and Timberline and locate the parking more to the rear of the building? 08/31/98 Comment Letter Page 7 Landscape Plan a) Please add the standard landscape notes to the plan. b) Please provide the number of plantings. We need this information to verify that the proposal complies with the requirements of the minimum plant species diversity of Section 3.2.1. c) The word "Document" is spelled incorrectly. d) Please show the locations of the light poles and bicycle parking on the landscape plan so that we can review the plan for potential conflict. e) Trees are required along the north side of the road leading to the service entrance, as well as along both sides of the public road (Snow Mesa) entrance off of Harmony. f) All landscape medians must be landscaped and designed according to the requirements of the Land Use Code and the Harmony Corridor Standards and Guidelines. g) Provide parking lot screening in various locations of the site (see the attached plan) to comply with the requirements of Section 3.2.1 (E) (4) (b). h) Label all existing trees and label the plantings. i) The sidewalk along Timberline must connect to the south along the entire frontage of the project development plan. j) In areas, the project does not comply with the full tree stocking requirements of the Land Use Code. Full tree stocking is required in all landscape areas within 50' of any building or structure (Section 3.2.1(D)(1)(c). k) Street trees are required along both sides of the Snow Mesa entrance off of Harmony, as well as detached sidewalks along the frontage of the project development plan. 2. The City's Traffic Engineer offered the follow comments: a) Signal funding for both signalized intersections will need to be determined with this project development plan, including the escrow of funds if required. V 08/31/98 Comment Letter Page 6 c) Note that the public roads will be dedicated as public right of way, not as utility/access easements. d) The word "document' is spelled incorrectly on Sheet 4. Elevations a) The plans lack sufficient detail for a complete review. With revisions, please include measurements and scale, label all building materials on the elevations, and provide examples of colors. b) The elevations are not of the quality expected, and do not comply with the requirements of the Land Use Code, including, but not limited to, Section 3.5.1 Building and Project Compatibility. Section 3.5.1(B) Architectural Character states: "New developments in or adjacent to existing developed areas shall be compatible with the established architectural character of such areas by using a design that is complementary. Compatibility shall be achieved through techniques such as the repetition of roof lines, the use of similar proportions in building mass and outdoor spaces, similar relationships to the street, similar window and door patterns, and/or the use of building materials that have color shades and textures similar to those existing in the immediate area of the proposed infill development. Brick and stone masonry shall be considered compatible with wood framing and other materials." The elevations must include elements from the Harmony School and the history of that corner. The Harmony Corridor Plan states that "The historical heritage associated with the original community of Harmony is one of the interesting facts that make the Harmony Corridor unique. The colorful personalities associated with that area and their labor which created irrigated farmland, built charming Victorian houses, established a church, school and cemetery should not be forgotten." c) Section 3.5.1(F)(3) requires that "Mirror glass with a reflectivity or opacity of greater than 60% is prohibited." Do the windows proposed comply with this standard? d) Provide details of the porticos, including dimensions, building materials and location of lighting. All lighting located under these must be recessed. e) All primary entrances shall be clearly defined and recessed or framed by a sheltering element according to the requirements of Section 3.5.3(D)(4). f) Is there any rooftop mechanical equipment? This must be shown on the elevations and screened according to the requirements of the Land Use Code. 08/31/98 Comment Letter Page 5 p) Please provide a sidewalk connection through the northwest parking lot, going from the southwest to the northeast, connecting with the main spine from the comer of Horsetooth and Timberline. q) Please add a north arrow to the vicinity map. r) Please provide sidewalks along both sides of the entrance road (Snow Mesa) off of Harmony. s) Please note the height of the poles in General Note #6. t) Please add notes regarding bicycle parking and enhanced crosswalks. u) Please indicate upon what ratio the parking is based. v) The alignment of Timberwood as it comes off of Timberline does not match the alignment proposed on the Overall Development Plan. In addition, thereris great concern as to the manner in which a t- intersection would function at this location while carrying collector -level traffic volumes. The Project Development Plan must comply with the proposed alignments demonstrated on the Overall Development Plan, and all alignments, as they are public roads, must function to the level so that they comply with City standards. w) The pedestrian system that is shown on the Overall Development plan creates a good loop road, however, that same pattern is lacking on the project development plan. In areas, the sidewalk is located adjacent to the building and does not create an environment that is campus -like in its orientation. This pedestrian system must be enhanced if the space is to function as a campus and must be consistent with that shown on the ODP. x) Sidewalks (detached) should be added along the sides of the private drive to provide additional separation among vehicles, bicycles and pedestrians according to the requirements of Section 3.2.2(C). y) Please label all the surrounding land uses on the site plan. Plat a) Please revise the signature block so that it is the Director of Planning, not the Planning and Zoning Board. b) Please add zone districts and a north arrow to the vicinity map. 08/31/98 Comment Letter Page 4 exceed this number in two places (see attached site plan for specific locations) and must be "broken down" or reduced in size. b) Please mark all accessible spaces on the site plan. These must be at least 12' in width.) c) Is there any ground -mounted mechanical equipment? Please show the location on the site and landscape plans, and indicate in what manner all equipment is proposed to be screened. d) Please show the light pole locations on the plan. e) The signature block must be revised to read "Director of Planning" rather than the Planning and Zoning Board. f) Show all crosswalks on the site plan and indicate that they are to be enhanced. g) Next to the service entrance, detach the sidewalk so it is located at least 20' from the edge of the service area. h) The retaining wall exceeds the maximum height of 36" and, thus, will need to be engineered. i) Please remove the parking located to the west of the right in/right out off of Harmony. The addition of landscaping in this area strengthens the pedestrian loop road encircling the building and provides more greenspace between the building and the private drive. j) Please label the square footage of each building. k) Please provide a detail of the handicapped spaces. 1) Label the entrance road off of Timberline as a public road. m) The transit stop should be labeled as a transit shelter. Please provide details of the shelter, including design, size, etc. n) Add more to the 14 space bike rack pad (at the south -cafe area) to reduce backing conflicts. o) There are a couple of locations wherein backing conflicts may occur given the close proximity of parking spaces to the private drive. Please examine these and demonstrate how conflicts will be limited or remove the parking spaces. 08/31/98 Comment Letter Page 3 Context Diagram a) Please provide a scale and north arrow on the plans. b) Please show all the connections on the site and a part of the Overall Development Plan. c) Please label all surrounding land uses. d) Show the bicycle and pedestrian connections as well as the existing and proposed locations of transit stops. e) The word "boundary" is spelled incorrectly. Shadow Analysis a) The copies submitted are very difficult to read. The revisions submitted must be more clear to allow for a complete review. b) The word "shadow" is spelled incorrectly. c) Please include a scale on the plan. d) The Shadow Analysis doesn't match the site plan. There are areas wherein the parking areas are different (please see the attached redlines for the specific areas.) e) According to the requirements of Section 3.5.1(H)(1)(a)(1), you are required to demonstrate how the views are affected. This analysis must examine the views of Long's Peak as impacted from Harmony Road and the residential buildings to the east of the proposed site. Please submit visual analyses according to Section 3.5.1(H)(4)(b)(2)(a-c). Image Analysis a) The analysis does not match with the elevations. The elevations show flat roofs and the image analysis shows a pitched/hipped roof. Both plans must match. Site Plan a) Section 3.2.2(E)(6)(a) requires that "Large parking lots shall be divided into smaller sections by landscape areas. Each section shall contain a maximum of 200 parking spaces." The northeast and northwest lots 08/31/98 Comment Letter Page 2 Commur 7 Planning and Environmental F 'vices Current Planning City of Fort Collins August 27, 1998 BHA Design Angie Milewski 4803 Innovation Drive Fort Collins, Colorado 80525 RE. Comments on the Poudre Valley Health System Harmony Campus Project Development Plan Dear Angie: Staff has reviewed the submittal for the Poudre Valley Health System Harmony Campus Project Development Plan, #32-98`and would like to offer the following comments: 1. The Current Planning Department offered the following comments; Lighting Plan a) Please submit a photometric plan with the revisions for review and compliance with the Land Use Code. b) The lighting plan doesn't appear to include all of the PDP (there is more land to the east). All plans must be consistent. c) Please provide additional information on the conduit mount floodlight fixtures, including the following: • the light source must be high pressure sodium (no metal halide); • justify why these are needed; • where are they pointed; • what are their purpose; and • how are they mounted. d) Show the lighting on both the site and landscape plans and any lighting attached to the building on the elevations. e) The light source must be flush (see cut sheet). 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020