MEETING MINUTES
date:
November 3, 1998
date of meeting:
November 2, 1998
location of meeting:
bha design, inc.
project:
Poudre Valley Health Services - Harmony Campus
present at meeting:
Bob Blanchard, Current Planning
Matt Baker, Engineering
Keith Myers, Engineering
Tim Blandford, Engineering
Stuart MacMillan, Everitt
Travis Messina, Hammes
Theresa Michalak, Sear -Brown
Pam Miller, Sear -Brown
Rob Hume, Sear -Brown
Matt Delich
Angela Milewski, bha
distribution: Attendees
Bob Walsh, AKA
Pam Holmes, AKA
Dennis Ashley, Mortenson
subject: Harmony Road centerline coordination meeting
We met to discuss the centerline alignment received from the City last week. Matt Baker indicated the
City's proposed alignment was currently being reviewed by CDOT. Sear -Brown presented alternatives to
the alignment shown which included the following:
1. Adjustments to lane configuration on Harmony Road:
a. Elimination of EB accel/decel lane to accommodate Transit Pullout,
b. Change bike lanes from 10' to 8' width for safety reasons,
c. Change lane widths adjacent to median from 12' to 13'
d. Reduce NB north lane from 16' to 13' since a curb and gutter exists in this area
1. Adjustments to intersection design to make transition from six -lane to four -lane cross-section at the
intersection of Harmony and Timberline rather than further south.
2. Adjustment to centerline alignment of Timberline to facilitate the four -lane cross-section and its
connection to the existing centerline alignment to the south.
After discussion of the assumptions made by both the City and by Sear -Brown, Matt Baker felt that the
alignment needed to be reviewed again by City staff. He emphasized that Transportation and Traffic
Facilities should also be included in the decisions. He suggested that they review the matter at the weekly
Transportation coordination meeting this Thursday afternoon. Rob Hume will attend to answer any
questions regarding Sear -Brown's layout assumptions.
Please call to notify of any errors or omissions as soon as possible.
END OF MEETING MINUTES