NOW, THEREFORE, in consideration of the benefit to be obtained by the Applicant through
the waiver of its rights to enforce the three (3) week review process by enabling the Applicant to
coordinate its preparation of the site and landscape plans and architectural designs with its
preparation of utility plans, the Applicant does hereby waive any and all rights that it may have to
enforce against the City the provision as contained in Section 29-414(a) of the City Code which
requires a decision of the Director of Planning regarding the site and landscape plans are
architectural designs within three (3) weeks of submission by.the Applicant.
DATED this � day of February, 1996.
ATTEST:
Seeretzt +
THE NE NAN COMPANY
a Colo do corporation
President
THIS WAIVER is executed this ff r day of February, 1996, by THE NEENAN
COMPANY, a Colorado corporation (hereinafter referred to as "Applicant").
WITNESSETH:
WHEREAS, the Applicant has proposed to the City of Fort Collins, Colorado (hereinafter
referred to as "City"), a subdivision of certain lands described on Exhibit "A" attached hereto and
incorporated herein by this reference, which lands are located in the R-C River Corridor Zoning
District in the City, which proposal requires, pursuant to Sections 29-414 and 29-419 of the City
Code, an administrative site plan review of the proposed site and landscape plans and architectural
designs (building elevations); and
WHEREAS, Section 29-414(a) contains a requirement that the administrative site Ian
review be conducted, and a decision made by the Director of Planning to approve, deny o di
the proposed plan within three (3) weeks of submission by the Applicant, and if not so made,
approval shall be deemed to have been given; and
WHEREAS, both the Applicant and the City recognize that the proposed project is complex
and will require the expenditure of considerable time both on the part of the Applicant and the City
in preparing and reviewing the plans required to be submitted pursuant to Section 29-414; and
WHEREAS, both the Applicant and the City are concerned that the documents necessary to
be prepared and reviewed will be sufficiently complex as to make it impossible to either adequately
prepare or review the same within the required three (3) week time period; and
WHEREAS, the Applicant is desirous of extending said three (3) week time period in order
to better coordinate its preparation of the site and landscape plans and building elevations with its
preparation of utility plans (which utility plans are not required to be reviewed under said three (3)
week time period); and
WHEREAS, the City desires to extend the aforesaid time period in order to afford it an
opportunity to better review the coordinated plans; and
WHEREAS, the Applicant understands and recognizes that the action of the Planning
Director upon the site and landscape plans and architectural designs (building elevations) as required
pursuant to Section 29414 does not constitute action by the City in approving any utility plans and
that it is the responsibility of the applicant to obtain separate approval of such utility plans prior to
the issuance of any building permit for the project.