HomeMy WebLinkAboutNEENAN OFFICE BUILDING - RC SITE PLAN REVIEW & MINOR SUBDIVISION - 5-96 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTlGeotechnical Engineering Exploration Terracon
•1 The Neenan Company
Project No. 20965009
Groundwater Conditions
JGroundwater was encountered at approximate depths of 5 to 11-1/2 feet in the test borings
at the time of field exploration. When checked 8 to 10 days after drilling, groundwater was
Jmeasured at approximate depths of 9 to 11 feet in the majority of the test borings. These
observations represent only current groundwater conditions, and may not be indicative of
other times, or at other locations. Groundwater levels can be expected to fluctuate with
varying seasonal and weather conditions.
Based upon review of U.S. Geological Survey maps ('Hillier, et al, 1983), regional
groundwater is expected to be encountered in unconsolidated alluvial deposits on the site, at
depths ranging from 0 to 5 feet below the existing ground surface at the project site.
Fluctuations in groundwater levels can best be determined by implementation of a
groundwater monitoring plan. Such a plan would include installation of groundwater
monitoring wells, and periodic measurement of groundwater levels over a sufficient period of
time.
The possibility of groundwater fluctuations should be considered when developing design
and construction plans for the project.
CONCLUSIONS AND RECOMMENDATIONS
Geotechnical Considerations
The site appears suitable for the proposed construction. Existing fill and debris will require
particular attention in the design and construction.
The following foundation systems were evaluated for use on the site:
• straight shaft piers and grade beams drilled into bedrock; and
• spread footings bearing on structural fill extended to the undisturbed soils.
In view of the nature of the fill material encountered at the site, it is our opinion that slab -on -
grade construction is not feasible without removal or reworking of at least the upper 3 feet
of the existing fill below slabs or by scarifying and recompacting the existing fill and
overlaying it by a minimum of 3 feet of select granular structural fill.
'Hillier, Donald E.; Schneider, Paul A., Jr.; and Hutchinson, E. Carter, 1983, Depth to Water Table (1979) in the
Boulder -Fort Collins -Greeley Area, Front Range Urban Corridor, Colorado, United States Geological Survey, Map 1-855-
1.
5
Geotechnical Engineering Exploration
The Neenan Company
Project No. 20965009
Terracon
surface. The bedrock is overlain by natural alluvial gravels of Pleistocene and/or Recent
Age and fill. The area lies within the flood plain of the Cache La Poudre River. We
understand the finished first floor of the building will be elevated above the 100-year flood
plain of the stream.
Mapping completed by the Colorado Geological Survey (Hart, 1972), indicates the site in an
area of "Low Swell Potential." Potentially expansive materials mapped in this area include
bedrock, weathered bedrock and colluvium (surficial units).
Soil and Bedrock Conditions
The following describes the characteristics of the primary soil strata in order of increasing
depths:
• Fill Material: A 1 to 14 foot layer of fill material was encountered in all borings drilled
at the site. The fill consists of a mixture of silty sand with gravel and cobbles, sandy
silt, washout concrete, chunks of concrete, brick, and minor amounts of wood and
asphalt. The fill has been place in an excavated gravel pit and does not appear to
have been uniformly or properly compacted. The fill is moist to wet, partially
cemented and loose to extremely dense.
• Well -Graded Gravel with Silt, Sand and Cobbles: This stratum underlies the fill in
Borings 1, 3 and 5 through 14 and extends to the bedrock below and/or the depths
explored. The well -graded gravel contains varying amounts of silt, sand and cobbles,
is moist to wet and medium dense to dense. It is estimated the cobbles within the
granular stratum are typically between 6 and 8 inches in diameter.
• Siltstone-Claystone Bedrock: The bedrock was encountered in Borings 1 through 11
at depths of 13-1/2 to 18-1/2 feet and extends to greater depths. The upper 1 to 1-
1/2 feet of the bedrock is highly weathered; however, the underlying interbedded
siltstone and claystone is hard.
Field and Laboratory Test Results
Field test results indicate the natural granular soils exhibit moderate bearing characteristics,
and the bedrock exhibits very high bearing characteristics. The bedrock also exhibits low to
moderate swell potential.
4
C
J Terracon
Geotechnical Engineering Exploration
The Neenan Company
Project No. 20965009
testing program was formulated to determine engineering properties of the subsurface
Jmaterials. Boring logs were prepared and are presented in Appendix A.
Selected soil and bedrock samples were tested for the following engineering properties:
• Water content Plasticity Index
JDry density Water soluble sulfate content
• Grain size
The significance and purpose of each laboratory test is described in Appendix C. Laboratory
test results are presented in Appendix B, and were used for the geotechnical engineering
analyses, and the development of foundation and earthwork recommendations. All
laboratory tests were performed in general accordance with the applicable ASTM, local or
other accepted standards.
SITE CONDITIONS
JThe site is a vacant area vegetated with native grass, weeds, brush and trees. The area
was previously mined for gravel and backfilled with construction debris including concrete
Jand washout material from concrete mixer trucks. The area is relatively flat and has poor
drainage. Several large piles of fill, 10 to 12 feet high, are scatted throughout the site along
J with piles of waste concrete, asphalt and concrete washout material. Berms have been built
along the east-northeast edge of the site. A bike path is located between the property and
the Cache La Poudre River, which is located to the north and east of the site.
SUBSURFACE CONDITIONS
l Geology
J The proposed area is located within the Colorado Piedmont section of the Great Plains
physiographic province. The Colorado Piedmont, formed during Late Tertiary and Early
Quaternary time (approximately 2,000,000 years ago), is a broad, eresional trench which
separates the Southern Rocky Mountains from the High Plains. Structurally, the site lies
along the western flank of the Denver Basin. During the Late Mesozoic and Early Cenozoic
Periods (approximately 70,000,000 years ago), intense tectonic activity occurred, causing
l the uplifting of the Front Range and associated downwarping of the Denver Basin to the
J east. Relatively flat uplands and broad valleys characterize the present-day topography of
the Colorado Piedmont in this region. The site is underlain by the Cretaceous Pierre
1 Formation. The Pierre shale underlies the site at depths of 13-1/2 to 18-1/2 feet below the
J 3
Geotechnical Engineering Exploration Terracon
The Neenan Company
Project No. 20965009
J SITE EXPLORATION
The scope of the services performed for this project included site reconnaissance by an
engineering geologist, a subsurface exploration program, laboratory testing and engineering
analysis.
Field Exploration
A total of 14 test borings were drilled on January 22 and 24, 1996 to depths of 15 to 24-1/2
feet at the locations shown on the Site Plan, Figure 1. Eleven borings were drilled within the
footprint of the proposed building, and three borings were drilled in the area of proposed
pavements. All borings were advanced with a truck -mounted drilling rig, utilizing 4-inch
diameter solid stem auger.
The borings were located in the field by pacing from property lines and/or existing site
features,. Elevations were taken at each boring location by measurements with an
engineer's level from a temporary bench mark (TBM) shown on the Site Plan. The accuracy
of boring locations and elevations should only be assumed to the level implied by the
methods used.
Continuous lithologic logs of each boring were recorded by the engineering geologist during
the drilling operations. At selected intervals, samples of the subsurface materials were taken
by driving split -spoon samplers.
Penetration resistance measurements were obtained by driving the split -spoon into the
subsurface materials with a 140-pound hammer falling 30 inches. The penetration
resistance value is a useful index to the consistency, relative density or hardness of the
materials encountered.
Groundwater measurements were made in each boring at the time of site exploration, and 8
to 10 days after drilling.
Laboratory Testing
All samples retrieved during the field exploration were returned to the laboratory for
observation by the project geotechnical engineer, and were classified in accordance with the
Unified Soil Classification System described in Appendix C. Samples of bedrock were
classified in accordance with the general notes for Bedrock Classification. At that time, the
field descriptions were confirmed or modified as necessary and an applicable laboratory
2
GEOTECHNICAL ENGINEERING REPORT
PROPOSED NEENAN OFFICE BUILDING
SEVEN LAKES BUSINESS PARK
FORT COLLINS, COLORADO
Project No. 20965009
February 5, 1996
INTRODUCTION
Terracon
J This report contains the results of our geotechnical engineering exploration for the proposed
Neenan office building to be located on Tract D of the Seven Lakes Business Park in east
Fort Collins, Colorado. The site is located in the Southeast 1/4 of Section 17, Township 7
North, Range 68 West of the 6th Principal Meridian.
The purpose of these services is to provide information and geotechnical engineering
recommendations relative to:
l subsurface soil and bedrock conditions
• groundwater conditions
l foundation design and construction
• lateral earth pressures
• floor slab design and construction
• pavement design and construction
1 earthwork
• drainage
J The conclusions and recommendations contained in this report are based upon the results
of field and laboratory testing, engineering analyses, and experience with similar soil
conditions, structures and our understanding of the proposed project.
PROPOSED CONSTRUCTION
Based on information provided by The Neenan Company, it is our understanding the
+ proposed structure is to a 43,000 square foot office building with associated parking. The
1 majority of the building will be a one-story structure with a partial story section. The finished
first floor will be elevated several feet above existing grade. The building will have precast
or site cast, tilt -up panel walls and interior steel columns. Anticipated wall and column loads
are 3 kips per linear foot and 90 kips, respectively.
1
Geotechnical Engineering Exploration
The Neenan Company
Project No. 20965009
TABLE OF CONTENTS (cont'd)
APPENDIX A
Site Plan and Boring Location Diagram
Logs of Borings
APPENDIX B
Laboratory Test Results
APPENDIX C
General Notes
Terracon
2
Terracon
TABLE OF CONTENTS
Letter of TransmittalPage No.
.............................................................................................................ii
INTRODUCTION.................................................................................................................1
PROPOSED CONSTRUCTION..........................'..............................................................1
SITEEXPLORATION..........................................................................................................2
FieldExploration......................................................................................................2
LaboratoryTesting.................................................................................................. 2
SITECONDITIONS............................................................................................................. 3
lSUBSURFACE CONDITIONS............................................................................................ 3
JGeology................................................................................................................... 3
Soil and Bedrock Conditions................................................................................... 4
Field and Laboratory Test Results........................................................................... 4
Groundwater Conditions.......................................................................................... 5
CONCLUSIONS AND RECOMMENDATIONS....................................................................
5
Geotechnical Considerations...................................................................................
5
FoundationSystems................................................................................................6
ShallowFoundation Systems..................................................................................
7
Lateral Earth Pressures...........................................................................................8
Seismic Considerations...........................................................................................9
Floor Slab Design and Construction........-..............................................................
9
Pavement Design and Construction........................................................................10
Earthwork................................................................................................................
13
Site Clearing and Subgrade Preparation.....................................................13
Excavation...................................................................................................14
Placement and Compaction.........................................................................15
Shrinkage.....................................................................................................16
Compliance..................................................................................................16
Excavation and Trench Construction...........................................................16
Drainage..................................................................................................................17
Surface Drainage.........................................................................................17
Subsurface Drainage...................................................................................17
Additional Design a; d Construction Considerations................................................18
Exterior Slab Design and Construction........................................................18
Underground Utility Systems........................................................................18
Corrosion Protection....................................................................................19
GENERALCOMMENTS.....................................................................................................19
1
February 5, 1996
The.,Neenan Company
P. O. Box 2127
Fort Collins, Colorado 80522
Attn: Mr. Kent Norwood
Irerracon
CONSULTANTS WESTERN, INC.
EMPIRE DIVISION
P.O. Box 503 • 301 N. Howes
Fort Collins, Colorado 80522
(970)484-0359 Fax (970) 484-0454
Larry G. O'Dell, P.E.
Neil.R. Sherrod, C.P.G.
Re: Geotechnical Engineering Report, Proposed Neenan Office Building
Seven Lakes Business Park, Fort Collins, Colorado
Project No. 20965009
Terracon Consultants Western, Inc., Empire Division has completed a geotechnical engineering
exploration for the proposed office building to be located in the Seven Lakes Business Park on East
Prospect Road, Fort Collins, Colorado. This study was performed in general accordance with our
proposal number D2096010 dated January 18, 1996.
The results of our engineering study, including the boring location diagram, laboratory test results, test
boring records, and the geotechnical recommendations needed to aid in the design and construction of
foundations and other earth connected phases of this project are attached. The subsoils at the site
consist of granular fill material containing concrete and debris underlain by natural gravels and
siltstone-claystone bedrock. In view of the anticipated loads of the proposed office building and the
subsurface conditions, it is recommended the structure be supported by a drilled pier foundation
system or by conventional spread footings placed on structural fill extended to the undisturbed soil.
Overexcavation of a portion of the existing fill material is recommended for slab -on -grade
construction. Further details are provided in this report.
We appreciate the opportunity to be of service to you on this phase of your project. If you have any
questions concerning this report, or if we may be of further service to you, please do not hesitate to
contact us.
Sincerely,
TERRACON CONSULTANTS WESTERN, INC.
Empire Division
Prepared by:
�\,.U�FOCA►EO �'/�y Reviewed by:
� 5 •.•••
0Q �B ••, �� �Q l) rr s : ��
2575 �gg
AEPG
76
ell d �� y '., illiam J. Attwoollq tP* �. 47,°
Senior Engineering Geolo a >.F�! R••••••q ns Office Manager
Mana
op,_ SHER•. .. g
Copies to: Addressee (3) 90008
{ ° 400
Offices of The Terracon Companies, Inc. Geotechnical, Environmental and Materials Engineers
Arizona ■ Arkansas ■ Colorado ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Minnesota
Missoud ■ Montana ■ Nebraska ■ Nevada ■ Oklahoma IN Texas ■ Utah ■ Wyoming
QUALITY ENGINEERING SINCE 1965
GEOTECHNICAL ENGINEERING REPORT
PROPOSED NEENAN OFFICE BUILDING
SEVEN LAKES BUSINESS PARK
FORT COLLINS, COLORADO
PROJECT NO. 20965009
February 5, 1996
Prepared for.
THE NEENAN COMPANY
P. O. BOX 2127
FORT COLLINS, COLORADO 80522
ATTN: MR. KENT NORWOOD
PROJECT ARCHITECT
Prepared by.
Terracon Consultants Western, Inc.
Empire Division
301 North Howes Street
Fort Collins, Colorado 80521
I
lrerracon